ML20135A790

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to Region V FY85 Regional Operating Plan, to Document Certain Resource Allocation Changes Made During End of Third Quarter Review
ML20135A790
Person / Time
Issue date: 09/06/1985
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20135A793 List:
References
NUDOCS 8509100273
Download: ML20135A790 (1)


Text

o l

SEP 061985 MEMORANDUM FOR:

V. Stello, Jr., Deputy Executive Director for Regional Operations and Generic Requirements FRON:

B.11. Faulkenberry, Deputy Regional Administrator i

SUBJECT:

Revision of Regional Operating Plan In accordance with Field Policy Manual, Procedure No. 3 - Revision 1, the enclosed revised copy (Revision 2) of the Recion V Regional Operating Plan is being submitted to document certain resourec allocation changes, in the l

Inspection and Enforcement, Nuclear Reactor Regulation, and Nuclear Material l

Safety and Safeguards Program Areas, that were made during our end of third quarter review. These resource changen were coordinated with and agreed to i

l by IE, NRR, and NMSS. The current revisions are identified by a double bar (ll) in the right hand margin of each page.

t II. fl. IG,(ulkenberry)Y j'

')l$/

Deputy Regional Administrator cc w/enclosurer J. Taylor (IE)

!!. Denton (NHR) o l

J. Davis (NMSS) l bec w/ enclosure RSP/ Document Control Desk (RIDS)

Mr. Hartin Nr. Faulkenberry l

FAUI.KENhfMRY/ dot SCANANO KlHScil llAffil.l.

ilAHi!N 9/ /MS 9/ /85 9/ /85 9/ /85 9/ /85 i k$)\\

b 3 050906 0b0910 I

P M

e poet s

i 030910 213

-