1 OPERATING DATA REPORT DOCKET NO. 50-280 DATE 06-10-85 CMLETED. BY V. Jones TELEPHONE 357-3184 OPERATING STATUS 1.
Unit Name:
Surry Unit 1 Notes 2.
Reporting Period: 05-01-85 to 05-31-85 3.
Licensed Thermal Power (MWt):
2441 4.
Nameplate Rating (Gross MWe):
847.5 5.
Design Electrical Rating (Net MWe): 788 6.
Maximum Dependable capacity (Gross MWe): 820 7.
Maximus Dependable Capacity (Net MWe):
7a1 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons.: N/A 9.
Pow r Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cummulative
- 11. Hours In Reporting Period 744.0 3623.0 109055.0
- 12. Number of Hours Reactor Was Critical 412.9 3207.8 67584.5
- 13. Reactor Reserve Shutdown Hours 0
0 3774.o 14.
Hours Generator On-Line 396.9 3167.3 66176.4
- 15. Unit Reserve Shutdown Hours 0
0 3736.2 16.
Gross Thermal Energy Generated (MWH) 928849.5 7228220.1 153242397.2 17.
Gross Electrical Energy Generated (MWH) 310025.0 2420390.0 49272353.0
- 18. Net Electrical Energy Generated (MWB) 294661.0 2301302.0 46713146.0 19.
Unit Service Factor 53.4 %
87.4 %
60.7 %
20.
Unic Available Factor 53.4 %
87.4 %
64.1 %
- 21. Unit Capacity Factor (Using MDC Net) 50.7 %
81.3 %
57.5 %
- 22. Unit Capacity Factor (Using DER Net) 50.3 %
80.6 %
57.0 %
- 23. Unit Forced Rate 0%
3.32 %
1 947 %
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i 25.
If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved IMITIAL CRT) TALITY INITIAL ELECTRICITY l
8509110399 850715 COMMERCIAL OPERATION PDR ADOCK 05000280-l l
R (9/77)
~
- Carr:cttd C py l~ corrected copy OPERATING DATA REPORT j
DOCKET NO. 50-281 DATE 06-10-85
)
COMPLETED BY V. Jones i
TELEPHONE 357-3184
~
1.
Unit Name:
Surry Unit 2 Notes 1
2.
Reporting Period:
05-01-85 to 05-31-85 3.
Licensed Thermal Power (MWC):
2441 4.
Naasplate Rating (Gross MWe):
847.5 5.
Design Electrical Racing (Net MWe): 788 6.
Maximus Dependable Capacity (Gross MWe): 811
- 7..Maximus Dependable Capacity (Net MWe):
775 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last
,,. ~ Report Give Reasons:
N/A-1 4
9.
Power Level To Which Restricted If Any (Net MWe):
l
- 10. Reasons For Restrictions, If Any:
i This Month Yr.-to-Date Cummulative I
- 11. Hours In Reporting Period 744.0 3623.0 105935.0
- 12. Number of Hours. Reactor Was i
Critical 0
1885.5 67891.0 I
- 13. Reactor Reserve Shutdown Houre 0
0 328.1 14.
Hours Generator On-Line 0
1885.5 66793.1 4
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 4465212.5 156463617.8
- 17. Gross Electrical Energy Generated (MWH) 0 1426555.0 50717029.0 l
- 18. Net Electrical Energy i
Generated (MWE) 0 1353723.0 48070165.0 i
- 19. Unit Service Factor o
52.0 %
63.1 %
i
- 20. Unit Available Factor a
52.'0 %
63.1 %
I
.21.
Unit Capacity Factor (Using MDC Nat) 0 4R.2 %
58.6 %
- 22. Unit Capacity Factor
{
(Using DER Net) 0 47,4 %
57.6%
- 23. Unit Forced Rate 0
0 14.2 %
4 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration-of Each):
I
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
06-15-85
- 26. Units In Test Status (Prior to Conumercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~
(9/77)
I _ _ _ -,
x..
...-,.._,._..-_s..
.. -.. ~. _.. _. _ _.. -., - _. _.., ~ _.. _ _.