ML20135D918

From kanterella
Jump to navigation Jump to search
Forwards LERs 85-039-00 & 85-040-00
Date released: 05/28/2020 Download: ML20135D918


:on 850807,RHR Low Flow Alarm Bypassed When Alternate Flow Path Used.Caused by Failure to Monitor Flow Indicators After Low Flow Alarm Installation.Controls Implemented Requiring Operators to Monitor Alternate Path
ML20135D975
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/06/1985
From: Blind A
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML20135D975 (2)
:on 850808,buried Firewater Ring Header Sectionalizing Valve Excavated.Caused by Failure to Perform Tech Spec Surveillance Requirements Re Valve Position.Curb Box Installed.Valve Surveillance Procedures Updated
ML20135D936
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/06/1985
From: Baker K
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML20135D936 (2)
Forwards LERs 85-039-00 & 85-040-00
ML20135D913
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/06/1985
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
Download: ML20135D913 (1)