Forwards Results of TLD Direct Radiation Environ Monitoring Around Facility for Fourth Quarter of 1996
ML20135D180
Person / Time
Issue date: 02/21/1997
From: Struckmeyer R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rowland T
ENERGY, DEPT. OF
References
REF-QA-99990081-970221 NUDOCS 9703050115
Download: ML20135D180 (3)


Text

.

t I

i i

I l

February 21, 1997 Mr. Thomas Rowland, Director U. S. Department of Energy, Ohio Field Office J

West Valley Demonstration Project 3

PO Box 191

)

West Valley, NY 14171 l

4 i

SUBJECT:

NRC TLD MONITORING AT WEST VALLEY, FOURTH QUARTER,1996

Dear Mr. Rowland:

i i

1 Enclosed is a copy of the TLD monitoring results around the subject facility for the fourth quarter of 1996. The large value noted for Station #11 is due to the proximity of this dosimeter to a waste storage facility located at the site. Similar results have been noted for i

each monitoring period.

j i

Sincerely, ORIGINAL SIGNED BY:

Richard K. Struckmeyer

[

4 j

Senior Radiation Specialist Emergency Preparedness and Safeguards Branch Division of Reactor Safety Docket No.

99990081 4

Enclosure:

As stated cc W/ encl P. Piciuto, NYSERDA State of New York l

l I

9703050115 970221

/

REG 1 GA999 EUSDOE 99990001 PDR i

- - ~.

l l

T. Rowland

{

Qistribution w/ encl:

Region I Docket Room (with concurrences).

l R. Struckrneyer, DRS G. C. Comfort, NMSS W. Dean, OEDO D. Screnci, PAO PUBLIC Nuclear Safety information Center (NSIC) l DRS File i

i r

i

)

i DOCUMENT NAME: A:\\WVALLTTR.964

v. w.

.r w w au w c-cm.e- =w.ww t-cm.a.=m-ww-r - so m

[0FFICE RI/DRS E RI/DRS

/ l A/

I lNAME RStruckmeyer#AX RKeimig L.

lDATE 02/20/97 02/t//9//

OFFICIAL RECORD COPY

[

P l

l WEST VALLEY TLD DIRECT ENVIRONMENTAL RADIATION MONITORING RESULTS a

Anneal date

09/11/ %

Field placement date

10/02/ %

Retrieval date

01/09/97 Readout date
01/29/97 i

Gross Monitoring Period 141 days (09/11/96 - 01/29/97)

Field Monitoring Period 100 days (10/02/96 - 01/09/97)

Transit Period 41 days l

Station Distance Direction Gross Exposure Net Exposure Number (miles)

(degrees)

(mR /133 days)

(mR / 90 days) 4 1

4.0 350 21.7 +/- 0.6 ; 3.2 15.8 +/- 0.7 ~; 4.1 2

3.6 144 23.8 +/- 0.7 ; 3.6 17.7 +/- 0.7 ; 4.3 3

1.5 92 22.3 +/- 0.7 ; 3.4 16.4 +/- 0.7 ; 4.2 4

1.2 51 23.0 +/- 0.7 ; 3.4 17.0 +/- 0.7 ; 4.3 5

2.1 10 Missing Dosimeter No Net Data 6

1.7 319 23.0 +/- 0.7 ; 3.4 16.9 +/- 0.7 ; 4.3 j

7 1.2 262 24.4 +/- 0.7 ; 3.7 18.3 +/- 0.7 ; 4.4 l

8 1.4 234 22.0 +/- 0.7 ; 3.3 16.1 +/- 0.7 ; 4.2 9

0.3 300 37.1 +/- 1.1 ; 5.6 29.6 +,- 1.1 ; 5.8 l

10 on-site 43 30.7 +/- 0.9 ; 4.6 23.9 +/- 0.9 ; 5.1 11 on-site 334 868 +/- 26 ; 130 778 +/- 23 ; 117 12 on-site 83 76.8 +/- 2.3 ;11.5 65.4 +/- 2.1 ;10.8 I

Transit Dose 4.1 +/- 0.4 ; 3.2

=

Results are reported as Measurement +/- Random error ; Total error (Total error = Random + Systematic) i J