1 Omaha PublicPowerDistrict 444 South 16th Street Mall Omaha NE68102-2247 November 25, 1996 LIC-96-0188 1
U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Mail Station P1-137 Washington, D.C.
20555
Reference:
Docket No. 50-285
Subject:
Transmittal of Fort Calhoun Station (FCS) Core Operating Limit Report (COLR)
Revisions 11 & 12 In accordance with Technical Specification 5.9.5. the Omaha Public Power District (OPPD) is transmitting the attached revisions to the FCS COLR. Revision 11 of the COLR was issued to update Figures 4. 5. 6. 7A. and 8 to reflect new limiting condition for operation (LCO). limiting safety system setting (LSSS). and setpoint requirements as a result of widening the axial shape index (ASI) tent during Cycle 16.
Revision 12 of the COLR was issued as an update for Cycle 17 j
operations.
If you should have any questions, please contact me.
1 Sincerely.
44 (, hi T. L. Patterson Division Manager Nuclear Operations 0
TLP/mle i
Attachments c:
Winston & Strawn (w/o attachments)
L. J. Callan. NRC Regional Administrator. Region IV L. R. Wharton. NRC Project Manager 030062 W. C. Walker. NRC Senior Resident Inspector 1
l 9612030331 961125 l
PDR ADOCK 05000285 pi yrnent with Equal Opportunity i
P PDR
LIC-9'6-0188 OMAHA PUBLIC POWER DISTRICT FORT CALHOUN STATION UNIT NO. 1 CORE OPERATING LIMITS REPORT (COLR)
REVISION 11