ML20135D854

From kanterella
Jump to navigation Jump to search
Insp Rept 70-7002/96-204 on 961104-06.No Violations Noted. Insp Results Withheld,Per 10CFR2.790
ML20135D854
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 12/05/1996
From: Ting P
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML19310D734 List:
References
70-7002-96-204, NUDOCS 9612100209
Download: ML20135D854 (1)


Text

__

'i DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED i

r a

U. S. NUCLEAR REGULATORY COMMISSION l

OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Observation Report No. 70-7002/96-204 Docket No. 70-7002

)

Facility Operator:

United States Enrichment Corporation 3930 U.S. Route 23 South l

P.O. Box 628 i

Piketon, Ohio 5661 Facility Name:

Portsmouth Gaseous Diffusion Plant Observations At:

Piketon, Ohio Observations Conducted:

November 4-6,1996

[

inspectors:

E. L. Eckfeld, MC&A Physical Scientist S. R. Caudill, MC&A Physical Scientist l

!f Approved by:

[

I

/

\\

Philip Ting, Chief Date Signed Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Authority Statement: The Department of Energy (DOE) and the Nuclear Regulatory Commission (NRC) have agreed to cooperate to facilitate the NRC's obtaining of information and knowledge regarding the gaseous diffusion plants' and the United States Enrichment Corporation's (USEC) operation thereof through observation / inspection activities during the interim period before the NRC assumes regulatory responsibility. This inspection report is a summary of NRC activities for the period stated above. Each of the observations was communicated to the DOE site safety representative and USEC site staff at the end of the observation period.

Enclosure DECONTROLLED WHEN 2.790 INFORMATION IS REMOVED DOCUMENT TRANSMITTED HEREWITH CONTAINS 2.790 INFORMATION 9612100209 961205 U'

PDR ADOCK 07007002 C

PDR

--