ML20135E145

From kanterella
Jump to navigation Jump to search

Ack Receipt of Responding to Re Request for Info,Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info
ML20135E145
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/28/1997
From: Kugler A
NRC (Affiliation Not Assigned)
To: Gipson D
DETROIT EDISON CO.
References
TAC-M97591, NUDOCS 9703060288
Download: ML20135E145 (3)


Text

_

____m

+

February 26, 1997 Mr. Douglas R. Gipson I

Senior Vice President Nuclear Generation Detroit Edison Company

{

6400 North Dixie Highway Newport, MI 48166

~

SUBJECT:

RESPONSE TO OCTOBER 9,#1996 REQUEST FOR INFORMATION PURSUANT TO 10 CFR 50.54(f) REGARDING ADEQUACY AND. AVAILABILITY 0F DESIGN BASES INFORMATION (TAC NO.".v.97591).

Dear Mr. Gipson:

~

f 7

i We have received your February 7, 1997, response to our October 9, 1996, request for information pursuant to 10 CFR 50.54(f) regarding adequacy and i

availability of design bases information. :No additional information is needed j

at this time.

1 i

The NRC staff is currently evaluating your response.

Should.it.be determined that additional information is needed to complete the evaluation, I will notify you.

If you have any questions, please contact-me at 301-415-2828.

j l

Sincerely, Original signed by:

Andrew J. Kugler, Project Manager Project Directorate III-l Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No. 50-341 cc: See next page DISTRIBUTION IEN "

NRC RLE CEMTER COPY

/1 PD3-1 R/F J. Roe E.Adensam (EGAl)

D. Solorio K. Thomas

/

P. Lougheed, RIII G. Harris, fermi SRI DOCUMENT NAME:

G:\\WPDOCS\\ FERMI \\FE-97591.ACK Ta,oce6ve a copy of this document, Indicate in the ben: 'C' = Copy without ettechment/enclo,ure

  • E* = Copy with attachment / enclosure "N" = No copy 0FFICE PM:PD31 C

LA:PD31 C

RIII en r>N.

C D:PD31j) l NAME AKugler: W CJamerson nb SDupont & h. jdHannon l

d i DATE 02/L7/97 U 02/2/7/97

"//

02/12/97

_ (02/J17/97 l

OFFICIAL RECORD COPY 9703060288 970228 DR ADOCK 05000341

+

PDR v

6 SA8ACoq p

UNITED STATES g

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. enmas anni o

49*****

,o February 28, 1997 Mr. Douglas R. Gipson Senior Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

RESPONSE TO OCTOBER 9, 1996 REQUEST FOR INFORMATION PURSUANT TO 10 CFR 50.54(f) REGARDING ADEQUACY AND AVAILABILITY OF DESIGN BASES INFORMATION (TAC N0. M97591)

Dear Mr. Gipson:

We have received your February 7, 1997, response to'our October 9, 1996, request for information pursuant to 10 CFR 50.54(f) regarding the adequacy and availability of design bases information. No additional information is needed at this time.

The NRC staff is currently evaluating your response. Should it be determined that additional information is needed to complete the evaluation, I will notify you.

If you have any questions, please contact me at 301-415-2828.

Sincerely, Andrew. Kugler, Project Manager Project Directorate III-l j

Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No. 50-341 cc: See next page

o, c>.

Mr. Douglas R. Gipson Fermi-2 Detroit Edison Company cc:

John Flynn, Esquire Senior Attorney i

Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr Blvd P. O. Box 30630 CPH Mailroom Lansing, Michigan 48909-8130 U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Emergency Management Division 963 South Raisinville Monroe, Michigan 48161 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Peter W. Smith

/

Director, Nuclear Licensing Detroit Edison Company Fermi 270 TAC 6400 North Dixie Highway 4

Newport, Michigan 48166 j

l seynamber 1996