y J te JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1

' NARRATIVE

SUMMARY

OF OPERATIONS JUNE, 1985 i During the month of June, there were two (2) automatic' shutdowns which occurred on 6-8-85 and 6-23-85.

The following major safety-related maintenance was performed in'the

. month of June:

4

1. Miscellaneous corrective and preventive maintenance was d

performed on the diesel' generators.

2. Replacement of containment tendon field anchors is complete.

-3. Two control rod drive system cables were repaired. An electrical short had occurred in the containment electrical penetration causing the reactor trip on 6-23-85.

k-(

3 i 8509110516 PDR 850715 R ADOCM 05000348 PDR a

+

4 w . -- - - - - _ _ _ - _ _ - - . . . _ _ _ - _ _ . - - - - - . - . - - - - - - - - - _ _ - - . _ - _ . _ _ . - . - - - - - _ - _ _ - - - - . - - - - - - . . - . _ . - - . - - - . _ _ . - - - - - - - - - _ - _ _ . - - _ . - _ _ _ _ . - . - - . _ -

71 1 .~. . . _. . _ _ . _._

l OPERATING DATA REPORT 1

! DOCKET NO. 50-348 i . DATE Julv 3 1985 t

COMPLETED BY 3. D. Woodard

' TELEPHONE (205) 899-5156 OPERATING STATUS Joseph M. Far1ev - Unit 1 Notes

1. Unit Name: .

j 2. Reportug Penod:

June, 1985 1) Cumulative data since 2652 12-1-77, date of commercial

! 3. t *W Thermal Power (MWt): operation.

860

4. Namepiste Ratmg (Gross MWe):

829

5. Demen Electncal Rating (Net MWe):

860.9

6. Maximum Dependable Capacity (Gross MWe):

816.5

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A I

N/A

9. Power Level To Which Restncted.lf Any (Net MWe):
10. Reasons For Restrictions. If Any: N/A 1

f O .

This Month Yr.-to.Date Cumulative 720 4,343 66,455 4 11. Hours la Reportag Period 691.7 3,098.6 45,227.6

12. Number Of Hours Reactor Was Critical 0.0 o,o 3,650.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 670,7 2,986.6 44,011.0 nn 0.0 0.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1.655.189 7,533,878 111,434,453 540.662 2,435,952 35,530,266
17. Gross Electncal Energy Generated (MWH) 508,014 2,288,746 33,417,792
18. Net Electncal Energy Generated (MWH) _
19. Unit Service Factor 93.2 68.g 66.2
20. Unit Availability Factor 93.2 68.8 66.2 1

86.4 64.5 63.0

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 85.I 6,_6 60.7
23. Unit Forced Outage Rate 6.8 3.7 12.6

'4. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:

1 N/A

25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status iPrior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 08-06-77 08-09-77 INITIAL ELECTRICITY 08-20-77 08-18-77 COMMERCIAL OPERATION 12-01-77 12-01-77

DOCKET NO. 50-348 ]

1

- UNIT

- July 3, 1985 l DATE

' COMPLETED BY .T.D. Woodard (205) 899-5156 TELEPHONr.

b June, 1985 ,

310NTI!

4 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL QlWe-Net) OlWe-Net) 017 g, 546 g7 821 2 629 13

' ~~ ~

~~705 -- -------..__..__g9_. 821 4

3 - _ _ _ . _

4 *A 813 825 3 21 816 ,n 823 f 6 498 7 792 23 l g 0

34 37.5 l 9 357 ~

3 473 10 810 26 818

!! Al? 27 4

812 3 815

[2 l

13 819 3 R??

822 14 30 812 3g 15 1

l 16 812  ;

I 1

1

!?GUGONS On this form:t. list the aversge dssly unit power !cvet in MWe-Net for each d:y in the reporting month. Compute to j , the neare:t whole me;swatt.

.i (9(77) 4 O

. - . . - - - , - - - . - , . _ . - - . - - . . - . . , . ,, -._,.,n. , - , . - . - , , , _ , . - - - - - ~ , , , . . , . . , , , , _ , . - , - -

l O O O

DOCKET NO. 50-348 .

UNIT SilUTDOWNS AND POWER REDtXmONS UNIT NAME J. M. Fdrley - Unit 1 DATE Juiv 1. 1985 COMPLETED gay .T . n. Woodard REPORT MONTil Tne- 19R5

TELEPliONE (705) R99-5156 r, .

b.

.$ E Ej Liccusee E v, *L Cause & Cossective No. Date -

( gg ,, 3gx Event u? 3 Acehm to 6

o6 s2 jgg Repost # ,

dEU u Pstvent Hecunscuce 6

004 850600 F 25.2 G 3 85-010-00 AB BU A reactor' trip occurred due to under- '

frequency on the reactor coolant pump (RCP) buses. The underfrequency condition occurred because the RCP bus power sources had not been realigned to the startup transformers prior to trip-ping the main turbine. This event was caused by personnel error and procedural inadequacy. The individuals involved i

have been counseled. The appropriate procedures have been changed to prevent recurrence.

005 850623 F 24.1 A 3 85-012-00 AA CBL4 A reactor trip occurred due to an elec-trical short between two control rod drive system ca,bles which were routed

through the same containment electrical penetration. The cables have been re-paired and re-routed.

, i 2 3 4 F: Forced Reason: Method:

Exhibia G - Insisuctions S: Siheduled A-Equipment Failure (Emplain) 1 Manual for Prepasation of Data B. Maintenance of Test 2 Manual Scram. Entry Sheets for I.icensee C-Refucimg 3 Autouweic Scram. Event Repm (LER)FileINUREG-i D-Regulasiuy Resisicsion 4 Oslics (Emplaio) 0161)

E-Operator Tsaining a license Examination F Adninistrative 5 G Opesational Estos (Emplain) Exhibis ! Same Sousec (9/77) ll Othes (E xplain)

/~ .

JOSEPH M. FARLEY NUCI. EAR PLANT UNIT.2 NARRATIVE

SUMMARY

OF' OPERATIONS

' JUNE, 1985 There were no unit shutdowns or significant power reductions during the month of June.

The following major safety-related maintenance was performed in the month of June:

1. Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

t

m 4 ,

i OPERATING DATA REPORT )

i DOCKET NO. 50-364 DATE July J. 1985 J J. D. Woodard

! COMPLETED BY

' TELEPHONE 205-399-5156 OPERATING STATUS l

' seph M. Farley - Unit 2 Notes

l. Unit Name:. .
1) Cumulative data since l 2. Reporting Penod. 3- 1985 2652 7-30-81, date of commercial ,
3. t ** Thennal Power (MWt): operation.
4. Namepiste Rasmg (Gross MWe): 860 l
5. Demon Electncal Rating (Net MWe):

829

' 850.2

6. Maximma th, "': Capacity (Gross MWe):
7. Maximum I' , "': Capacity (Net MWe):

807.2 l q 8. If Changes Occur in Capacity Ratags (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Whach Restncted. lf Any (Net MWe):
10. Reasons For Restrictions. If Any: N/A i

~

This Month Yr.-to Date Cumulative i1. Hours In Reportag Period 720 4,343 34,368 7?n n 2,563.8 29,482.3 y' 12. Number Of Hours Reactor Was Critical

13. Reactor Reserve Shutdown Hours 0.0 nn 1u n

. 14. Hours Generator On-Line 720.0  ? s19 n 29.097.1 l 0.0 0.0 0.0 4 15. Unit Reserve Shutdown Hours

16. Gross Thermal Energy Generated (MWH) 1 R65 7?s 6,260,885 73,113,633
17. Gross Electncal Energy Generated (MWH) 618.858 2,078,366 24.024,648 589,612 1,952,084 ZZ,//1,006 i 18. Net Electncal Energy Generated (MWH)
19. Unit Service Factor 100.0 58.0 84,7 a 20. Unit Avadability Factor _,

100.0 58.0 84.7 i 21. Unit Capacity Factor (Using MDC Net) 101.5 ss.7 81.3

22. Unit Capacity Factor (Using DER Net) 98 8 54.2 79.9-j 23. Unic Forced Outage Rate 00 1.1 5.1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

l y N{A f 25. If Shut Down At End Of Report Period. Estimated Date of Startup:

I 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALJTY 05-06-81 05-08-81

$ INITIAL ELECTRICITY 05-24-81 05-25-81 COMMERCIAL OPERATION 08-01-81 07-30-81 (9/77)

. . . . _ . . . . . . . . . . . . _ . . . . . . . ~ . . . . . . . . . ._ _ . ..

~

DOCKET NO. 50-164

  • UNIT

' DATE July 3, 1985 J. D. Woodard COMPLETED BY )

(205) 899-5156 TM ** HONE f

June, 1985 ,

St0NTl!

DAY AVERACE DAILY FOWER LEVEL DAY AVERACE DAILY POWER LEVEL OlWe-Ner) (31We-Net) t, 811 17 817 809 3g 818

~

BT1 - -- 822

}~ .._..____..___...g9--

4 818 20 827 gi9 825

3 21 816 , 22 821 6

820 820 819 g

816 9

S14 -

3 819 817 10 815 __

3 818 817 gg 27 820 j

, gi9

[2 828 819 33 g o

07 822 14 30 827 3g IS 16 819

(?GUCTION5 J On this formst. list the aversge daily umt power levelin MWe Net for esch d:y in the reporting month. Compute to

, the neare:t whole me;swatt.

i (9f77)

O I

i 3

n o O .

O '

DOCKET NO. 50-164 .

UNIT SiluTDOWNS AND POWER RElHK'HONS UNIT NAME J.M. Farley - Unit 2 DATE July 3, 1985 REPORT MON fil June, 1985 COMPLETED NY J.D. Woodard TELEPilONE (205) 899-5156 v.

w E jg j*l, No. Danc g gg } }N'}

,sx Licensee Event Ev, g'il Cause & Cosreceive AI'"' '"

b o3 3$F Repust # MU oEU Pigvent l(ccutscuce a 2 -

u

, d THERE WERE NO UNIT SHUTDC WS OR Sl GNIFICANT P0i'ER R : DUCTIONS DURING THE MONTH OF JUNE.

4 i

i 1 3 4 F: Forced Reason: Method: Exhibis G Instructions S. Stliedided A-Eiguipinens Failure (Explain) 4. Manual for Psepasailun of D4:a 11 Maintenance of Test 2. Manual Scraan. Entry $licens for Licensee C Refuelung 3 Automatic Scrans. Event Repint (l ER) File INUREG-D Regulatiuy Resniction 4-Other (Explain) 0161) "

E-Operator Tsaining A license Examination F Administrative 5 G Openati. mal Lesus (Explain) Exhibis I Same Source (9/77) It Othes (Explain)