ML20135B589

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/96-12 & 50-446/96-12 on 960929- 1109 & Notice of Violation
ML20135B589
Person / Time
Site: Comanche Peak  
Issue date: 11/27/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20135B590 List:
References
NUDOCS 9612050066
Download: ML20135B589 (5)


See also: IR 05000445/1996012

Text

.

.- - - .

-- - . . = .

.

-

-

-


--~

i

!

s k" "%,$

UNITE D STATES

t

NUCLEAR REGULATORY COMMISSION

. , ,

o

'k

3

r

.g

REGloN IV

'

e

C'

E

611 RYAN PLAZA oRIVE, SUITE 400

,

'

W

'+9.....,.0

AR t.INGToN, T E X AS 76011 8064

I

NOV 2 71996

'

Mr. C. L. Terry

TU Electric

Group Vice President, Nuclear

i

' ATTN: Regulatory Affairs Department

!

!

P.O. Box 1002

'

Glen Rose, Texas 76043

i

SUBJECT: NRC INSPECTION REPORT 50-445/96-12:50-446/96-12 AND NOTICE OF

VIOLATION

i

l

Dear Mr. Terry:

j

i

On November 9,1996, the NRC completed an inspection at your Comanche Peak Steam

,

l-

Electric Station, Units 1 and 2, reactor facilities. The enclosed report presents the scope

l

and results of that inspection.

j

During the 6-week period covered by this inspection, your conduct of activities was

i

j

generally characterized by safety-conscious operations and sound engineering and

l

maintenance practices. We are concerned, however, about one violation which was

identified by our inspectors. The violation involved a procedure inadequacy which resulted

,

<

in a failure to meet ASME/ ANSI Code requirements for relief valve testing. The violation is

of concern because it represents a deficiency which could cause invalid relief valve test

!

i

results.

The violation is cited in the enclosed Notice of Violation (Notice), and the circumstances

surrounding the violation are described in detailin the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

!

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

!

its enclosure (s), and your response will be placed in the NRC Public Document

i

Room (PDR).

I

Sincerely,

I

-

.

,

j

h J. E.

yer, Director

3

Division of Reactor Projects

j

"

i

Y

9612050066 961127

PDR

ADOCK 05000445

G

PDR

I

'

. _ . . , _ . .

..

.

.-

- _ . .

.-

-

.

TU Electric

-2-

i

Docket Nos.: 50-445

i

50-446

License Nos.: NPF-87

NPF-89

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-445/96-12;50-446/96-12

'

cc w/ enclosures:

Mr. Roger D. Walker

TU Electric

Regulatory Affairs Manager

P.O. Box 1002

Glen Rose, Texas 76043

Juanita Ellis

President - CASE

1426 South Polk Street

'

Dallas, Texas 75224

i

TU Electnc

j

Bethesda Licensing

3 Metro Center, Suite 610

Bethesda, Maryland 20814

George L. Edgar, Esq.

Morgan, Lewis & Bockius

1800 M. Street, NW

Washington, D.C. 20036

G. R. Bynog, Program Manager /

Chief Inspector

Texas Department of Licensing & Regulation

Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

Honorable Date McPherson

County Judge

P.O. Box 851

Glen Rose, Texas 76043

1

i

i

I

i

TU Electric

-3-

l

.

!

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

Susan Rieff, Director

Environmental Policy

Office of the Governor

P.O. Box 12428

Austin, Texas 78711

.

i

)

!

I

i

l

!

l

[

l

i

.

!

L

. . . - _ . .

-

-

. . . _ . - .

i

.

.

i

TU Electric

-4-

NOV 2 T 1996

i

!

l

J

,

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

,

E-Mail report to Richard Correia (RPC)

j

E-Mail report to Ronald Frahm, Jr. (RKF)

bcc._to DMS (IE01..)-.

.,

w ,~

-

a

.

l

I

bec distrib, by RIV:

I

L. J. Callan

Resident inspector (2)

DRP Director

DRS-PSB

'

Branch Chief (DRP/A)

MIS System

!

Project Engineer (DRP/A)

RIV File

i

!

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Allegations Coordinator (2)

G. F. Sanborn, EO

I

!

l

I

i

)

!

l

!

l

DOCUMENT NAME: R:\\_CPSES\\CP612RP.ATG

To receive copy of document, indicate in box: "C" = Copy without enclosures E" =fopy with enclosures N" = No copy

RIV: SRI

C:DRP/A

C:ARB (j,,)

D:DRF[f7

,

l

ATGody, Jr. Q

JITapia M ,-

RWise F

DDChTMberlain

!

11/M96

11/h /96

((/'])(/96

'f 29/96

/

-

OFFICIAL RECORD CO )Y

050020

(\\

-

--

.

.

.

.-

-

-

I

.

TU Electric

-4-

NOV 271996

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Richard Correia (RPC)

E-Mail report to Ronald Frahm, Jr. (RKF)

bec to DMB (IE01)

bec distrib. by RIV:

L. J. Callan

Resident Inspector (2)

DRP Director

DRS-PSB

Branch Chief (DRP/A)

MIS System

Project Engineer (DRP/A)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Allegations Coordinator (2)

G. F. Sanborn, EO

i

DOCUMENT NAME: R:\\_CPSES\\CP612RP.ATG

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" =fopy with enclosures "N" = No copy

RIV: SRI

l

C:DRP/A

C:ARB[j,,)

D:DRFf/7

ATGody, Jr. k

JITapia Me

RWise F

DDChTMberlain

11/al/96

11/>b /96

{(/)/96

ff gq/96

/

OFFICIAL RECORD COPY