MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M9991999-10-22022 October 1999 Forwards Response to NRC 990930 RAI Re Void Swelling Degradation Mechanism,Per License Renewal Application for Ccnpp,Units 1 & 2 ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20216J8671999-10-0101 October 1999 Forwards Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant. Rev Accurately Presents Changes Made Since Previous Submittal,Necessary to Reflect Info & Analyses Submitted to NRC or Prepared,Per to NRC Requirements ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20216H7831999-09-28028 September 1999 Forwards Addl Info Re NRC SER for Ccnpp,Units 1 & 2,per License Renewal Application ML20212D5361999-09-20020 September 1999 Forwards Rev 1 to Calculation CA04048, Fuel Handling Accident During Reconstitution, as Agreed During 990909 Telcon ML20212C1861999-09-15015 September 1999 Requests That NRC Complete Review of TR CED-387-P,Rev 00-P, Abb Critical Heat Flux Correlations for PWR Fuel, by 000201.Util Expects to Use ABB-NV Correlation for Current non-mixing Vane Fuel in Reload Analyses in 2000 for Ccnpp ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211H9841999-08-31031 August 1999 Provides Comments Re Data Entered in Rvid for Ccnpp,Units 1 2,per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20211J1611999-08-17017 August 1999 Documents Bg&E Consultations with MD Dept of Natural Resources Re Potential Impacts to Chesapeake Bay Critical Area & Forest Interior Dwelling Bird Habitat,Per Ccnpp License Renewal.Telcons Ref Satisfy Consulting Requirement ML20210V1181999-08-17017 August 1999 Forwards Toxic Gases Calculations for Control Room Habitability,As Discussed During 990713 Telcon.Util Will Make Final Submittal for Toxic Gases After NRC Has Completed Review of ARCON96 ML20210T5061999-08-16016 August 1999 Forwards Rev 0 to Ccnpp COLR for Unit 2,Cycle 13, Per Plant TS 5.6.5 ML20210U2761999-08-13013 August 1999 Forwards Listed Info Re Guarantee of Payment of Deferred Premiums for Ccnpp,Units 1 & 2,IAW 10CFR140.21 Requirements ML20210S8131999-08-12012 August 1999 Forwards Summary of Various Open Licensing Actions for Bg&E That Were Completed During Unit 2 Refueling Outage Ending 990506 ML20210S8101999-08-12012 August 1999 Forwards Application Requesting Renewal of License for Mv Seckens,License SOP-10369-2.Without Encl ML20210S7901999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data for Period of 990101-990630,IAW 10CFR36.71(d) ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N5881999-08-0606 August 1999 Forwards ISI Rept for Ccnpp,Unit 2,fulfilling Intentions & Requirements Stated in Program Plan & Commitment to Comply with ASME Code Section XI ISI Requirements ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20210N5491999-08-0505 August 1999 Requests That License SOP-10371-2,for RW Scott,Be Renewed IAW 10CFR55.57.Individual Has Satisfactorily Discharged License Responsibilities Competently & Safely.Without Application ML20210N5471999-08-0505 August 1999 Requests That License SOP-10031-3,for DF Theders,Be Removed from Active Files for Ccnpp,Due to Individual Being Reassigned to Position No Longer Requiring License ML20210N9291999-08-0404 August 1999 Forwards Clarification to Initial Response to Biennial Rept on Status of Decommissioning Funding,As Required by 10CFR50.75(f)(1) ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210E4941999-07-23023 July 1999 Informs That 1999 Emergency Response Plan Exercise Objectives Is Scheduled for Wk of 991025.Exercise Scenario Will Test Integrated Capability & Major Portion of Elements Existing within Emergency Response Plan ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210C5011999-07-21021 July 1999 Informs That SL Walters,License OP-10096-3 & CC Zapp,License Number SOP-2188-9,have Been Reassigned within Organization & No Longer Require NRC License,Per 10CFR50.74(a).Removal of Subject Licenses from Active Files for Ccnpp,Requested ML20210C2681999-07-20020 July 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsement,Per 10CFR140.15(e) ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20211N9101999-07-20020 July 1999 Forwards Correspondence Author Received from New 7th Democratic Club Civic,Inc Raising Some Serious Concerns About Renewal of Nuclear Reactor Licenses for Calvert Cliffs Power Plant ML20210C8461999-07-19019 July 1999 Informs That CF Farrow,License OP-10648-1,will No Longer Be Employed with Bg&E,As of 990709,per 10CFR50.74(a).Removal of Subject License from Active Files for Ccnpp,Requested ML20209J5171999-07-16016 July 1999 Forwards Comments from Accuracy Review of License Renewal Application SER ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20209C1391999-07-0202 July 1999 Forwards Responses to Open & Confirmatory Items Based on Review of SER for Bg&E Application for Renewal of Operating Licenses for Calvert Cliffs.Bg&E Intends to Forward Comments Based on Accuracy Verification in Near Future ML20210D1531999-06-30030 June 1999 Informs of Receipt of from New 7th Democratic Civic Club,Inc Expressing Support for License Renewal. Requests Consideration in Addressing Concerns & Recommendations ML20209B5781999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20210D1741999-06-24024 June 1999 Expresses Opinions on Renewal of Nuclear Reactor Licenses Re Plant & Support Renewal Application of Bg&E.Requests That NRC Revise Procedures to Allow Sufficient Time for Public to Review,Evaluate & Respond to Info ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196C4291999-06-21021 June 1999 Forwards Rev to ERDS Data Point Library for Ccnpp,Unit 2,per 10CFR50,App E,Section VI.3.a.Table Provides Brief Summary of Changes ML20195J8271999-06-16016 June 1999 Ack Receipt of to Jackson,Chairman of NRC Re Environ Impacts of Increased Patuxtent River Complex Flight Operations on Ccnpp.Clarification & Correction of Listed Statement Found on Page Two,Provided 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196E0371999-06-16016 June 1999 Forwards Insp Repts 50-317/99-03 & 50-318/99-03 on 990321-0508.Apparent Violation Being Considered for Escalated Enforcement Action ML20207G4331999-06-0707 June 1999 Informs That in Response Request by Nrc,Fema Evaluated Adequacy of Evacuation Plans & Training of Local First Responders for Area Around Ccnpp.Copy of FEMA & Encl to Ltr,Which Provides FEMA Recommendations Encl ML20207G4701999-06-0707 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Organization Chart Encl ML20207B2491999-05-21021 May 1999 Forwards Insp Repts 50-317/99-04 & 50-318/99-04 on 990405-16.No Violations Noted.Insp Revealed Few Potential & Plausible Aging Effects NRC Team Determined Should Be Included in License Renewal Application ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206A6171999-04-22022 April 1999 Responds to Request for Statistics on Allegation Re Plant by J Osborne.Encl Tables Provides Breakdown of Allegations by Source Category for Allegations Receive in CY95-98 & First Six Month of 1999 ML20205R0961999-04-15015 April 1999 Forwards Insp Repts 50-317/99-01 & 50-318/99-01 on 990131- 0320.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205P1381999-04-0909 April 1999 Discusses 990223 Ppr.Forwards Plant Issues Matrix & Insp Plan.Since Spring 1998 Unit 1 Operated at Essentially Full Power.Unit 2 Had Similar Power History Except for Jul 1998 Manual Reactor Trip Due to Small Bore Pipe Steam Leak ML20205P1281999-04-0808 April 1999 Forwards Monthly Status Rept on Licensing Activities & Regulatory Duties of NRC for Mar 1999.Targets for Licensing Action Age & Completion Rates & License Renewal Process for Calvert Cliffs Remains on Schedule ML20205E5511999-03-26026 March 1999 Forwards Insp Repts 50-317/99-02 & 50-318/99-02 on 990208-12.No Violations Noted.Insp Was First of Three Planned Visits to Verify Ccnpp License Renewal in Compliance with Requirements of Rule for License Renewal ML20205G8841999-03-24024 March 1999 Discusses Bg&E Application Filed on 980408 for Renewal of Operating Licenses DPR-53 & DPR-68 for Calvert Cliffs Units, 1 & 2.For Listed Reasons,Partial Exemption from 10CFR170 Fees Granted IAW 10CFR170.11(b)(1) ML20205B0291999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of License Renewal Application for Plants,Units 1 & 2,dtd 980408,that Staff Determines Has Generic Value to Industry ML20204H6281999-03-21021 March 1999 Forwards SER Reflecting Status of Staff Review of Util License Renewal for Calvert Cliffs Nuclear Power Plants, Units 1 & 2 ML20207E9641999-03-0404 March 1999 Forwards Insp Repts 50-317/98-12 & 50-318/98-12 on 981213- 990130 & Notice of Violation Re Failure of Maint Workers to Tighten Bolting for Svc Water Heat Exchanger ML20207G8631999-02-25025 February 1999 Forwards Operator Initial Exam Repts 50-317/99-301OL & 50-318/99-301OL on 990122 & 25-29 (Administration) & 990201- 05 (Grading).All Applicants Passed All Portions of Exams ML20203D3981999-02-0505 February 1999 Forwards Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20203A6141999-02-0303 February 1999 Submits Details on Listed Areas Re Inspection Plan of Insp Scheduled for 990203 ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML20199G4121999-01-20020 January 1999 Forwards SE Accepting Util USI A-46 Implementation Program for Plant ML20199L6621999-01-19019 January 1999 Informs That Licensee Authorized to Administer Initial Written Exam to Listed Applicants on 990122.NRC Region I Operator Licensing Staff Will Administer Operating Test to Applicants ML20199K8481999-01-19019 January 1999 Forwards Insp Repts 50-317/98-11 & 50-318/98-11 on 981025-1212.No Violations Noted ML20199F4101999-01-0808 January 1999 Forwards SE Accepting Util 960213,0725 & 981202 Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety- Related Power-Operated Gate Valves ML20198S7491999-01-0707 January 1999 Forwards SER Accepting Licensee ,Suppl by 980424 & 1124 Ltrs Proposing Changes to Rev 49 of Calvert Cliffs Nuclear Power Plant Quality Assurance Program Description in Accordance with 10CFR50.54(a)(3) ML20198S4291999-01-0707 January 1999 Requests Addl Info Re License Renewal Application as Application Relates to Staff Position on Environ Qualification ML20196K2991999-01-0404 January 1999 Forwards Notice of Consideration of Approval of Transfer of Facility Operating License & Matl License & Opportunity for Hearing in Response to Application ML20202D0271998-12-15015 December 1998 Forwards Notice of Withdrawal of Application for Amend to License DPR-69.Proposed Change Would Have Modified Svc Water Head Tanks.Without Encl ML20198L3431998-12-12012 December 1998 Forwards Insp Repts 50-317/98-10 & 50-318/98-10 on 980706-10 & 1118.Insp Rept Documents App R Issues Which Constituted Violations of NRC Requirements.Nov Not Issued Because, Violations Identified by Licensee Staff as Part of C/A ML20198B1791998-12-10010 December 1998 Advises of Planned Insp Effort Resulting from Calvert Cliffs NPP Review Conducted on 981110.Details of Insp Rept for Next 6 Months & Historical Listing of Plant Issues Considered During Process Encl 1999-09-08
[Table view] |
Text
._ ._.
b.
l
.[
i February 27, 1997 l
[
Mr. Charles H. Cruse Vice President - Nuclear Energy Baltimore Gas and Electric Company i Calvert Cliffs Nuclear Power Plant ;
1650 Calvert Cliffs Parkway !
Lusby, MD 20657 -4702 ,
Dear Mr. Cruse:
On February 6,1997, we met with your staff to discuss the results of your recently completed Calvert Cliffs Appendix R self-assessment. You had committed to perform the assessment as part of your corrective action for an Appendix R Violation earlier last year.
The slides you presented during the meeting are attached.
Based on what we heard, we believe that you performed a successful assessment as evidenced by the number and extent of your findings. While we applaud you for your effort, the more critical work remains. That is, completing the required corrective actions to bring your plant into full compliance with Appendix R. Until then, we note that you gave us assurance at the meeting that the combined effect of all deficiencies would not prevent you from safely achieving safe shutdown in the event of a fire. This statment I made by you considered the compensatory measures that you have in place until you j complete the ne::essary modifications. We intend to inspect your corrective actions. I Thank you for your cooperation. If you have any questions or clarifications, please call me at (610) 337-5376.
Sincerely,
/
h}
r William H. Ruland, Chief l
i Electrical Engineering Branch Division of Reactor Safety ;
l Docket Nos. 50-317,50-318 l
l l
Enclosures:
! 1. Slides from presentation , j
- 2. Attendees at meeting yj ;
l nannoo 9703040215 DR 970227 ADOCK 0500 7 SE%%%%,E,ll
r t
f Mr. Charles M. Cruse 2 f cc w/encis:
T. Camilleri, Director, Nuclear Regulatory Matters (CCNPP)
R. McLean, Administrator, Nuclear Evaluations J. Walter, Engineering Division, Public Service Commission of Maryland K. Burger, Esquire, Maryland People's Counsel R. Ochs, Maryland Safe Energy Coalition l State of Maryland (2)
Distribution w/encis:
D. Screnci, PAO .
Nuclear Safety Information Center (NSIC) {
P'UBLIC i NRC Resident inspector Region 1 Docket Room (with concurrences)
R. Correia, NRR !
D. R. Taylor, NRR W. Dean, OEDO (WMD)
S. Stewart - Calvert Cliffs ,
S. Bajwa, NRR l A. Dromerick, NRR !
G. Vissing, NRR !
M. Campion, RI ;
inspection Program Branch, NRR (IPAS)
W. Ruland, DRS ,
DRS File l
I l
DOCUMENT NAME: A:\CC. REC Ta ,ece% e copy of this document. Indicate in the bos: "C" = Copy without ettech,nent/ enclosure "E" = Copy with attachment / enclosure 'N" = No copy 0FFICE RI/DRS ,
16 RI/DRP n / l l l NAME WRULAND /Aj&X LDOERFLEINN7V DATE 02/18/97/A 02/a l/97 ' 02/ /97 02/ /97 02/ /97 0FFICIAL RECORD COPY l
1 l
.,a2, m A d_ es-4.-.m.._ue. -~A2a_A-....> .
W*dJ-- d. - A 4A24A8ph 4-M44-h*m446-~*d---ad hw-" ---** -ra* - +A 3h"e 6'F*A8-- *rd'--^ - - - '-'-*M" "dA--N"4' e
0 F,
I H l @ 4 i 4 i
, H 4%%
-d
- c. &
j u (V, w O ~
-8 $
, - Y D
~
1 h ,
L
, ! ![ >
H
+ @x j
<"d g
j <y r ,
Ws I
-~
W I
e f * # 9 *
! l. INTRODUCTIONS
. II. BACKGROUND Ill. SELF-ASSESSMENT PROCESS IV. SELF-ASSESSMENT RESULTS V. ACTION PLAN i
! VI. QUESTIONS 2
i i
IXTRODECTIONS
_ s., _ & m r 7 i
._ m m
, 7 z.m m e _zm, 4
o C.H. CRUSE -
VP, NUCLEAR ENERGY e P. G. CHABOT -
MANAGER, NUCLEAR ENGINEERING e T.J.CAMILLERI -
DIRECTOR, NUCLEAR REGULATORY MATTERS e G. L. DETTER - .
GENERAL SUPERVISOR, DESIGN ENGINEERING o R. B. SYDNOR - PRINCIPAL ENGINEER APPENDIX R/HVAC PROJECT MANAGER e C. R. SINOPOLI - SENIOR ENGINEER FIRE PROTECTION PROGRAM MANAGER J
t
. .l t <
BACKGROEND ;
. ... 8E.a654.5 erfw EmintNaW: E- '~' 'h 1$ O A 7+,'ATC's C 'E". M 5,' 0,8 e June 96 Pre-enforcement Conference ,
(Switchgear HVAC) .
- e Appendix R overview evaluation L (completed June 14,1996}
e Committed to a full Appendix R i Self-Assessment in October 1996 l
t b
i I
4
SELF-ASSESSMEXT ;
PROCESS :
' ~ ~ " ^ '~
....;=-;.,...._
o Conducted from 1C/10/96 to 11/1/96 i
o Team Leader - CCNPP QA Supervisor Senior CCNPP QA Engineer r
e Team Members - ,
- 1. Senior CCNPP QA Engineer
- 2. Five Senior Consultants from Engineering Planning & Management, Inc. With extensive experience in Nuclear Power, Appendix R, Fire Protection, and Self-assessment.
5 4
)
n .
ASSESSMEXT TEAM ?
L EXPERIEXCE u m _ m__ -_ l
- Robert Kalantari - Senior Consultant ,
J Licensing / Systems. Over 16 years Nuclear Power
- Engineering, Fire Protection Engineer. Worked on App R at 7 different Nuclear Plants.
! Paul Ouellette - Mechanical Systems / App R Licensing.
15 years Nuclear Power Engineering, QA Auditor.
Extensive App R and self-assessment expenence.
Albert Melikian - Electrical Systems / App R.
15 years App R technical expertise in the area of Electrical Engineering compliance with APP R and self-assessment experience.
- 6
e e' f
ASSESSMEXT TEAM EXPERIEXCE
- .. ... .s a.a.eu.q: _
7 ,um.2wm ;
Frank McGinnis - Technical Consultant, Fire Protection.
Over 12 years experience fire protection engineering, 8 in nuclear. QA Auditor. Experience in fire protection audits at several different plants.
Mark Crompton - Technical Consultant, Fire Protection.
Masters Degree in Fire Protection. Experience in fire protection programs at four nuclear plants.
7
SELF-ASSESSMENT PROCESS
_ _ _ _ ~_
e SCOPE - Overall CCNPP Appendix R program compliance with: l 10CFRSC,50.48, Appendix R sections Ill.G - Fire Protection of Safe Shutdown Capability Ill.J - Emergency Lighting Ill.L - Alternative Shutdown Capability lll.O - RCP Oil Collection (excluded) e Method - IAW NRC InSp. Proc. 40501 &
64100 8
SELF-ASSESSMEXT t
- CHECKLIST (IP 64100)
. mm m, ~ w m c __ . ~
- 1. SAFE SHUTDOWN ANALYSIS & REGULATORY CONFORMANCE
- 1. Exemptions or Deviations ;
- 2. Compliance with Generic Letters and I &E Notices
- 3. Evaluations, Analyses, and Compliance Strategies
- 4. Functions and Performance Goals
- 5. Systems, Equipment, Cables, and instrument Sense Line Analysis
- 6. Electrical Distribution Systems Evaluations and Use of Offsite Power
- 7. Plant System Automatic Functions
- 8. Associated Circuits, Spurious Operations
- 9. High/ Low Pressure Boundary Analysis
- 10. Alternative / Dedicated Shutdown
- 11. Licensing
- 12. Fire Protection, Fire Suppression Effects and Fire Area Separations i
- 13. Habitability and Equipment Operability Environment 9 ,
i i
SELF-ASSESSMEXT CHECKLIST (IP .. .a.- --
_; ~
64100) .a . .. .. . .
- 11. QUALITY ASSURANCE AND CORRECTIVE ACTIONS
- 1. QA Program
- 2. Databases 111. DESIGN REVIEW AND CONFIGURATION MANAGEMENT
. 1. Calculations and Documentation l
- 2. Long Term Conformance Maintenance and Procedures
- 3. Raceway Routing Information
- 4. Raceway Fire Barrier Wrap Use IV. Operations and Maintenance
- 1. Repairs, Operating Procedures, Manual Actions, Maintenance V. SURVEILLANCE AND TESTING
- 1. Tech Specs, Surveillance Requirements ;
- 2. Emergency Lighting, Communications, Fire Protections Features 10 i
i SELF-ASSESSMEXT FOCUS o Specific areas of review were based on:
Recurring industry issues Relative safety significance ,
Previous NRC Inspection and Audit Findings in the industry Comparison to current practices at Other Utilities k
6 11
i SELF-ASSESSMEXT RESCLTS .
=_ . -- -
i e Our Basic Appendix R Program is sound n Fire Detection and Suppression i n App R Interactive Cable Analysis Operations Safe Shutdown Procedures Surveillance Procedures Design Process and documentation e Awareness of industry experience was Good e Identified Concerns warrant increased attention 12
-- -- _- _ --- -- __ m
i 1 .
.-:-W ; . $, f.' nil (
, '^[ . $, 's, [ ,1 *2 [.h'
- w; -%g','. on
. e.f ,.'.S, ! y: m . < 4
. y:w _ : p.
n+ t.:
^.<- ;: yg;,'f:M.i~:,
- , v,.:-- p;, ,g~an-M -: a , <. .yp ;u, .- . _ % ^;
.~ 7. ...y9.
, ._ =y u, ;C. .L +~' ; $
4 ,._ ;p - - . , . , v:r , , < -
+
sl 9%Intsrsd.x.~
. mm ti#,m'_s
.. ' sTfiia,xsis'b~
?
' +
- x. : :R f~ ,:w m
.. r nf.2:, ;yW ,
=, WE. , M-
, , +4 . h.e y
+
i
v ,
i f
l i
t 1 ;
xA unnw w.wwwlter.natem..
. Meryp . .w 5- . .c '
a ,. . a .yam -C n w_( w. 1r.em p-ww$n ww~ : f ud e -s: %1 N W c ._ -
!D0tenti6ri/Siip,p;*Qms S 6wnFr = = iessioit W:w+afe]Shhidv:n n
c.
e -
,.w u .. ~ . = c ay + ~
c m -
w-s n ~:~
O. W-:W -?ystemSWNa Mv. w;roce i , ureSW,
- - m .
- w, s
- m- w;-- mxe y S i l . -
1 i i i
..v.3 v.u;w:m . , . n:. 7 NL ; n,W..
..vn ,, ". >y .L;.
- 4..%ena c;:.
a s '< e :: 39m +.w
. .,.g,u
- , u ;:1:;r
& Wk. - -.w. % . ,
w@ M N.
urVel anCOM;ER l i
t wa
.mx; cv :. enx.u;x -.ma e x.>n u,,;m
. . . . w :n .
n +. ~g~, pw- _g.+s ( ; , #8 a, ._,c.. , , -. .
,,s. , '
g, [ .
m4 y ,,y .j 3 E
t I
4 4 I
SELF-ASSESSMEXT RESLLTS
-7 _ 3, g .. - .
e 19 Concerns identified 7 Group I concerns - recommended corrective action be taken/ upgraded 12 Group ll concerns - corrective action in progress e 14 recommendations for improvement (Group lil) e All concerns will be addressed through our corrective action process e We have completed action on 11 items 13
SELF-ASSESSMENT L KEY COXCERXS
/
o Ventilation Systems-analysis and mods e Motor operated Valves 'IN92-18}
e Dual fusing of alternate S/D circuits
/IN85-09',>
t e Electrical Analysis l > external hot shorts
> spurious operations o EDG circuits /1997 RFO'l < >
14
SELF-ASSESSMEXT KEY COXCERXS
- g;_ _ _=g- .
e Emergency lighting e Various fire protection analyses Raceway enclosure qualification Large fire area analysis
. o Instrument Air system fire effects o Self-induced Station Blackout i e Reportability of Appendix R issues
! e Manual actions requiring tools ,
15 i
i
~
i L
ACTIOX PLAX
...e%..-..+. . . ..w :As wrr ~: v _ ._ mum.m.s
..m ;... . . ..
- e Created the Appendix R/HVAC Project Team l and assigned a full-time Project Manager .
o Appendix R ownership consolidated in i Engineering e Complete Analysis - 1997 (90% confidence) ;
e Complete currently identified Plant Mods -
non-outage 1997-98, outage related 1998 and 1999 RFO's i e Appendix R Training - Complete i
16 I i
i
i
- APPEXDIX. R PROJECT
- 2n__.______=_==____________ ,
o Overall Project Manager- Russ Sydnor o Project Team -
- . Five Electrical Engineers Two HVAC Engineers Two Fire Protection Engineers Operations Liaison Modification Project Managers i
i 17 ,
. .l e ;
APPEXDIX R PROJECT GOALS '
mc.m.-...aamma- : - -
~mm ,m ca_m ~:-
i e Resolve Current Concerns Complete analysis identify modifications early Modifications approved and scheduled Communicate status to Management and the NRC i
i l
i 18 i
- APPENDIX R PROJECT GOALS
- . , _ , ;_;;;g ;, -~ - -
o Establish Framework for Continued Compliance ,
Process improvements Ownership Training Self-assessment / Management oversight 19
i 1
MAXAGEMENT ISSUES
. ~ - _-- - _m & mr- ..-..,__m- .- . .
e Appendix R level of knowledge
> Initial training complete 4
o Challenge and validate assumptions Determine the issue vice being defensive
> Addressed by Engineering Department
! Manager and General Supervisors e Consolidate Management responsibility for Fire Protection Programs and Appendix R
> Done e Enforce Action item commitments
> Improved, continuing ,
SUMMARY
,mn_a==w,m= ;;e=c=w n _
e Self-assessment thorough and credible o Findings o Corrective actions and compensatory actions e Safety is first priority e Responsibility 21
t ISSUE ACTION ACTION IN COMP.
COMPLETE PROGRESS _ MEASURES Ext. Hot Shorts E No Emerg 1.ights E Yes EDG Circuit E Yes Reportability E SelfInduced SBO
_ Manual Actions, Tools
- Dual Fusing, IN 85-09 E Yes MOV, IN 92-18 E Yes Spurious Operations E No Large Fire Areas # No Instrument Air
- No Functionality Air Bottle, CV-517
- Yes Manual Action Feasibility
- Process Monitoring A Fire Barrier Evals A App. R QA A FHA A Fire Damper Operability A Communications A ICA Format A Report on Alt. S/D A Comp. Equip. List A Electrical Dist. Systems Breaker / Fuse Coord. A C. T. Analysis A High/ Low Pressure A Long Term Compl. Proc. A a Potential Noncompliances: Potential plant / documentation deviations from Fire Protection regulations / license basis.
e General Concern: Plant condition appears to deviate from guidance documentation or documentation is not available to support compliance.
A General Observation: Conditions that appear to be inconsistent with other compliant nuclear stations or areas for improvement.
I
ENCLOSURE 2 ATTENDEES AT MEETING Licensee Peter Chabot, Engineering Manager ;
Terry Camilleri, Director, Nuclear Regulatory Matters Clifford Sinopoli, System Engineer, Fire Protection Russell Sydnor, Principle Engineer, Fire Protection Gary Detter, General Supervisor, Design Engineering N.R.C James Stewart, SRI, Calvert Cliffs .
Larry Doerflein, Projects Branch No.1, DRP 1 William Ruland, Chief, Electrical Engineering Branch, DRS A. Randolph Blough, Deputy Director, DRS Alex Dromerick, NRR Steven Adams, Reactor Engineering, DRP Thomas Mostack, Project Engineer, DRP 1
l
__. .__ _- -_ >