CenhaI tiles pmig y
UNITED STATES g
,j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30eeHo01
~s., *****/
February 27, 1997 Mr. Calvin R. Hastings President and Chief Executive Officer Caldon, Inc.
2857 Banksville Road Pittsburgh, PA 15216
SUBJECT:
NRC INSPECTION REPORT 99901311/97-01
Dear Mr. Hastings:
On January 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Caldon, Inc. facility.
The enclosed report presents the results of that inspection.
The inspection was conducted to ascertain your corrective actions relating to the Point Beach Nuclear Plant, Unit 2, Licensee Event Report (LER)
" Potential Feedwater Flow Measurement Inaccuracies," dated July 94-001-01, 29, 1994, Mojel 601, used to measure main feedwater flow in nuclear a'so assessed whether you informed other licensees of this event, and your
~
We screening for Part 21 applicability.
During this inspection, the inspector determined that Westinghouse Electric Corporation manufactured the Model 601 and that you purchased the LEFM technology from Westinghouse but did not sell the Model 601 to the industry.
Your corrective actions pertinent to LER 94-001-01 involved upgrading the LEFM Model 601 to Model 8300 at Point Beach to improve detet. tion of degraded signals from LEFM transducers.
You did not alert licensees about Model 601 inaccurate readings because the LEFM Model 601 was sold as a commercial-grade item and because you do not have a Part 21 program at your facility.
The inspector observed that you did not have information on which licensees operated Model 601 in their facilities.
Based on your sales of Model 8300 to facilities, you currently believe that the Model 601 is no longer used in the industry.
During this inspection, the NRC inspector did not identify any instances in which your activities failed to meet NRC requirements for the areas inspected.
t l
Therefore, no response to this letter is required.
In accordance with 10 CFR 2.790, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.
s q
g 9703030406 970227 PDR GA999 E*******
L 99901311 PDR p
J OW 'O L
came
- 3. $O Q M LM I
I C. Hastings If you have any questions concerning this inspection, we will be pleased to discuss them with you.
l Sincerely, ORIGINAL SIGNED BY Robert M. Gallo, Chief Special Inspection Branch Division of Inspection and Support Programs Office of Nuclear Reactor Regulation Docket No.
99901311
Enclosure:
Inspection Report 99901311/97-01 Distribution PSIB R/F LLGundrum, NRR, PDIII-l DSBrinkman, NRR, PDI-2 JFRingwald, Senior Resident Inspector (SRI), Wolf Creek i
CFlyon, SRI, Beaver Valley Unit I l
TMRoss, SRI, Farley Units 1 and 2 AMcMurtray, SRI, Point Beach Units 1 and 2 PUBLIC Docket Files PSIB R/F l
Central Files RIDS IE:09 Whitebook JWermiel DOCUMENT NAME: G:\\GAUTAM\\CALDON
- see previous concurrence Te r.o.iv.. copy.: ihi. docum.nt, indic.i. in th. box: "C" = Copy without enclosures *E" = Copy #
res "N" = No copy l
OFFICE PSIB: DISP HICB:DRCH lC PSIB: DISP l
PM1fR)lSP lU l
j l
NAME ASGautam:smp*
CKDoutt(4r)
GCCwalina*
RMGallo j
l DATE 02/12/97 02/ 26 /97' 02/19/97 02(71/97 0FFICIAL RECORD COPY i
l
__ _ _ _ __ _ __- _ _ _ _ _.__ __=_____.
I 5
/
C. Hastings /
i If you have any questions concerning this inspection, we will be d to discuss them with you.
Sincerely, l
f 1
1 i
,L Robert M. Gallo, Chief j
c Special ' Inspection Branch /
i Division of Inspection an'd Support Programs-
[
Office of Nuclear React' r Regulation o
)
)
i Docket No.
99901311 1
Enclosure:
Inspection Report 99901311/97-01
/
Distribution PSIB R/F-LLGundrum, NRR, PDIII-1
/
JFRingwald, Senior Resident Inspecto/(SRI), Wolf Creek f' j
DSBrinkman, NRR, PDI-2 r
1
~
CFLyon, SRI, Beaver Valley Unit 1/
l TMRoss, SRI, Farley Units 1 and 2 i
GMtral F11esD g
/
i PUBLIC
/
j Docket Files
/
i PSIB R/F
/
2' Central Files RIDS IE:09 QckeT Files 3 m
j vfiItebook k VJEAM JB-G l
/
f
[
b
/
\\
/
l DOCUMENT NAME:
G:\\GAUTAM\\CALDON f
Ta roosive a copy of h % ment, indicate in the box: "C" es Copy without enclosures "E" = Copy with enclosures *N* = No copy 0FFICE PSIfiULSV l PSII;4}$P lE PSIB: DISP l
l l
NAME AS(atCam:smp GCfwlt h a RMGal1o DATE 02/l2_/97 02// 9 /97 02/
/97
/
OFFICIAL RECORD COPY i
i cc:
Mr. William Hennessy Senior Project Engineer Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 Mr. Richard Miller Principal Engineer (MS East 4-7)
Equipment Design and Regulatory Engineering Westinghouse Electric Corporation i
P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. Garri Ventura Quality Assurance Manager Caldon, Inc.
2857 Banksv111e Road Pittsburgh, PA 15216 i
A I
l