Forwards Certificate of Compliance GDP-1,amend 1
ML20135E232
Person / Time
Site: 07007001
Issue date: 03/05/1997
From: Paeriello C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
Shared Package
ML20135E233 List:
References
TAC-L32001, NUDOCS 9703060369
Download: ML20135E232 (3)


Text

March 5, 1997 Mr. Jam:s H. Mill:r

< Vics Presid:nt, Production U. S. Enrichment Corporation 2 Democracy Center 6903 Rockledge Drive Bethesda, MD 20817 l

SUBJECT:

CERTIFICATE AMENDMENT REQUEST - PADUCAH GASEOUS DIFFUSION PLANT CASCADE CELL TRIP FUNCTION (TAC NO. L32001)

Dear Mr. Miller:

In accordance with your application dated September 30,1996, and pursuant to Part l 76 to Title 10 of the Code of Federal Regulations, Certificate of Compliance GDP-1 is

)

hereby amended to revise the limiting specific values for battery performance as l specified in Technice! Safety Requirement 2.4.4.12. Accordingly, Condition 9 has been revised to include the date of September 30,1996. This amendment becomes effective 60 days from the date of issuance.

To be more consistent, we have changed the wording in Condition 2 from Revision Number to Amendment Number.

All other conditions of this certit.cate shall remain the same.

Enclosed are copies of the revised Certificate of Compliance and the Compliance Evaluation Report, which includes the Categorical Exclusion determination.

Issuance of this amendment to your certificate closes Compliance Plan issue 48.

By this letter, we are informing you that the Nuclear Regulatory Commission does not plan to take any action on your request to modify Compliance Plan issue 14 to change the due date to November 22,1996, because the final Certificate of Compliance was not issued until November 26,1996. Our Resident inspector Office has confirmed the completion of the fire pump refurbishment; and we consider Issue 14 to be closed.

Sincerely, NBC HLE CENTER COPY Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards Docket 70-7001 Certificate GDP-1 Amendment 1

Enclosures:

As stated (2) cc: Mr. Randall DeVault. DOE U.h)

Mr. Steve Poiston, PGDP 060078 DISTHiBUTION: (Controf No. 010S)

HRC File Center - + PUBUC All! KO'Brien, Rill NMSS Dir. Off. r/f NMSS r/f FCS3 r/f FCOB SPBr/f GShear, Rlli CP/ PROOFED / FEBRUARY 3,1997 OFC SPB Sr'B SPB SPB FCSS Ng$%

NAME MHoo.rii DHoadley DMartin RPierson ETenEyck nello DATE 1/30/97 1/30/?7 1/30/97 1/30/97 //97 3 thB7 C = COVER E = COVER & ENCLOSURE N - 90 COPY OFFICIAL RECORD COPY 9703060369 970305 PDR ADOCK 07007001 C PDR ,

. Mr. J:m:s H. Mill r

< Vico Pr:sident, Production U. S. Enrichment Corporation

. 2 Democracy Center 6903 Rockledge Drive Bethesda, MD 20817

SUBJECT:

CERTIFICATE AMENDMENT REQUEST - PADUCAH GASEO, S DIFFUSION PLANT CASCADE CELL TRIP FUNCTION (TAC NO. L32001)

Dear Mr. Miller:

In accordance with your application dated September 30,199 , and pursuant to Part 76 to Title 10 of the Code of Federal Regulations, Certificatj[of Compliance GDP-1 is hereby amended to revise the limiting specific values for bettery performance as specified in Technical Safety Requirement 2.4.4.12. Apdordingly, Condition 9 has been revised to include the date of September 30,19 6.

To be more consistent, we have changed the wor ing in Condition 2 from Revision Number to Amendment Number.

All other conditions of this certificate shall main the same.

Enclosed are copies of the revised Certjficate of Compliance and the Compliance Evaluation Report, which includes the tategorical Exclusion determination.

Issuance of this amendment to certificate closes Compliance Plan issue 48.

By this letter, we are informir)0 you that the Nuclear Regulatory Commission does not plan to take any action on your request to modify Compliance Plan issue 14 to change the due date to Novemberj22,1996, because the final Certificate of Compliance was i not issued until November 26,1996. Our Resident inspector Office has confirmed the completion of the fire 'mp refurbishment; and we consider issue 14 to be closed.

Sincerely, i Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards Docket Certificate GDP- 70-700}1 Amendment 1

Enclosures:

s stated (2) cc: Mr. Da% Jackson, DOE Mr. St ve Polston, PGDP DISTNBUTION:,p(Control No. 0106)

NRC File Center' PUBUC Rill KO'Brien, Rill NMSS Dir. Off. r/f NM88 r/l FCSSr/f FCO8 SPS r/f GShear. Ritt CP/ PROOFED / FEBRUARY 3,1997 OFC SPS SPS SPB SPB FCSS NifAS , 7 NAME MHorn:4 DHoodley DMartin RPierson ETenEyck h mito EATE 1/30/97 1/30/97 1/30/97 1/30/97 / /97 7/h7 C = CU NR E = C NER & musuG5UIE N = 40 wri OFFICIAL RECORD COPY

. . . -- --- - - _ _ - . . - . ~ - . - - - - . . . . - - -

3 Mr.' J:mes H. Millir ,

1=

Vica Pr sidInt, Production '

U. S. Enrichment Corporation

. 2 Democracy Center 3

6903 Rockledge Drive

Bethesda, MD 20817

/

j.

/

SUBJECT:

CERTIFICATE AMENDMENT REQUEST - PADUCAH GASECUS DIFFUSION

[ PLANT CASCADE CELL TRIP FUNCTION (TAC NO. L32001)

I '

Dear Mr. Miller:

f /

in accordance with your application dated September 30,1996, and pursuant to Part 76

. to Title 10 of the Code of Federal Regulations, Certificate of Compliance GDP-1 is hereby

amended to revise the limiting specific values' for tiattery performance as specified in  ;

l Technical Safety Requirement 2.4.4.12. A'ccordingly,' Condition 9 has been revised to  ;

i

  • include the date of September 30,1996/ <

t f To be more consistent, we have changed the wording in Condition 2 from Revision  !

l Number to Amendment Nurnber.f '

. t

/-

l All other conditions of this ce Ificate shall t,emain the same. ,

i ,

Enclosed are copies of the revised Certificate of Compliance and the Compliance i

Evaluation Report, whict[inclijdes the Cat'egorical Exclusion determination.

[  ; y f '. n i Issuance of this amendment to your certificate closes Compliance Plan issue 48. '

j -  ; 4 ,

^*

l By this letter; wp are informing you that the'NRC does not plan to take any action on your request to modify Compliance Plan Issue 1.4 to change the due date to November 22, 1996, beca6fie the fina' l Certificate of Compliance was not issued until November 26, f 1996. 'Ourf Resident inspector Office has confirmed the completion of the fire pump . ,

refurbishment; and we conWar issue 14 to be closed.  :

, x _

4 ,

Sincerely,

- Carl J. Paperiello, Director

' Office of Nuclear Material Safety

and Safeguards
Docket 70-7001
j. Certificate GDP-1 E
Amendment 1 l

Enclosures:

1. Certificate of Compliance GDP-1 2
2. Compliance Evaluation Report i- cc: Mr. Dale Jackson, DOE
  • Mr. Steve Polston, PGDP

. DISTRIBUTION: ICont,ol No. 010S)

Docket 70 7001 NRC File Center PUBUC Rlli KO'Brien. Mill NMSS t/f FCSS r/f FCOB SPB r/f GSheer, Rill MMusses,-&9ee= 7N b

'0FC - SPS b $P8 h SPp_ SPB , f FCSS NMSS j_ mAmE NMi.rn:s M M oeme, [/Mertin Mon ETenEyck CPeperiello DATE c .m _.

I f;A7 E o mn . .. z-

//97 /10si' u - mm tM i /s7 i /S7 OFFICIAL fECORD COPY

. .