ML20135E068
| ML20135E068 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 02/28/1997 |
| From: | Brockman K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20135E072 | List: |
| References | |
| NUDOCS 9703060243 | |
| Download: ML20135E068 (4) | |
See also: IR 05000483/1997004
Text
. . _ .
f C'4,
UNITED SVATES
4
I
- $
. *.
NUCLEAR REGULATORY COMMISSION
.
'
REGloN IV
%
Y ,,
[8
611 RYAN PLAZA DRIVE, sulTE 400
S
AR LINGTON, T EXAS 760118064
....*
FEB 2 8 99T
Donald F. Schnell, Senior Vice
President - Nuclear
Union Electric Company
P.O. Box 66149
St. Louis, Missouri 63166-6149
SUBJECT: NRC INSPECTION REPORT 50-483/97-04
Dear Mr. Schnell:
An NRC inspection was conducted January 27-31,1997, at your Callaway Plant reactor
facility. A followup telephone conversation was held on February 7,1997, between
Mr. M. Reidmeyer of your staff, and Mr. L. Ricketson of this office to discuss changes
made to your offsite dose calculation manual. The enclosed report presents the scope and
results of that inspection.
Overall, the programs involved with radiation protection personnel training, management
oversight of radiation protection activities, and maintaining radiation exposures as low as is
reasonably achievable were properly implemented.
One unresolved item was identified concerning changes made to the offsite dose
calculation manual. This matter is discussed in Section 8.1 of the enclosed inspection
report. The issue of whether changes to your offsite dose calculation manual were
conducted in accordance with the requirements of Technical Specification 6.14 will remain
unresolved pending a review of the changes and your justification for the changes by the
Office of Nuclear Reactor Regulation.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room.
Shou!d you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
/ & ,h re t e
enneth
oc
an, Acting Director
1
Division of Reactor Safety
Docket No.: 50-483
l
License No.: NPF-30
9703060243 970220
ADOCK 05000483
G
&k
.
>
.
l
t
-
Union Electric Company
-2-
i
Enclosure:
NRC Inspection Report
50-483/97 "4
cc w/ enclosure:
Professional Nuclear Consulting, Inc.
19041 Raines Drive
Derwood, Maryland 20855
Gerald Charnoff, Esq.
Thomas A. Baxter, Esq.
Shaw, Pittman, Potts & Trowbridge
j
2300 N. Street, N.W.
'
Washington, D.C. 20037
j
1
H. D. Bono, Supervising Engineer
Site Licensing
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
G. L. Randolph, Vice President
'
Nuclear Operations
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
Manager - Electric Department
Missouri Public Service Commission
301 W. High
P.O. Box 360
Jefferson City, Missouri 65102
Ronald A. Kucera, Deputy Director
Department of Natural Resources
P.O. Box 176
Jefferson City, Missouri 65102
Neil S. Carns, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
l
P.O. Box 411
l
Burlington, Kansas 66839
l
I
I
j
\\
-
1
i
.
3-
Union Electric Company
.-
Dan 1. Bolef, President
Kay Drey, Representative
Board of Directors Coalition
j
for the Environment
-]
6267 Delmar Boulevard
!
University City, Missouri 63130
i
<
Lee Fritz, Presiding Commissioner
]
Callaway County Court House
i
10 East Fifth Street
I
Fulton, Missouri 65151
Alan C. Passwater, Manager
)
- Licensing and Fuels
Union Electric Company.
. P.O. Box 66149
St. Louis, Missouri 63166-6149
'
J. V. Laux, Manager
-
Quality Assurance
Union Electric Company
.
P.O. Box 620
Fulton, Missouri 65251
l
!
I
1
e
l
,
i
1
l
I
.
.!)
Union Electric Company
-4-
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DMB (IE06)
l
'
bec distrib. by RIV:
Regional Administrator
Resident inspector
'
DRP Director
DRS-PSB
Branch Chief (DRP/B)
MIS System
Project Engineer (DRP/B)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
'
>.
DOCUMENT NAME: R:\\_CW\\CW704RP.LTR
To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" = No copy
RIV:SRS:PSB jE
C:PSB
E
AD:DRP
N
AD:DRS
lN,
_
LTRicketsorg
BMurray p)
ATHowell y$v KEBrockganllj /
f
'
'
02b//97
02@97 ~
02/)f97
02/(f97'
OFFICIAL RECORD COPY
__j
. . . ~
. . . . . ~
.
_ .
. - . . . . - - _
_ . .
- - . _ . - , .
~ . . - - _ -
- . -
. . .
.
i
1
.
Union Electric Company
-4-
'
!
!
l
i
i
$
j-
E-Mail report to T. Boyce (THB)
I
E-Mail report to NRR Event Tracking System (IPAS)
,
E-Mail report to Document Control Desk (DOCDESK)
.
,
i
'
bec to DMB (IE06)
!
J
bec distrib. by RIV:
i
Regional Administrator '
Resident inspector
j
!
DRP Director .
DRS-PSB
!
Branch Chief (DRP/B)
MIS System
Project Engineer (DRP/B)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
,
,
i
-
F
}
)
i
4
'
- l'
'
1
1
!
.
!
!
!
a
e
'
i
!
t
i
i
,
i
DOCUMENT NAME: R:\\ CW\\CW704RP.LTR
To receive copy of docamont, Indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" = No copy
'
RIV:SRS:PSB
E
C:PSB
E
AD:DRP
N
AD:DRS
9,
_
_
LTRicketsorg
BMurray f)
ATHowell W KEBrockyntljf/
!
02p//97
02g397"'
02/p97
02/(f97'
l
'
'
OFFICIAL RECORD COPY
i
t
i
L