? CONTRACT lNO#NRCs02i95s003t " '
l Name of the Contractor: SCIENCE APPLICATIONS ItiTERNATIONAL CORPORATION Street Addren-11252 ROGER BACON DRIVE
~RESTON, VIRGINIA 22090
Contact:
Niza Hoft. Contract Representative Phone No.-
(703) 318-4753 Fax No.1
_... _ _. (703) 709-_1042.
)
DATE TASK ORDER RFP ISSUED:
1/27/97 EFFECTIVE DATE OF TASK ORDER:2/20/97 PROPOSAL DUE DATE: 2/3/97 REQUISITION NO.: NMS-02-95-003-027 ESTIMATED LEVEL OF EFFORT:5 STAFF WEEKS PERIOD OF PERFORMANCE: 2/20/97-EST. REIMBURSABLF COST:$ 20,403.00 9/1/97 FIXED FEE:
1,632.00 TOTAL EST. COST:$ 22.035.00 ACCOUNTING AND APPROPRIATION DATA:
N/A (FUNDED UNDER BASIC KT)
(65015221000 J5073 31X0200 BOC 252A FFS 5096R004/R082)
TASK ORDER SPECIFICATIONS:
(TASK AREA NO. 4 0F BASIC CONTRACT)
INSPECTION SITE: Ft. St. Vrain, Colorado DATE OF INSPECTION: April, 1997 (2 week insoection)
TECHNICAL DISCIPLINES REQUIRED: senior is/,el engineer with spent fuel background OTHER INFORMATION/SPECIAL ISSUES:
-review DOE application DOE FSV SAR, DOE Transition plan t
-determine acceptablility of application SAR, DOE TS, decommissioning plan
-inspection planning, participation and n it input to SAR
-input to inspection report DELIVERABLES AND DUE DATES: WRITTEN REPORTS ON THE INSPECTION FINDINGS SH/1L BE PROVIDED TO THE NRC TECHNICAL MONITOR WITHIN ONE WEEK OF THE INSPECTION. OR ON THE SCHEDULE AS DETERMINED BY THE NRC TECHNICAL MONITOR.