ML20135C957
| ML20135C957 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 02/24/1997 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9703040360 | |
| Download: ML20135C957 (2) | |
Text
_ _ _ _. _. _ _ _. _.. _
~
ctition support Department
&v PECO NUCLEAR reco s,,,,cem,,,,
A Unit of PECO Energy.
%*g.$' * 'd February 24,1997 Docket Nos. 504,52 50-353 1
Ucense Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
Limerick Generating Station, Units 1 and 2 Technical Specifications Change Request implementation Date Gentlemen:
The purpose of this letter is to notify the NRC of the implementation dates associated with recently issued Technical Specifications Change Requests (TSCR) for Umerick Generating Station.
)
TSCR #
BRIEF DESCRIPTION IMPLEMENTATION DATE 95-14 4 Appendix J, Option B January 24,1997 (both units) 96-01-0 ADS Valves Startup Testing February 3,1997 (both units) 96-07-0 Secondary Containment February 18,1997 Inleakage Rate (both units) 96-11 2 LGS-2 Cycle 5 SLMCPR Values Februar/ 20,1997 96_12-0 RHR Shutdown Cooling Loops February 3,1997 vs. Subsystems (both units) 96-15 New LGS-2 PTOL Curves January 16,1997 96-18-2 LGS-2 Cycle 4 SLMCPR (Not implemented -
Corrected Values superceded by 96-112 above) j 96-22-0 EDG Single Load Reject Test February 6,1997 (hnth Units) 9703040360 970224
~/
DR ADOCK O 3 2' i-(f I
M$.
mWM Y
()40100 l E M O.
d/4/p"ppsppsppg
/
tu t/Dc,w/s c s e I
i
s-February 24,1997 Page 2 if you have any questions, please do not hesitate to contact us.
i i
Very truly yours, i
// d 4,).
G. A. Hunger, Jr.,
I Director - Licensing 1
cc:
H. J. Miller, Administrator, Region 1 USNRC N. S. Perry, USNRC Senior Resident inspector, LGS j
R. R. Janati, PA Bureau of Radiological Protection i
4 I
i i