l
.
/ "GW,
t
%
NUCLEAR REGULATORY COMMISSION
-
h.
. g
'
REGION IV
s .*
.
g
Gil RY AN PLAZA DRIVE, SulTE 400
- '5
V
9....*/
AR LINGToN, T E X AS 76011 8064
FEB 2 81997
S. K. Gambhir, Division Manager
i
Production Engineering
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
Hwy. 75 - North of Fort Calhoun
l
Fort Calhoun, Nebraska 68023-0399
SUBJECT: NRC INSPECTION REPORT 50-285/96-018
Dear Mr. Gambhir:
An NRC inspection was conducted December 29,1996, through February 8,1997, at your
Fort Calhoun Station reactor facility. The enclosed report presents the scope and results of
i
that inspection.
>
During the inspection, two unresolved items involving configuration control were identified.
l
In one instance, NRC inspectors identified a missing flinger ring on a component cooling
j
water pump. In addition, three other examples regarding implementation of the Fort
Calhoun Station configuration control program were identified. Proper implementation of
!
the configuration control program is essential to ensure that plant physical and functional
!
characteristics are consistent with and being maintained in accordance with licensing and
l
design bases. The instances identified indicate weaknesses in implementing administrative
i
procedures. This issue will be reviewed further in a future inspection.
'
!
An additional unresolved item was identified concerning potential cable routing
t
deficiencies. This matter is discussed in Section E1.1 of the enclosed inspection report.
This item remains unresolved pending further review by the inspectors.
i
!
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
l
and its enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
'
Sincerely,
,
Arthur T. Howell I
Acting Director
'
Division of Reactor Projects
/
9703060199 970228
//
ADOCK 05000285
"
l
0
1
p.ssspppsu.as
.
.
)
a
O
r
.
Omaha Public Power District
-2-
F
!
Docket No.: 50-285
i
License No.: DPR-40
,
Enclosure:
NRC Inspection Report
i
50-285/96-018
l
!
cc w/ enclosure:
James W. Tills, Manager
Nuclear Licensing
!
Omaha Public Power District
!
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
Hwy. 75 - North of Fort Calhoun
)
Fort Calhoun, Nebraska 68023-0399
James W. Chase, Manager
Fort Calhoun Station
i
P.O. Box 399
)
Fort Calhoun, Nebraska 68023
Perry D. Robinson, Esq.
Winston & Strawn
1400 L. Street, N.W.
Washington, D.C. 20005-3502
Chairman
Washington County Board of Supervisors
Blair, Nebraska 68008
Cheryl Rogers, LLRW Program Manager
Environmental Protection Section
Nebraska Department of Health
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
... . . . . . - . _ . . _ . . - _ . _
_ _ .
._ _ _ ._ _. _ _ _ - -_ _._. . . . _
.
.
Omaha Public Power District
-4-
FEB 2 81997
1
l
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Dan Taylor (DRT)
bec to DMB (IE01)
bec distrib. by RIV:
L. J. Callan
DRS-PSB
DRP Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Branch Chief (DRP/TSS)
Resident inspector
DOCUMENT NAME: R:\\_FCS\\FC618RP.WCW
To receive copy of1locument, indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" = No copy
RIV: SRI:DRPS g
C:DRP/B( }
AD:DR,P/
i
WCWalker:nc'(4 (
WDJohnsBh
ATHoWdll
2/ $97
)
2/cp/97
' '
2/p/97
'
3
OFFICIAL RECORD CO 'Y
m
.
.
Omaha Public Power District
-4-
FEB 2 81997
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Dan Taylor (DRT)
bec to DMB (IE01)
bec distrib. by RIV:
L. J. Callan
DRS-PSB
DRP Director
MIS Systern
Branch Chief (DRP/B)
R'/ File
Project Engineer (DRP/B)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Branch Chief (DRP/TSS)
Resident inspector
DOCUMENT NAME: R:\\_FCS\\FC618RP.WCW
To receive copy oMocument, indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" = No copy
RIV:SRl:DRP/B b
C:DRP/B( )
AD:DR_Pg
l
l
WCWalker:ncM \\l
WDJohnsb~[f
ATHoWdll
2/ $97
' '
2/p/97 '
2/p/97
3
OFFICIAL RECORD CO)Y
-