ML20135D968
| ML20135D968 | |
| Person / Time | |
|---|---|
| Site: | 05200003 |
| Issue date: | 03/04/1997 |
| From: | Huffman W NRC (Affiliation Not Assigned) |
| To: | Quay T NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9703060155 | |
| Download: ML20135D968 (4) | |
Text
.
March 4, 1997 l
MEMORANDUM T0:.ThaodoreIR. Quay, Director Standardization Project Directorate j
Division of Reactor Program Management,iNRR FROM:
William C.!Huffman, Project Manager original signed by:
Standardization Project Directorate Division of Reactor Program Management, NRR l
SUBJECT:
NOTICE OF AP600 RELATED MEETING WITH WESTINGHOUSE TO DISCUSS THE NOTRUMP SMALL BEAK LOSS-OF-COOLANT ACCIDENT CODE VERIFICA-TION AND VALIDATION 1,
i DATE AND TIME:' March 13, 1997 - 8 a.m. - 4 p.m.
LOCATION:
WestingPouse Electric Corporation F
One Montrose Metro 11921 Rockville Pike Rockville, Maryland 20852 Suite 450 PURPOSE:
Westinghouse-to discuss final AP600 NOTRUMP validation report results with emphasis on SPES and OSU. NOTRUMP related items to be discussed before the ACRS will also be reviewed.- See attached proposed agenda.
PARTICIPANTS *:
NfK WESTINGHOUSE R. Landry E. Novendstern B. Huffman, et al.
L. Hochreiter, et al.
Docket No.52-003
Attachment:
As stated cc w/ attachment:
See'next page
- Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344, 9/20/94.
However, portions of this meeting may be closed to protect Westinghouse proprietary information. Members of the public who wish to attend should contact me at (301) 415-1141..
DISTRIBUTION:
See next page j
n, MENT NAME:
DOCU A:NTRMPV&V wm.
mm w NOT
. w c. cm m.,.n.a.n.nu.ne.
r - em e.n.a nu.ne.
n. u..y 0FFICE PM:PD J:DRPM D:PDST:DRPM l
NAME WCHuffman W A TRQuay TM DATE 03/9/97 03/9/97 e
0FFICIAL RECORD COPY 9703060155 970304 PDR ADOCK 05200003 A
.PDR
.__..._._.._.._,-.___.m t
i.
4
~
i Westinghouse Electric Corporation Docket No.52-003 i
cc: Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis U.S. Department of Energy, NE-42 Nuclear and Advanced Technology Division Office of LWR Safety and Technology J
Westinghouse Electric Corporation 19901 Germantown Road P.O. Box 355 Germantown, MD 20874 l
Pittsburgh, PA.15230 Mr. Ronald Simard, Director Mr. B. A. McIntyre Advanced Reactor Program i
Advanced Plant Safety & Licensing Nuclear Energy Institute i
j Westinghouse Electric Corporation 1776 Eye Street, N.W.
Energy Systems Business Unit Suite 300 Box 355 Washington, DC 20006-3706 i
Pittsburgh, PA 15230 l
Ms. Lynn Connor Ms. Cindy L. Haag Doc-Search Associates i
Advanced Plant Safety & Licensing Post Office Box 34 i
Westinghouse Electric Corporation Cabin John, MD 20818 Energy Systaa:s Business Unit 4
Box 355 Mr. James E. Quinn, Projects Manager Pittsburgh, PA 15230 LMR and SBWR Programs GE Nuclear Energy i
Mr. M. D. Beaumont 175 Curtner Avenue, M/C 165 Nuclear and Advanced Technn4gy Division San Jose, CA 95125 Westinghouse Electric Corpon tion One Montrose Metro Mr. Robert H. Buchholz 11921 Rockville Pike GE Nuclear Energy Suite 350 175 Curtner Avenue, MC-781 Rockville, MD 20852 San hse, CA 95125 l
Mr. Sterling Franks Barton Z. Cowan, Esq.
U.S. Department of Energy Eckert Seamans Cherin & Mellott 1
NE-50 600 Grant Street 42nd Floor 19901 Germantown Road Pittsburgh, PA 15219 j
Germantown, MD 20874 i
Mr. Ed Rodwell, Manager Mr. S. M. Modro PWR Design Certiftcation
]
Nuclear Systems Analysis Technologies Electric Power Research Institute Lockheed Idaho Technologies Company 3412 Hillview Avenue Post Office Box 1625 Palo Alto, CA 94303 Idaho Falls, ID 83415 Mr. Charles Thompson, Nuclear Engineer AP600 Certification HE-$a
.lfMI Germantown Road Germantown, MD 20874
i 1
4 PROPOSED AGENDA FOR MARCH 13, 1997 NOTRUMP AP600 FINAL VALIDATION REPORT NEETING 1.
Introduction I
2.
SPES Results i
3.
0$i.' Results i
4.
ACRS Neeting Preparations j
(a)
Executive Summary (b)
Proposed Agenda (C)
NRC Feedback 5.
Documentation Closure (a)
Report (b)
RAIs/Open Items /DSER 6.
Wrap-up Attachment
., ' ~
p w.
7
.1 i
I E\\.
DISTRIBUTION:' Men.orandum to Theodore' R. ' Ouay. Dated: March 4. 1997 Docket File:
.PUBLIC
~
r PDST R/F 1~
Scullins/FMiraglia, 0 12 G18' l
.i AThadani, 0-12 GIS
~
RZimmerman, 0-12 G18 TMartin TJKenyon DTJackson i
WCHuffman
)
JMSebrosky WDean, 0-17 G21 JMoore, 0-15 B18 ACRS (11)
Alevin, 0-8 E23 RLandry, 0-8 E23 JLyons 0-8 E23 GHolahan, 0-8 E2 i
FEltawila,1-10 E46 PMNS (e-mail) 1 OPA (e-mail) i r
i l
q 1
4 l
i
\\@
I e
1 050103 j