ML20135B593

From kanterella
Jump to navigation Jump to search
Notification of 961210 Meeting W/Util in Arlington,Tx to Discuss Svc Water Sys Improvement Program & Mgt of Biofouling Concerns
ML20135B593
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/03/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9612050067
Download: ML20135B593 (5)


Text

-- . . . ____,._._.m .___.__m _ _ . - . .- . _ _ - . . _ . .

_ . _ _ . . _ _ . . .m ____m_.m__ .._. _ ___

UNITED STAVES f$g "8 0vt, ,t NUCLEAR REGULATORY COMMISSION REGloN IV f 611 RYAN PLAZA DRIVE, SUITE 400 AR LINGToN, T E X AS 76011-8064 k . .^ ". #.8 December 3,1996 NOTICE OF LICENSEE MEETING Name of Licensee: Entergy Operations, Inc.

Name of Facility: Arkansas Nuclear One Docket: 50-313 50-368 Date and Time December 10,1996 of Meeting: 1 p.m. (CST)

Location of Meeting: USNRC, Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011 Training Conference Room Purpose of Meeting: To discuss service water system improvement program and management of biofouling concerns NRC Attendees: L. Callan, Regional Administrator J. Dyer, Director, Division of Reactor Projects D.' Chamberlain, Acting Deputy Director, Division of Reactor Projects (DRP)

T. Gwynn, Director, Division of Reactor Safety (DRS)

C. VanDenburgh, Chief, Engineering Branch, DRS E. Collins, Chief, Project Branch C, DRP T. Reis, Sr. Project Engineer, Project Branch C, DRP Licensee Attendees: D. Mims, Director of Nuclear Safety l C. Zimmerman, Plant Manager, Unit 1 T. Mitchell, Manager, Unit 2 System Engineering B. Day, Manager, Engineering Support C. Shively, Sr. Lead Engineer ,

R. Partridge, Supervisor, Chemistry l NOTE: )

(1) This meeting is open to attendance by members of the general public. j 9612050067 961203 PDR ADOCK 05000313 p PDR -

Entergy Operations, Inc. (2) NRC personnel, not listed above, that desire to attend this meeting should notify E.

Collins at (817) 860-8291 by COB on December 6,1996.

} t Approved B :

J. E. Dyer, Director Division of Reactor Projects i cc:

C. Randy Hutchinson, Vice President a

Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 l Russellville, Arkansas 72801-0967 j Executive Vice President

& Chief Operating Officer j Entergy Operations, Inc. l P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc. j P.O. Box 31995 Jackson, Mississippi 39286 l

Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502

I

  • l t

Entergy Operations, Inc. Bernard Bevill, Acting Director l

Division of Radiation Control and '

Emergency Management i Arkansas Department of Health I 4815 West Markham Street, Slot 30 j Little Rock, Arkansas 72205-3867 i Manager l

Rockville Nuclear Licensing Framatone Technologies 1700 Rockville Pike, Suite 525 l' Rockville, Maryland 20852 i

t

, t

' . b' l

Entergy Operations, Inc. l DEC - 31996 Distribution:

E-Mail To: FOR

() NRC Attendees PMNS Mtg Announcement Coordinator SAM J. L. Milhoan, DEDR PAB H. L. Thompson, DEDS FJM F. J. Miraglia, AD/NRR ACT' A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR GXK G. Kalman, Project Manager, NRR OEMAIL J. Lieberman, D/OE LJC L. J. Chandler, OGC KMK Senior Resident inspector CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO  :

GFS G. F. Sanborn, EO I BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division DXY, LMB, CLG DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley cc:

gDMBflE'45f 7 ,

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DRP File i

I To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:Ci.08P]C l PA0 Pican RSLO l Gul D:DRP G M l

EECollT6s:df BWHenderson CAHackney JEDye r 12/f#36 12/&/96 12/.1 /96 12/3 /96 ,

0FFICJAL RECORD COPY  !

\ ,

050'030 g D

. )

O Entergy Operations, Inc. DEC - 31996 Distribution:

E-Mail To: FOR

() NRC Attendees PMNS Mtg Announcement Coordinator SAM J. L. Milhoan, DEDR PAB H. L. Thompson, DEDS l FJM F. J. Miraglia, AD/NRR I ACT A. C. Thadani, ADT/NRR l RPZ R. P. Zimmerman, ADP/NRR I GXK G. Kalman, Project Manager, NRR l OEMAIL J. Lieberman, D/OE  !

LJC L. J. Chandler, OGC l KMK Senior Resident inspector l CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO l GFS G. F. Sanborn, EO l BWH B. Henderson, PAO I MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division DXY, LMB, CLG DRS Division l CLS1, NLH, WSW DNMS Division I LSO Linda Ousley cc: l DMB (IE 45)  !

OEDO RIV Coordinator (17G21) i Receptionist l ORA File RIV File DRP File To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:C/.ORP]C l PA0 E10tra RSLO l uul D:DRP GQ& l EEColT1Ns:df BWHenderson CAHackney '

JEDyef "

12/f#36 12/A/96 12/.4/96 12/9 /96 0FFICLAL RECORD COPY