i
.jpn re4 UNITED STATES V
9'a NUCLEAR REGULATORY COMMISSION 4
y S
i REGION N a
o 101 MARIETTA STREET, N.W., SUITE 2000 b
k*****[j=
ATLANTA, GEORGIA 303D4108 l
(CORRECTED COPY)
August 8, 1996 i
Westinghouse Electric Corporation i
ATTN: Mr. J. A. Fici Manager Columbia Plant
-Commercial Nuclear Fuel Division Drawer R Columbia, SC 29250
SUBJECT:
NRC INSPECTION REPORT NO. 70 1151/96 02 i
Dear Mr. Fici:
'I i
This-refers to the inspection conducted on July 8-12, 1996, at the Consercial Nuclear Fuel Division. The purpose of the inspection was to determine whether i
activities authorized by the license were conducted safely and in accordance with NRC requirements. At the conclusion of the inspection, the findings were l
- discussed with those members of your staff identified in the report.
j Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.
' Within the scope of the inspection, violations or deviations were not identified.
t In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosure will be placed in the NRC Public Document Room.
(
Should you have any questions concerning this letter, please contact us.
Sincerely, Edward J. McAlpine, Chief Fuel Facilities Branch Division of Nuclear Materials Safety Docket No. 70 1151 License No. SNM 1107 j
Enclosure:
NRC Inspection Report i
cc w/ encl:
(See Page 2) 9612030044 961120 PDR ADOCK 07001151 i
C PDR i
i
'