RBG-21-741, Forwards Rev 1 to Procedure OSP-0007, Preparation of Operations Section Procedures & Rev 0 to OSP-0008, Verification & Validation of Emergency Operating Procedures
| ML20135A913 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/26/1985 |
| From: | Booker J GULF STATES UTILITIES CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20135A916 | List: |
| References | |
| RBG-21-741, NUDOCS 8509100312 | |
| Download: ML20135A913 (3) | |
Text
_ _ _
l GULF STATES UTELITIES COMPANY P O S T O F F IC E 8 0 X 29S1.9EAUMONT, TEXAS 77704 AREACODE 409 838 6631 August 26, 1985 RBG-21,741 File Nos. G9.5, G9.33.4 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Denton:
River Bend Station-Unit 1 Docket No. 50-458 This response provides additional information or clarifications to previous submittals addressing the River Bend Station (RBS) Emergency Operating Procedures (EOP) Generation Package.
A.
The following clarification is provided to Gulf States Utilities Company's (GSU) February 27, 1984 (RBG-17,137), Attachment 1.
1) rnder items 2,
3 and 4, CSU committed to provide OSP-0007, he 1, " Preparation of Operations Sections Procedures", and OS?-0008 Rev.
O,
" Verification and Validation of Emergency Operating Procedures".
Both procedures are provided in.
2)
Item 5(a):
"These casualties will be organized into scenarios that will exercise each E0P",
within the modeling capabilitien of the simulator, "during the initial Operation Simulator Trsining Program".
B.
During a February 1985 telephone conference between CSU and Staff representatives, a discussion on GSU's letter dated January 15, 1985 (RBG-19,891) we.s conducted and the following confirmation was requested.
1)
Deviation Page Nt. 1 The intent of i.PG Caution Nos. 6 and 8 are included in E0P-0001 and E0P-0'02, respectively.
f hOY 8509100312 850826 PDR ADOCK 05000458 i
F PDR i
F 2)
Deviation Page-No. 47 The maximum rod withdrawl bank (MRWB) position is (04).
Revision 2 of E0P-0001, Step 3.3.5 and E0P-0005, Step 3.1.4.3 as well as Revision 0,
of A0P-0021, Step 2.1 have been corrected from a MRWB position of (06) to (04).
3)
Deviation Page No. 33 I
Item No.
2 justification requires an editorial correction of containment pressure from 2 to-12 Psig (Attachment 2).
C.
In GSU's April 17, 1985 letter (RBG-20,638) an editorial correction is required. A statement under Deviation Page 17 should read as follows:
l-Step 5.8 has-been renumbered to Step 5.9 in the revision to J
]
'If additional information is required, please contact Mr. Rick J.
King at (504) 381-4212.
~
Sincerely, r f.
l J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/ J /kt 2
Attachments l
1 i
h j
1 ATTACHMENT 1 t
e l
1 w
i J
1 i
e t
9 I
1, e
i I
1
-t
.i
. --