ML20135D135

From kanterella
Jump to navigation Jump to search
Ltr Contract:Mod 2 to Task Order 1, Workshop on Radioactive Materials Regulation, Under Contract NRC-02-96-002
ML20135D135
Person / Time
Issue date: 11/21/1996
From: Mearse S
NRC OFFICE OF ADMINISTRATION (ADM)
To: Steve Ruffin
External (Affiliation Not Assigned)
References
CON-FIN-R-94096, CON-NRC-02-96-002, CON-NRC-2-96-2 NUDOCS 9612090261
Download: ML20135D135 (2)


Text

-

^

~

~

C CG2</

Sa uro k

UNITED STATES p

j NUCLEAR REGULATORY COMMISSION 1

2 WASHINGTON, D.C. 20086-0001

\\.m.f

/

November 21. 1996 Enercorg Federal Services Corporation ATTN: ateve Ruffin. President 1

414 Hungerford Drive. Suite 212 j

Rockville. MD 20850 J

Dear Mr. Ruffin:

Subject:

Modification No. 2 to Task Order No.1 - Exercise Optional Subtask 1.4. Entitled " Workshop on Radioactive Materials Regulation" Under Contract No. NRC-02-96-002 In accordance with Section G.4. Task Order Procedures. of the subject contract, this letter modifies Task Order No.1 to initiate work under Subtask 1.4 in the amount of $59.243. The period of performance for Subtask 1.4 is i

November 21, 1996 through February 18, 1997. As a result, the period of performance for Task Order No. 1 is hereby revised from " August 1. 1996 through January 8. 1997" to " August 1. 1996 through February 18, 1997."

i i

Please note that the period of performance for Subtasks 1.1.1.2. and 1.3 remains unchanged as follows:

l Subtask 1.1 - August 1. 1996 through December 31. 1996 Subtask 1.2

- August 1. 1996 through December 31, 1996 i

Subtask 1.3 -

October 11. 1996 through January 8. 1997 The total cost ceiling for the subject task order is hereby increased by

$59.243, from $135.640 to $194.883. Of the $194.883 cost ceiling, the amount 4

of $180.448 represents the reimbursable costs, and the amount of $14.435 represents the fixed fee.

The total amount obligated is hereby increased by $70.000 from $100.000 to

$170.000.

Of the $170.000, $100.000 was obligated under the basic contract and was used to fully fund Subtasks 1.1 and 1.2 ($78.574) and partially fund Subtask 1.3 ($21.426)

The $70.000 obligated by this action fully funds Subtask 1.3 (in an amount of $35.640) and partially funds Subtask 1.4 (in the amount of $34.360).

A summary of funds obligated to date. including this modification is as follows:

Basic T.0. #1 Mod. 1 to T.O. #1 Mod. 2 to T.O. #1 Subtasks 1.1 and 1.2 Subtask 1.3 Subtasks 1.3 and 1.4 B&R No.-

67M-50-700-000 67M-50-700-000 77M-60-817-202 FIN No.-

R94096 R944096 R9309 APPN No.:

31X0200.67M 31X0200.67M 31X0200 FFS:

5096R036 5096R036 5097R017 OBLIGATED AMOUNTS:

578.574

$21.426

$70.000 1

l{Q TOTAL OBLIGATED:

$170.000 9612090261 961121 PDR CONTR NRC-02-96-OO2 PDR

,.c?

Enercorp,

Of the $170.000 obligated, $157,407 represents reimbursable costs and $12,593 represents the fixed fee. The obligated amount will cover performance of work under this task order through January 15, 1997.

All other terms and conditions under this Task Order remain unchanged.

Please indicate your acceptance of this modification by having an official who is authorized to bind your organization, execute three copies of this document in the spaces provided below and return two fully executed copies to me.

You should retain the third copy for your records.

Sincerel,

7ih m aron D. Mearse. Contracting Officer Technical Acquisition Branch No. 1 Division of Contracts Office of Administration

Enclosure:

As stated ACCEPTED:

Stev-

~. Ruff NAME A~

President TITLE 11/ 3 //96 DATE j

i

\\