Forwards ISI Results for FCS 1996 Refueling Outage,Form NIS- 1, Owner Rept for Isis
ML20135A803
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/25/1997
From: Gambhir S
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135A804 List:
References
LIC-97-023, LIC-97-23, NUDOCS 9702270413
Download: ML20135A803 (1)


Text

I 4

c~ 7 8 ham Omaha PublicPowerDistrict 444 South 16th Street Mall Omaha NE68102-2247 February 25, 1997 LIC-97-023 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington. DC 20555

Reference:

Docket No. 50-285

SUBJECT:

Fort Calhoun Station (FCS) 1996 Refueling Outage Inservice Inspection (ISI)

Results and NIS-1 and NIS-2 Forms Technical Specification Section 5.9.3a and the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code.Section XI. Subsection IWA-6230, require that the Omaha Public Power District submit the subject information for FCS.

Enclosed please find the ISI results for the FCS 1996 Refueling Outage, Form NIS-1

" Owner's Report for Inservice Inspections.* Also enclosed is the Form NIS-2 " Owner's Report for Repairs or Replacements" for applicable repairs and replacements completed during Fuel Cycle No.16, including those completed during the FCS 1996 Refueling Outage.

Please contact me if you have any questions.

Sincerely.

(9 S. 0. Gambhir Division Manager Engineering & Operations Support TCM/tcm Enclosures c: Winston & Strawn (w/o enclosures)

{,

L. J. Callan, NRC Regional Administrator, Region IV L. R. Wharton, NRC Project Manager

/ h. 7 W. C. Walker NRC Senior Resident Inspector 9702270413 970225 l PDR ADOCK 05000285  !

O PDR l

~<vu35 j M l l