Informs That Info Being Provided to Plant Security Manager That Could Assist in Efforts to Protect Plant Against Insider Requirement of design-basis Threat
ML20135C430
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/20/1997
From: Wharton L
NRC (Affiliation Not Assigned)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 9703040041
Download: ML20135C430 (2)


Text

_ _.

F February 20, 1997 Mr. S. K. Gambhir 7(,

Division Manager, Production Engineering Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort.Calhoun, Nebraska 68023-0399

SUBJECT:

PROTECTED AREA ACCESS CONTROL AT NUCLEAR REACTOR SITES-

Dear Mr. Gambhir:

The Nuclear Regulatory Commission (NRC) is notifying all nuclear power reactor licensees of a potential problem involving the protected area access control system that may exist at your site.

As a result of an unauthorized entry at one of the operating reactor sites, the NRC has determined that this situation may be a generic pwblc.n that should be analyzed by all licensees to verify that regulatory requirements are being met.

This letter is to inform you that information is being provided to your plant security manager that could assist in your efforts to protect your plant against the " insider" requirement of the design-basis threat.

This information includes a Safeguards Information enclosure that is being sent only to your site security manager.

The enclosure is being withheld from public disclosure due to the sensitive information that it contains.

It is suggested that the information in the safeguards enclosure be reviewed for applicability to your plant and actions be considered, as appropriate.

Should you have any questions, please contact Barry Manili in the Safeguards Branch, Office of Nuclear Reactor Regulation at (301) 415-2912.

Sincerely, Original Signed By L. Raynard Wharton, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-285 DISTRIBUTION:(w/o enclosure) iDockets ACRS cc:

See next page PUBLIC OGC PDIV-2 Reading JWilliams JRoe l

EGAl y ',

WBateman i

RWharton EPeyton

{.

1 c.

p BManili WJohnson, Region IV 0FC PDIV-2 PDIV-2 NAME RWharton EMN DATE 2/ /97 2/19 /97 j

0FFICIAL RECORD COPY thf 9703040041 970220

'd PDR ADOCK 05000285 F

PDR a

I h

Mr. S. K. Gambhir February 20, 1997 cc w/o enclosure:

Winston & Strawn ATTN: Perry D. Robinson, Esq.

1400 L Street, N.W.

Washington, DC.20005-3502 Mr. Jack Jensin, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Wayne Walker, Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 309 Fort Calhoun, Nebraska 68023 Regional Administrator, Region IV i

U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 i

Ms. Cheryl Rodgers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South i

P.O. Box 95007 Lincoln, Nebraska 68509-5007 Mr. James W. Chase, Manager Fort Calhoun Station Post Office Box 399 fort Calhoun, Nebraska 68023 Mr. James W. Tills Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 cc w/ enclosure:

Mr. H. John Sefick Manager Security Services Omaha Public Power District l

Fort Calhoun Station l

Post Office Box 399 Fort Calhoun, Nebraska 68023 l