j NUCLEAR REG 81LATORY COMMISSION 2-WASHINGTON, D.C. 2006&e001
- /
November 29, 1996 Mr. Donald F. Schnell Senior Vice President - Nuclear Union Electric Company Post Office Box 149 St. Louis, Missouri 63166 l
SUBJECT:
GENERIC LETTER 96-05, " PERIODIC VERIFICATION OF DESIGN-BASIS CAPABILITY Of CATETY-RELATED MOTOR-0PERATED VALVES" - CALLAWAY PLANT, UNIT I (TAC NO. M97027)
Dear Mr. Schnell:
By letter dated November 6,1996, Union Electric Company (UE) submitted its 60-daf response to Generic Letter (GL) 96-05, " Periodic Verification of
- Design-Basis Capability of Safety-Related Motor-0perated Valves," for the l
Callaway Plant, Unit 1.
In the response, UE indicated that based on previous staff review of the GL 89-10 program at Callaway, UE did not plan to implement the requested actions in GL 96-05 and considered all actions in GL 96-05 to be closed for the Callaway Plant.
l On June 8,1994, the NRC staff notified you that we had completed our review of your GL 89-10 program.
In that letter, we referred to your plans to l
perform periodic performance verification of your safety-related motor-operated valves (H0Vs) and to continue to monitor industry data to ensure that margin was available to compensate for potential degradation.
In the almost 2-1/2 years since the staff reviewed your GL 89-10 program, significant activities have been conducted by the industry and NRC to address long-term MOV performance. These activities include:
i l
1.
completion of the MOV performance prediction program by the Electric Power Research Institute and NRC issuance of a safety evaluation on the EPRI program; 2.
preparation of a code case by the American Society of Mechanical l
Engineers on an MOV periodic verification program that could be used as l
an alternative to stroke-time testing; and l
3.
tests sponsored by the NRC on the aging of valve material samples.
In light of this new information, the staff requested in GL 96-05 that licensees who have developed MOV periodic verification programs in response to GL 89-10, review those programs to determine whether any changes are appropriate. The staff has also learned that the utility owners' groups are considering an industry-wide effort in developing long-term MOV programs in response to GL 96-05. Therefore, although the staff considered your MOV a
gg b
9612040262 961129 PDR ADOCK 05000483 P
1 e
l Mr. D. F. Schnell November 29, 1996 cc:
Professional Nuclear Mr. Neil S. Carns Consulting, Inc.
President and Chief Exccutive Officer 19041 Raines Drive Wolf Creek Nuclear Operating Corporation Derwood, Maryland 20855 P.O. Box 411 Burlington, Kansas 66839 Gerald Charnoff, Esq.
Thomas A. Baxter, Esq.
Mr. Dan I. Bolef, President Shaw, Pittman, Potts & Trowbridge Kay Drey, Representative 2300 N. Street, N.W.
Board of Directors Coalition Washington, D.C.
20037 for the Environment 6267 Delmar Boulevard Mr. H. D. Bono University City, Missouri 63130 Supervising Engineer, Site Licensing Mr. Lee Fritz Union Electric Company Presiding Commissioner Post Office Box 620 Callaway County Court House i
Fulton, Missouri 65251 10 East Fifth Street Fulton, Missouri 65151 U.S. Nuclear Regulatory Commission Resident Inspector Office Mr. Alan C. Passwater, Manager l
8201 NRC Road Licensing and Fuels Steedman, Missouri 65077-1302 Union Electric Company Post Office Box 149 Mr. G. L. Randolph, Vice President St. Louis, Missouri 63166 Nuclear Operations Union Electric Company Mr. J. V. Laux, Manager i
P.O. Box 620 Quality Assurance l
Fulton, Missouri 65251 Union Electric Company l
Post Office Box 620 l
Manager - Electric Department Fulton, Missouri 65251 Missouri Public Service Commission 301 W. High i
Post Office Box 360 l
Jefferson City, Missouri 65102 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 l
Arlingtur., Texas 76011-8064 l
Mr. Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 1
(
l l
e Mr. Donald Schnell 2-Based on the above, we request that you submit a supplemerit to your 60-day response within 15 days of receipt of this letter, indicating what action (s) you will be taking in response to GL 96-05 to ensure the effectiveness of the current MOV periodic verification program.
If you have any questions, please contact me at (301) 415-1362.
Sincerely, Original signed by:
Kristine M. Thomas, Project Manager 1
Project Directorate IV-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No. 50-483 DISTRIBUTION:
Docket; File cc See next page:
PUBLIC~
PDIV-2 Reading JRoe EAdensam WBateman KThomas RWessman, EMEB AHansen ACRS, TWFN OGC, 015B18 WJohnson, RIV JDyer, RIV EPeyton TScarbrough, EMEB i
DOCUMENT NAME: CAL 97027.LTR (i
N 0FC PDIV-2/PM PDIV-2/LA EMEB48G NAME KTh$$[:ye EN RWeNan DATE 11/$/96 11 % /96 11M/96 0FFICIAL RECORD COPY o
040038
l 1
Mr. Donald Schnell '
Based on the above, we request that you submit a supplement to your 60-day rc ecse within 15 days of receipt of this letter, indicating what action (s) you will be taking in response to GL 96-05 to ensure the effectiveness of the current MOV periodic verification program.
If you have any questions, please contact me at (301) 415-1362.
Sincerely, Original signed by:
Kristine M. Thomas, Project Manager Project Directorate IV-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No. 50-483 DISTRIBUTION:
Docket File i
cc See next page:
PUBLIC PDIV-2 Reading i
JRoe l
EAdensam WBateman l
KThomas RWessman, EMEB AHansen ACRS, TWFN OGC, 015B18 WJohnson, RIV JDyer, RIV l
EPeyton TScarbrough, EMEB COCUMENT NAME: CAL 97027.LTR (l h0\\2U}(g OFC PDIV-2/PM PDIV-2/LA EMEBIAG 1
l NAME KTh'o$m7:ye EN RWeNan DATE 11/6/96 l @ /96 11M/96 0FFICIAL RECORD COPY i