te JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1

' NARRATIVE

SUMMARY

OF OPERATIONS JUNE, 1985 i

During the month of June, there were two (2) automatic' shutdowns which occurred on 6-8-85 and 6-23-85.

The following major safety-related maintenance was performed in'the

. month of June:

1.

Miscellaneous corrective and preventive maintenance was 4

performed on the diesel' generators.

d 2.

Replacement of containment tendon field anchors is complete.

-3.

Two control rod drive system cables were repaired. An electrical short had occurred in the containment electrical penetration causing the reactor trip on 6-23-85.

k-(

3 8509110516 850715 i

PDR ADOCM 05000348 R

PDR a

+

4 w

1

.~.

71 l

OPERATING DATA REPORT 1

DOCKET NO. 50-348 i

DATE Julv 3 1985 t

COMPLETED BY

3. D. Woodard TELEPHONE (205) 899-5156 OPERATING STATUS Notes
1. Unit Name:

Joseph M. Far1ev - Unit 1 June, 1985

1) Cumulative data since j
2. Reportug Penod:

2652 12-1-77, date of commercial

3. t *W Thermal Power (MWt):

860 operation.

4. Namepiste Ratmg (Gross MWe):

829

5. Demen Electncal Rating (Net MWe):

860.9

6. Maximum Dependable Capacity (Gross MWe):

816.5

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A I

N/A

9. Power Level To Which Restncted.lf Any (Net MWe):

N/A

10. Reasons For Restrictions. If Any:

1 f O This Month Yr.-to.Date Cumulative 720 4,343 66,455

11. Hours la Reportag Period 4
12. Number Of Hours Reactor Was Critical 691.7 3,098.6 45,227.6
13. Reactor Reserve Shutdown Hours 0.0 o,o 3,650.0
14. Hours Generator On-Line 670,7 2,986.6 44,011.0
15. Unit Reserve Shutdown Hours nn 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1.655.189 7,533,878 111,434,453
17. Gross Electncal Energy Generated (MWH) 540.662 2,435,952 35,530,266
18. Net Electncal Energy Generated (MWH) 508,014 2,288,746 33,417,792 93.2 68.g 66.2
19. Unit Service Factor 93.2 1
20. Unit Availability Factor 68.8 66.2 86.4 64.5 63.0
21. Unit Capacity Factor (Using MDC Net) 85.I 6,_6 60.7
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 6.8 3.7 12.6

'4. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:

1 N/A

25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status iPrior to Commercial Operation):

Forecast Achieved 08-06-77 08-09-77 INITIAL CRITICALITY INITIAL ELECTRICITY 08-20-77 08-18-77 COMMERCIAL OPERATION 12-01-77 12-01-77

]

DOCKET NO.

50-348 1

UNIT DATE July 3, 1985 COMPLETED BY

.T.D. Woodard (205) 899-5156 TELEPHONr.

b June, 1985 310NTI!

4 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL QlWe-Net)

OlWe-Net) 017 546 g,

g7 821 2

629 13

~~

~

~~705 --

821 3


..__..__g9_.

4 4

  • A 813 825 3

21 f

816 823 6

,n 498 7

792 23 l

0 37.5 g

34 l

357 ~

473 9

3 10 810 26 818 Al?

27 4

812

[2 3

815 l

13 819 3

R??

822 14 30 812 15 3g 1

l 16 812 I

1 1

!?GUGONS On this form:t. list the aversge dssly unit power !cvet in MWe-Net for each d:y in the reporting month. Compute to j

, the neare:t whole me;swatt.

(9(77)

.i O 4

-._,.,n.

. -,,, _,. - - - - - ~,,,..,..,,,, _,. -, - -

l O

O O

UNIT SilUTDOWNS AND POWER REDtXmONS DOCKET NO.

50-348 UNIT NAME J. M. Fdrley - Unit 1 DATE Juiv 1.

1985 COMPLETED gay

.T. n. Woodard REPORT MONTil Tne-19R5 TELEPliONE (705) R99-5156 r,

b.

.$ E Ej Liccusee E v,

  • L Cause & Cossective 3gx Event u?

3 Acehm to No.

Date -

(

gg dEU u

o6 s2 jgg Repost #

Pstvent Hecunscuce 6

6 004 850600 F

25.2 G

3 85-010-00 AB BU A reactor' trip occurred due to under-frequency on the reactor coolant pump (RCP) buses. The underfrequency condition occurred because the RCP bus power sources had not been realigned to the startup transformers prior to trip-ping the main turbine.

This event was caused by personnel error and procedural inadequacy. The individuals involved i

have been counseled.

The appropriate procedures have been changed to prevent recurrence.

005 850623 F

24.1 A

3 85-012-00 AA CBL4 A reactor trip occurred due to an elec-trical short between two control rod drive system ca,bles which were routed through the same containment electrical penetration. The cables have been re-paired and re-routed.

i 2

3 4

F: Forced Reason:

Method:

Exhibia G - Insisuctions S: Siheduled A-Equipment Failure (Emplain) 1 Manual for Prepasation of Data B. Maintenance of Test 2 Manual Scram.

Entry Sheets for I.icensee C-Refucimg 3 Autouweic Scram.

Event Repm (LER)FileINUREG-i D-Regulasiuy Resisicsion 4 Oslics (Emplaio) 0161)

E-Operator Tsaining a license Examination F Adninistrative 5

G Opesational Estos (Emplain)

Exhibis ! Same Sousec (9/77) ll Othes (E xplain)

/~

JOSEPH M. FARLEY NUCI. EAR PLANT UNIT.2 NARRATIVE

SUMMARY

OF' OPERATIONS

' JUNE, 1985 There were no unit shutdowns or significant power reductions during the month of June.

The following major safety-related maintenance was performed in the month of June:

1.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

t

m 4

i OPERATING DATA REPORT

)

i DOCKET NO. 50-364 DATE July J.

1985 J

J.

D. Woodard COMPLETED BY TELEPHONE 205-399-5156 OPERATING STATUS l

seph M. Farley - Unit 2 Notes

l. Unit Name:.

l

2. Reporting Penod.

3-1985

1) Cumulative data since
3. t ** Thennal Power (MWt):

2652 7-30-81, date of commercial 860 operation.

4. Namepiste Rasmg (Gross MWe):

829

5. Demon Electncal Rating (Net MWe):

850.2

6. Maximma th,

"': Capacity (Gross MWe):

807.2 l

7. Maximum I', "': Capacity (Net MWe):

q

8. If Changes Occur in Capacity Ratags (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Whach Restncted. lf Any (Net MWe):
10. Reasons For Restrictions. If Any:

N/A i

This Month Yr.-to Date Cumulative

~

720 4,343 34,368 i1. Hours In Reportag Period y'

12. Number Of Hours Reactor Was Critical 7?n n 2,563.8 29,482.3 0.0
13. Reactor Reserve Shutdown Hours nn 1u n 720.0
14. Hours Generator On-Line

? s19 n 29.097.1 0.0

15. Unit Reserve Shutdown Hours 0.0 0.0 4
16. Gross Thermal Energy Generated (MWH) 1 R65 7?s 6,260,885 73,113,633
17. Gross Electncal Energy Generated (MWH) 618.858 2,078,366 24.024,648 i
18. Net Electncal Energy Generated (MWH) 589,612 1,952,084 ZZ,//1,006
19. Unit Service Factor 100.0 58.0 84,7
20. Unit Avadability Factor 100.0 58.0 84.7 a

101.5 ss.7 81.3 i

21. Unit Capacity Factor (Using MDC Net) 98 8 54.2 79.9-
22. Unit Capacity Factor (Using DER Net) j
23. Unic Forced Outage Rate 00 1.1 5.1 l
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

y N{A f

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

I

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALJTY 05-06-81 05-08-81 05-24-81 05-25-81 INITIAL ELECTRICITY 08-01-81 07-30-81 COMMERCIAL OPERATION (9/77)

.. ~....

~

DOCKET NO.

50-164 UNIT DATE July 3, 1985 J. D. Woodard COMPLETED BY

)

(205) 899-5156 TM ** HONE f

June, 1985 St0NTl!

DAY AVERACE DAILY FOWER LEVEL DAY AVERACE DAILY POWER LEVEL OlWe-Ner)

(31We-Net) 811 17 817 t,

809 818 3g

}~

~

BT1 - --

.._..____..___...g9--

822 4

818 20 827 825 3

gi9 21 816 821 6

, 22 820 820 819 816 g

S14 9

3 819 817 10 815 3

818 817 gg 27 820

[2 j

gi9 819 33 828 g

o 07 822 14 30 827 IS 3g 16 819

(?GUCTION5 J

On this formst. list the aversge daily umt power levelin MWe Net for esch d:y in the reporting month. Compute to

, the neare:t whole me;swatt.

i (9f77)

! O I

i 3

n o

O O

UNIT SiluTDOWNS AND POWER RElHK'HONS DOCKET NO.

50-164 UNIT NAME J.M. Farley - Unit 2 DATE July 3, 1985 REPORT MON fil June, 1985 COMPLETED NY J.D. Woodard TELEPilONE (205) 899-5156 v.

E Licensee Ev, j*l, w

jg

}

}N'}

Cause & Cosreceive No.

Danc g

gg

,sx Event g'il AI'"' '"

MU EU b

o3 3$F Repust #

uo Pigvent l(ccutscuce a

2d THERE WERE NO UNIT SHUTDC WS OR Sl GNIFICANT P0i'ER R : DUCTIONS DURING THE MONTH OF JUNE.

4 i

i 1

3 4

F: Forced Reason:

Method:

Exhibis G Instructions S. Stliedided A-Eiguipinens Failure (Explain)

4. Manual for Psepasailun of D4:a 11 Maintenance of Test
2. Manual Scraan.

Entry $licens for Licensee C Refuelung 3 Automatic Scrans.

Event Repint (l ER) File INUREG-D Regulatiuy Resniction 4-Other (Explain) 0161)

E-Operator Tsaining A license Examination F Administrative 5

G Openati. mal Lesus (Explain)

Exhibis I Same Source (9/77)