Osve Morey Southern Nuclear
- Vice President Operating Company Farley Project R0. Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 SOUTHERN December 5, 1996 COMPANY Energy to Serve YourWorld*
Docket No:
50-364 i
i U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, DC 20555 Joseph M Farley Nuclear Plant - Unit 2 Peakinc Factor Limit Reoort Ladies and Gentlemen:
Enclosed is the Peaking Factor Limit Report (PFLR) for Unit 2 Cycle 12. This report is provided in accordance with Paragraph 6.9.1.11 of the Unit 2 Technical Specifications. Technical Specification 6.9.1.11 requires that a PFLR be submitted prior to each reload cycle (prior to Mode i
2). Also enclosed is a copy of the elevation dependent peaking factor versus core height graph for i
Unit 2 Cycle 12, which is being submitted in support of the subject report.
ne enclosed PFLR was evaluated using the Explicit Shape Analysis for PCT Effects (ESHAPE) to ensure that the cosine shape remains the limiting power distribution in the large break loss of coolant accident (LOCA) analysis.
If you have questions, please advise.
Respectfully submitted, IN hlfw ll Dave Morey y
REM:maf peakf. doc 5 D'Q hI Enclosure cc:
Mr. S. D. Ebneter Mr. J. I. Zimmerman l
Mr. T. M. Ross l
l 9612090368 961205 PDR ADOCK O 34 P