ML20135C337

From kanterella
Jump to navigation Jump to search
Corrected Pages to Monthly Operating Repts for May 1985
ML20135C337
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/31/1985
From: Jones V
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20135C325 List:
References
NUDOCS 8509110399
Download: ML20135C337 (2)


Text

Cerrecttd Copy ~

. Corrected copy 1

1 OPERATING DATA REPORT DOCKET NO. 50-280 DATE 06-10-85 CMLETED. BY V. Jones TELEPHONE 357-3184 OPERATING STATUS

1. Unit Name: Surry Unit 1 Notes
2. Reporting Period: 05-01-85 to 05-31-85
3. Licensed Thermal Power (MWt): 2441
4. Nameplate Rating (Gross MWe): 847.5
5. Design Electrical Rating (Net MWe): 788
6. Maximum Dependable capacity (Gross MWe): 820
7. Maximus Dependable Capacity (Net MWe): 7a1
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons.: N/A
9. Pow r Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cummulative

11. Hours In Reporting Period 744.0 3623.0 109055.0
12. Number of Hours Reactor Was Critical 412.9 3207.8 67584.5
13. Reactor Reserve Shutdown Hours 0 0 3774.o
14. Hours Generator On-Line 396.9 3167.3 66176.4
15. Unit Reserve Shutdown Hours 0 0 3736.2
16. Gross Thermal Energy Generated (MWH) 928849.5 7228220.1 153242397.2
17. Gross Electrical Energy Generated (MWH) 310025.0 2420390.0 49272353.0
18. Net Electrical Energy

, Generated (MWB) 294661.0 2301302.0 46713146.0

19. Unit Service Factor 53.4 % 87.4 % 60.7 %
20. Unic Available Factor 53.4 % 87.4 % 64.1 %
21. Unit Capacity Factor (Using MDC Net) 50.7 % 81.3 % 57.5 %
22. Unit Capacity Factor (Using DER Net) 50.3 % 80.6 % 57.0 %
23. Unit Forced Rate .

0% 3.32 % 1 947 %

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i

, 25. If Shut Down At End Of Report Period Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved IMITIAL CRT) TALITY i INITIAL ELECTRICITY l 8509110399 850715 COMMERCIAL OPERATION l

PDR ADOCK 05000280-R l (9/77)

. . . _ . _ - ._ - -. ... ... .. . _ . - , ~ _ __ - . _ _ .

- Carr:cttd C py l~ corrected copy j OPERATING DATA REPORT

, DOCKET NO. 50-281 DATE 06-10-85

) COMPLETED BY V. Jones i TELEPHONE 357-3184

~

1. Unit Name: Surry Unit 2 Notes 1
2. Reporting Period: 05-01-85 to 05-31-85
3. Licensed Thermal Power (MWC): 2441
4. Naasplate Rating (Gross MWe): 847.5
5. Design Electrical Racing (Net MWe): 788
6. Maximus Dependable Capacity (Gross MWe): 811
7. .Maximus Dependable Capacity (Net MWe): 775

. 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last

! ,, ,,. ~ Report Give Reasons: .

N/A-1 4

9. Power Level To Which Restricted If Any (Net MWe):

l 10. Reasons For Restrictions, If Any:

i This Month Yr.-to-Date Cummulative I

11. Hours In Reporting Period 744.0 3623.0 105935.0
12. Number of Hours. Reactor Was 1885.5 i Critical 0 67891.0 I
13. Reactor Reserve Shutdown Houre 0 0 328.1 4
14. Hours Generator On-Line 0 1885.5 66793.1
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 4465212.5 156463617.8

! 17. Gross Electrical Energy

Generated (MWH) 0 1426555.0 50717029.0 l 18. Net Electrical Energy i , Generated (MWE) 0 1353723.0 48070165.0 i .
19. Unit Service Factor o 52.0 % 63.1 %

i I

20. Unit Available Factor a 52.'0 % 63.1 %

.21. Unit Capacity Factor (Using MDC Nat) 0 4R.2 % 58.6 %

22. Unit Capacity Factor

{

(Using DER Net) 0 47,4 % 57.6%

4

23. Unit Forced Rate 0 0 14.2 % ,
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration-of Each): '

I

25. If Shut Down At End Of Report Period Estimated Date of Startup: 06-15-85

, 26. Units In Test Status (Prior to Conumercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY ,

COMMERCIAL OPERATION

~

(9/77)

I _ _ _ - , , x .. _ . , - , _ . . . . . ...-,.._,._..-_s.. , . _ . _ _ _ . . _ . . - . . ~ . _ . . _ . _ _ . . - . , - _ . _ . . , ~ _ . . _ _ .