ML20135C078

From kanterella
Jump to navigation Jump to search
Informs That Date Entered for Signing Agreement as Stated in Encl to ,In Error.Tentative Date Should Be 970307
ML20135C078
Person / Time
Issue date: 11/15/1996
From: Bangart R
NRC OFFICE OF STATE PROGRAMS (OSP)
To: Hallisey R
MASSACHUSETTS, COMMONWEALTH OF
References
NUDOCS 9612060160
Download: ML20135C078 (4)


Text

, _. -

.. ~.. -... - -..

NdV 151996

~

. Mr. Robert Hallisey, Director

- o i

Radiation Control Program Department of Public Health t

305 South Street,7th Floor Jamaica Plain, MA 02130,

3 Dear Mr. Hallisey-r Please note in the enclosure to my letter to you dated November 7,1996 that the date entered for the signing of the Agreement is in error. The tentative date should be 3/07/97. Please substitute the enclosed corrected copy of the timeline in place of the one originally transmitted. We regret this error.

Sincerely,

)

Odgha! Signed By i

RfCHARD L BANGART i

Richard L. Bangart, Director i

j Office of State Programs 4

Enclosure:

l As stated i

j i

f i

i Distribution:

DIR RF

,0CD (SPOS)E'"

RLBangart PDR (YES X NO

)

Plohaus i

SDroggitis CHehl,RI Rblanton CGordon, RI FCameron l

Massachusetts File

'See previous concurrence.

DOCUMENT NAME: G:\\RLB\\ CORRECT 1.WPD To receive a copy of this document, Indicate in the box: "C" = Copy without I

attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy

]

OFFICE OSP l

OSP:DD l

OSP:D prj l

a NAME-RLBlanton:maj PHLohaus RLBangart ' b/ J DATE-11/14/96*

11/14/96*

11/15/96*

?$0~hf1?[?

^

2, 0 ha.t Gu-..d_ VH.1 COPY 4

9612060160 961115 PDR STPRG ESGMA g

,PDR

l Mr. Robert Hallisey, Director l-Radiation Control Prograrh, i

l Department of Public Health.

305 South Street,7th Floor _

i

. Jamaica Plain, MA 02130 s

[

Dear Mr. Hallisey:

7

?

. Please note in ths enclosury to the letter dated November 7,1996 from

[Mr.- Rkhard L._Bangert t5 you that be date entered for the signing of the Agreement is in

[

f

\\

orror. The tentative date jhould be 3/07/97. Please substitute the enclosed corrected copy of the timeline'in place of the one originally transmitted. We regret this error.

Sincerely,

)

Richard L. Bangart, Director j

ffice of State Programs

Enclosure:

As stated

)

I I

i l

Distribution:

~'

DlR RF DCD (SP05)

RLBangart PDR (YES X NO

)

o Plohaus SDroggitis CHohl, RI Rblanton CGordon, Rl FCameron Massachuactts File DOCUMENT NAME: G:\\RLB\\ CORRECT 1.WPD To recalve a copy of this document, indicatgiaf the box: "C" = Copy without attachment / enclosure "E" = Copy witt% dot. ment / enclosure "N" = No copy OFFICE OSP

_ lC OS (:t @ k l OSP:Df,,, l

\\

l NAME RL88anton:maj \\//h PHLohd 6 F RLBangartl%@

\\

DATE 11/W/96 'ft 114H96 11//fl96

\\

j OSP FILE CODE: SP-NA-9

\\

\\

N

\\

\\

c

f Uh Jll UNITED STATES

[%

E NUCLEAR REGULATORY COMMISSION E

E WASHINGTON, D.C. 20eeH001

/

November 15, 1996 Mr. Robert Hallisey, Director Radiation Control Program Department of Public Health 305 South Street,7th Floor Jamaica Plain, MA 02130

Dear Mr. Hallisey:

Please note in the enclosure to my letter to you dated November 7,1996 that the date entered for the signing of the Agreement is in error. The tentative date should be 3/07/97. Please substitute the enclosed corrected copy of the timeline in place of the one originally transmitted. We regret this error.

Sincerely, o

(IlAt O'^7A1 Richard L. Bangart, Dire or Office of State Programs

Enclosure:

As stated

(CORRECTED 11/14/96) i TENTATIVE TIMELINE TO CONCLUDE AGREEMENT Note: The anticipated timing of the events listed is based on the assumptions that (1) no new issues will arise, and (2) that there will not be extensive public comment in response to

)

the Federal Register (FR) notice.

APPROXIMATE j

MILESTONE DATE j

l OSP completes, and other NRC offices concur on a request for approval to 10/17/96 publish the proposed Agreement for public comment, and sends it to the EDO.

(DONE)

EDO reviews and forwards the request for approval to publish to the 11/05/96 COMMISSION.

(DONE)

COMMISSION approves request to publish (may specify changes to FR notice).

11/22/96 OSP makes any changes directed by the COMMISSION, and sends the FR notice 11/25/96 to ADMINISTRATION for publication in FR.

ADMINISTRATION forwards proposed Agreement to FR for publication starting 12/02/96 Public comment period ends.

12/30/96 OSP analyses comments, prepares response, and drafts the COMMISSION action 1/10/97 paper to approve the Agreement; sends to NRC offices for comments and concurrence.

NRC offices give their concurrence on entering the Agreement: OSP sends the 1/24/97 paper to the EDO.

EDO concurs and forwards the paper to the COMMISSION.

2/07/97 COMMISSION approves the Agreement.

2/21/97 i

CHAIRMAN and GOVERNOR sign the Agreement.

3/07/97 i