.q November 14, 1996 i
Mr. Ted C. Feigenbaum.
Executive Vice President and Chief Nuclear Officer Northeast Utilities Service Company c/o Mr. Terry L. Harpster P.O. Box 128 Waterford, CT 06385
SUBJECT:
MAINTENANCE RULE BASELINE INSPECTION FOR SEABROOK-pear Mr. Feigenbaum:
In a telephone conversation on November. 13,1996, between Mr.' J. Sobotka and Mr. J. Williams, arrangements were made for the NRC to conduct a baseline inspection of your maintenance rule program at Seabrook. The inspection is planned for the week of January 27,1997.
The inspection objective is to evaluate your performance to support compliance with the ~
l requirements of 10 CFR 50.65, " Requirements for monitoring the effectiveness of.
j maintenance at nuclear power plants." The inspection will be conducted using Inspection i
Procedure 62706, " Maintenance Rule" and willinvolve a team of at least 4 inspectors.
l The team will require information about your program for their in-office preparation for the inspection.- This information is identified in the enclosure to this letter. Please provide this information to Mr. Williams by January 6,1997. Mr. Sobotka has been advised of this
.l request.
Thank you for your cooperation in this matter. If you have any questions regarding this' inspection, please contact me at (610) 337-5211 or E-mail address GWM@NRC.GOVi i
Sincerely, 8'4 f
Glenn W. Meyer, Chief 1'I Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Uo.
50-443 i
Enclosure:
Reference Material needed for maintenance rule inspection
-l 1
6L0 l
'9612040111 961114
'PDR ADOCK 05000443 e
1 l
T Mr. Ted C. Feigenbaum 2
cc w/ encl:
B. D. Kenyon, President - Nuclear Group 1
D. M. Goebel, Vice President - Nuclear Oversight F. C. Rothen, Vice President - Work Services J. K. Thayer, Vice President - Recovery Officer, Nuclear Engineering & Support Officer H. F. Haynes, Director - Nuclear Training B. L. Drawbridge, Executive Director - Services & Senior Site Officer i
A. M. Callendrello, Licensing Manager - Seabrook Station W. A. DiProfio, Nuclear Unit Director - Seabrook Station R. E. Hickok, Nuclear Training Manager - Seabrook Station L. M. Cuoco, Senior Nuclear Counsel W. D. Meinert, Nuclear Engineer D. C. McElhinney, RAC Chairman, FEMA RI, Boston, Mass.
R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire S. Choi, Director, Nuclear Safety, Massachusetts Emergency Management Agency F. W. Getman, Jr., Vice President and General Counsel - Great Bay Power Corporation Commonwealth of Massachusetts, SLO Designee R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts Seacoast Anti-Pollution League State of New Hampshire, SLO D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States p
1 1
1 l f 4
Mr.'Ted C. Feigenbaum 3
Distribution w/ encl:
Region i Docket Room (with concurrences)
D. Screnci, PAO (1) l J. Rogge, DRP NRC Resident inspector 4
E. Conner, DRP t
C. O'Daniell, DRP Nuclear Safety Information Center (NSIC)
PUBLIC I
3 W. Dean, OEDO 2
f.
A. DeAgazio, PD l-3, NRR R. Correia, NRR (RPC)
R. Frahm, Jr., NRR (RKF) 1 D. Screnci, PAO, ORA l
Inspection Program Branch, NRR (IPAS) i J. Williams, DRS i
DRS File
)
i 1
j.
I i
i i
L h
1
?
f i:.
t I
i DOCUMENT NAME: A:SEAMRI.JHW Ts recchre e copy of this document, indicate in the box: 'C' = Copy wrthout attachment / enclosure "E" = Copy with attachment / enclosure
- N" = No copy OFFICE Rl/DRS
_._[
Rl/DRS l
/
l l
l j-NAME JWILLIAMS (J/fA)
GMEYER
( ; y DATE 11/14/96
/
11/ /V/96)7~
11/
/96 11/
/96 11/
/96 4
W FICIAL RECORD COPY I
4 i
t
{
a 8
REFERENCE MATERIAL FOR MAINTENANCE RULE INSPECTION
- 1.
Copy of Maintenance Rule Program and all related procedures including those relating to expert panels, PRA, risk assessments and ranking, and scoping.
- 2.
List of Systems, Structures, and Components (SSCs) within the scope of the maintenance rule.
- 3.
List of SSCs placed in (a)(1) and (a)(2) categories of the maintenance rule.
- 4.
List of maintenance preventable functional failures (MPFFs) for the current operating cycle with any repetitive failures identified.
- 5.
List of risk significant and risk rankings.
- 6.
Assessments of risk significant and risk rankings.
- 7.
Organization chart depicting key personnel involved in maintenance rule implementation and list of their office telephone numbers, including system engineers and their systems.
)
8.
Background explanations for SSCs currently assigned to the (a)(1) category.
9.
Copy of any internal or external maintenance rule assessments.
10.
Current maintenance rule trending data.
- 11.
Current performance criteria and goals for SSCs. If PRA used, provide PRA information.
12.
Qualifications and backgrounds for Expert Panel Members.
- 13. Risk Reduction Worth, Risk Achievement Worth, and Core Damage Frequency j
I results; if applicable.
Items identified with asterisk (*) are needed for in-office review prior to the inspection onsite.
~_ _
i i
l REFERENCE MATERIAL FOR MAINTENANCE RULE INSPECTION i'
- 1.
Copy of Maintenance Rule Program and all related procedures including those relating to expert panels, PRA, risk assessments and ranking, and scoping.
- 2.
List o' Systems, Structures, and Components (SSCs) within the scope of the i
l maintenance rule.
I
- 3.
List of SSCs placed in (a)(1) and (a)(2) categories of the maintenance rule.
- 4.
List of maintenance preventable functional failures (MPFFs) for the current operating j
cycle with any repetitive failures identified.
I l
- 5.
List of risk significant and risk rankings.
- 6.
Assessments of risk significant and risk rankings.
- 7.
Organization chart depicting key personnel involved in maintenance rule j
implementation and list of their office telephone numbers, including system engineers and their systems.
l 8.
Background explanations for SSCs currently assigned to the (a)(1) category.
9.
Copy of any internal or external maintenance rule assessments.
j 10.
Current maintenance rule trending data.
- 11.
Current performance criteria and goals for SSCs. If PRA used, provide PRA i
information.
i 12.
Qualifications and backgrounds for Expert Panel Members.
- 13. Risk Reduction Worth, Risk Achievement Worth, and Core Damage Frequency i
results; if applicable.
Items identified with asterisk (*) are needed ~for in-office review prior to the inspection onsite.