ML20135E178

From kanterella
Jump to navigation Jump to search
Responds to Tm Novak 850724 Request for Info Re Probability of upper-head Injection Isolation Failure.Failure at McGuire Unit 1 Occurred on 841031 Due to Incorrectly Installed Accumulator Level Transmitters
ML20135E178
Person / Time
Site: Mcguire, Catawba, McGuire, 05000000
Issue date: 09/10/1985
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8509160309
Download: ML20135E178 (2)


Text

.

. _ _.-~

J g

DUKE POWER GOMP.OT P.O. HOX 03180 l

CHARLOTTE. N,0. 28242 HALB. TUCKER Tromenoxe i

vice ramminemy (704) 073-4531 arctaan peopexvion i

September 10, 1985 l

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 i

Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4 l

Subject:

McGuire Nuclear Station Y

Docket Nos. 50-369 and 50-370 4

Catawba Nuclear Station I

Docket Nos. 50-413 and 50-414 Request for Information Regarding Probability of UHI Isolation Failure

Dear Mr. Denton:

In response to Mr. T. M. Novak's letter of July 24, 1985 requesting that we

"... provide information as to the demand and failure frequencies of the isolation function such as acquired from test and maintenaner activities (i.e., provide the demand and failure frequencies relating to challenges to the electrical and mechanical components of the UHI System upon actuation of isolation signals and identify the associated cause for each failure)."

We have reviewed our records and have retrieved the following data.

Catawba, Unit 1 7 system demands 0 failures McGuire, Units 1 and 2 25 system demands 1 failure i

The failure at McGuire occurred on Unit 1 on October 31, 1984 as the result of incorrectly installed accumulator level transmitters (Unit 2 transmitters were correctly installed). Also at this time, it was discovered that the j

transmitters were miscalibrated and would have closed early. The Unit 1 l

transmitters were teinstalled correctly and the transmitters on both units i

were recalibrated. For further detail, please refer to Licensee Event Report 369/84-30 dated December 3, 1984 and supplemented by letter of December 19, l

1984; also reference Civil Penalty: EA84-130.

eso9160309 eso910 PDR ADOCK 05000%9 i

s PDR d

t 1

1 i 0 t

Mr. Harold R. Denton, Director September 10, 1985 Page 2 If you need further information, please contact us.

Very truly yours,

/fh Hal B. Tucker JBD:smh cc: