ML20135B560
| ML20135B560 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 12/02/1996 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Mcgaha J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20135B562 | List: |
| References | |
| NUDOCS 9612050057 | |
| Download: ML20135B560 (5) | |
See also: IR 05000458/1996015
Text
+
f
i
t# "' %
UNITED STATES
.t
NUCLEAR REGULATORY COMMISSION
..
REGloN IV
<
3
611 RYAN PLAZA DRIVE, SUITE 400
'"
4,
.....
2 1996
John R. McGaha, Vice President - Operations
River Bend Station
' Entergy Operations, Inc.
P.O. Box 220
i
St. Francisville, Louisiana 70775
!
'
i
SUBJECT: NRC INSPECTION REPORT 50-458/96-015 AND NOTICE OF VIOLATION
I
i
Dear Mr. McGaha:
!
I
An NRC inspection was ccnducted September 22 through November 2,1996, at your
!
River Bend Station reactor facility. The enclosed report presents the scope and results of
l
that inspection.
!
During the 6-week period covered by this inspection period, your conduct of activities at
j
the River Bend Station facility was generally characterized by safety-conscious operations,
j
sound engineering and maintenance practices, and good radiation protection support. We
are concerned, however, about two violations of NRC requirements that were identified in
j
the first instance, four examples of failure to maintain configuration control of.
'
safety-related systems were identified. In the second instance, personnel f ailed to
implement the inservice testing progran, for the standby service water pumps. We are
]
particularly concerned that inservice testing implementation problems continue to occur, as
!
discussed in NRC Inspection Report 50-458/96-13.
]
i
These violations are cited in the enclosed Notice of Violation (Notice), and the
circumstances surrounding the violations are described in detail in the enclosed report.
Please note that you are required to respond to this letter and should follow the
instructions specified in the enclosed Notice when preparing your response. The NRC will
use your response, in part, to determine whether further enforcement acDon is necessary
to ensure compliance with regulatory requirernents.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosures, and your response will be placed in the NRC Public Document Room (PDR).
To the extent possible, your response should not include any personal privacy, proprietary,
or safeguards inforrnation so that it i an be placed in the PDR without redaction.
i
o
.
.
- . . . _ . . _ _ _ _
- _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ . . . . _ _ _ _ _-
j
.
1
4
j
=
l
Entergy Operations, Inc.
-2-
I
a
1
!
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
.
i
Sincerely,
b
f)
e
{/ /
.
I
h
h J. E. Dyer, Director
Division of Reactor Projects
Docket No.: 50-458
License No.: NPF-47
Enclosures:
2. NRC Inspection Report
50-458/96-015
cc w/ enclosures:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
General Mana0er
Plant Operations
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
Director - Nuclear Safety
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
-
I
2 1996
I
'
Entergy Operations, Inc.
-4-
u
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
..
E-Mail report to Ronald Frahm, Jr. (RKF)
E-Mail report to Richard Correia (RPC)
Jcc to DMB (IE01)
'
bec distrib. by RIV:
'
L. J. Callan
Senior Resident inspector (Grand Gulf)
4
DRP Director
Branch Chief (DRP/D)
DRS-PSB
Project Engineer (DRP/D)
MIS System
Branch Chief (DRP/TSS)
RIV File
Resident Inspector
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
DOCUMENT NAME: R:\\_RB\\RB615RP.WFS
To receive copy of document, indicate in box: "C" = Copy witput enclosures "E" = Copy wth enclosures "N" = No copy
l E
C:DRP/p , j' , i jjL.D:DRFj)p[] l
l
WFSmith
PHHatrelyMKAp JEDyer'" 74
11/13/96
11/(6/9% (W '
12/2/96
d
O FI IAL RECORD COPY
I
050027
,
x
.i
-i
.
2 1996
.
Entergy Operations, Inc.
-4-
l
,
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Ronald Frahm, Jr. (RKF)
E-Mail report to Richard Correia (RPC)
l
bec to DMB (IE01)
!
bcc distrib. by RIV:
L. J. Callan
Senior Resident inspector (Grand Gulf)
DRP Director
Branch Chief (DRP/D)
DRS-PSB
Project Engineer (DRP/D)
MIS System
Branch Chief (DRP/TSS)
RIV File
i
Resident inspector
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
i
\\
DOCUMENT NAME: R:\\,GB\\RB615RP.WFS
To receive copy of document, le dicate in box: "C" = Copy witput enclosures "E" = Copy with enclosures "N" = No copy
,
E
C:DRP/F , f , i f)L D:DRF()p[]
PHH /rel@KAy/ JEDyer "74
T
WFSmith
9
T!/13/96
11/(6/9% j'YV'
12/2/96
J
O Fi IAL RECORT COPT
i