Confirms Arrangements Made in 961031 Telcon Between Grantham & Me Ernstes for Administration of Licensing Exam at Edwin I Hatch Nuclear Plant.Exam Preparation Visit Scheduled for 970303 & Written & Operating Exams for 970317
ML20134Q267
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/12/1996
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Beckham J
GEORGIA POWER CO.
References
NUDOCS 9612020203
Download: ML20134Q267 (5)


Text

. . ~ . . _ . - . _ . _ _ . _ _ _ . _ . . ._ _ _ _ _ ._. _ _ _ _ - . _ _ _ _

l-i

4
p. November 12. 1996 ,

c Georgia Power Company

ATTN
.Mr. J. T. Beckham, Jr.
Vice President, Plant Hatch l t Nuclear Operations )

i' P. O. Box 1295 i Birmingham, AL'.35201

SUBJECT:

SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS - '

[

a EXAMINATION REPORT NO. 50-321/97-300 AND 50-366/97-300 '

Dear Mr. Beckman:

-f I The purpose of this letter is to confirm arrangements made in a telephone conversation on '

October 31,199S, between Mr. Steve Grantham, Operations Training Supervisor, and

Mr. Michael E. Emstes, License Examiner, NRC Region ll Operator Licensing and Human

! Performance Branch, for the administration of licensing examinations at the Edwin I. Hatch l Nuclear Plant. The examination preparation visit is scheduled for the week of March 3,1997.

j . The written and operating examinations are scheduled for the week of March 17,1997, i

This examination will be developed and administered as part of the NRC pilot initial 7 examination process based on your staff's request to participate in the pilot process. The

NRC pilot initial examination process will permit your staff to draft the written examinations.
and operating tests for operator and senior operator license applicants. The NRC will review  !

i and approve the proposed examinations and tests and independently administer the operating tests to license applican's. Your staff will not administer any portion of the  :

1 operating tests; however, they will administer the written examinations. The NRC will review  :

j. the graded written examinations, grade each applicant's operating test performance, make  ;

i ' the final pass or fail decisions, and issue licenses, as appropriate.

Your staff will develop the licensing examinations in accordance with the' guidelines in y Revision 7, Supplement 1, of NUREG-1021, " Operator Licensing Examiner Standards".  ;

Additional information 'on the development of the licensing examinations will be issued separately, l 4

( To prepare and administer the examinations on the above schedule, Mr. Emstes, License

Examiner, identified to Mr. Grantham the subset of reference materials identified in Attachment 2 of ES-201 that would be necessary under the pilot process. This material
should be submitted by January 17,1997. *
_ Your staff will prepare and, after NRC review and approval, administer the written '

j examinations in accordance with ES-401 and ES-402 of NUREG-1021. The NRC's

}' guidelines for administering the written examinations are described in ES-402, Attachment 1.

Your staff will prepare and the NRC will administer the operating tests in accordance with
ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it l will be necessary for your staff to make the simulation facility available on the dates noted -

j . above. Your staff should retain the original simulator performance data (e.g., system )

pressures, temperatures, and levels) generated during the dynamic operating tests until the

! examination results are final. I  ;

3 - -----

! 9612020203 961112

PDR ADOCK 05000321 V PDR

~

i ,

I GPC 2 I i

ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and  :

guidelines that will be in effect while the written exam' nation and operating tests are being l administered. l a . ..

l Your staff should submit preliminary reactor and senior reactor operator license applications '

i and waiver requests at least 30 days before the first examination date so that the NRC will  !

) be able to review the applications and the medical certifications and evaluate any requested l waivers. If the applications are not received at least 30 days before the examination date, a

~

}

j postponement may be necessary. Finally, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (OMB) Clearance Number f j 3150-0101, which expires April 30,1997. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per l response, includes o Mhering, xeroxing, and mailing the required material. Send comments l about this burden et,6 mate or any other aspect of this collection of information, including

  • l suggestions for reducing this burden, to the information and Records Management Branch,
Mail Stop T-6, F33, Office of Information Resources Management, U.S. Nuclear Regulatory  ;
Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101),  !

4 Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and '

Budget, Washington, D.C. 20503.

From the requested reference materials identified in the enclosure, we would appreciate j retaining your EOPs and AOPs for reference use in our incident Response Center. If you have any concems about this proposed use, please contact me.

) We appreciate your cooperation. Mr. Grantham has been advised of the NRC guidelines and policies addressed in this letter. If you have any questions on the examination process,

please contact me at (404) 331-5541 or E-mail address TAP @NRC. GOV.

1

Sincerely,  ;

! i (Original signed by H. Christensen for) l

Thomas A. Peebles, Chief l Operator Licensing and Human l Performance Branch Division of Reactor Safety  ;
i. Docket Nos. 50-321, 50-366  !

j' License Nos. DPR-57, NPF-5  !

I

Enclosure:

List of Reference Materials I

]

! cc w/ encl: See page 3 J l l

- . _ . - . _ --. __. - . . - - . _ . . _ , . - . ~ . . . _ _ _ , , _ _ ,

GPC 3 cc w/ encl:

J. D. Woodard Chairman Senior Vice President Appling County Commissioners

, Georgia Power Company County Courthouse Nuclear Operations Baxley, GA 31513 P. O. Box 1295 Birmingham, AL 35201 Thome:s P. Mozingo

, Manage of Nuclear Operations H. L. Sumner, Jr. Oglethorpe Power Corporation General Manager, Plant Hatch 2100 E. Exchange Place Georgia Power Company Tucker, GA 30085-1349 P. O. Box 439 Baxley, GA 31513 Charles A. Patrizia, Esq. I Paul, Hastings, Janofsky & Walker D. M. Crowe 10th Floor Manager Licensing - Hatch 1299 Pennsylvania Avenue Georgia Power Company Washington, D. C. 20004-9500 P. O. Box 1295 Birmingham, AL 35201 Steven M. Jackson 1 Senior Engineer - Power Supply Emest L. Blake, Esq. Municipal Electric Authority Shaw, Pittman, Potts and of Georgia Trowbridge 1470 Riveredge Parkway NW 2300 N Street, NW Atlanta, GA 30328-4684 Washington, D. C. 20037 Mr. John C. Lewis 4

Charles H. Badger Training Manager Office of Planning and Budget E. l. Hatch Nuclear Plant Room 610 P. O. Box 439 I 270 Washington Street, SW Baxley, GA 31513 l Atlanta, GA 30334 Distribution w/ encl:

1 Harold Reheis, Director K. N. Jabbour, NRR ,

Department of Natural Resources P. H. Skinner, Ril

, 205 Butler Street, SE, Suite 1252 R. W. Wright, Ril Atlanta, GA 30334 W. P. Kleinsorge, Ril M. E. Ernstes, Ril Thomas Hill, Manager G. A. Hallstrom, Ril

Radioactive Materials Program PUBLIC Department of Natural Resources 4244 Intemational Parkway NRC Senior Resident inspector Suite 114 U.S. Nuclear Regulatory Commission Atlanta, GA 30354 11030 Hatch Parkway North

_ f q Baxley, GA 31513 OFFICE Ril DRS RII DRS R i Rfl DRS SIGNATURE

%{ l NAME MEmstes shd OLPOC P kanner TPeebles hpA DATE 11/ { t) 98 11/ #L / 96 11/lh1RIN RIlf I 96 11 / / 96 11 / / 96 COPY? YES (N0) YES [00) l YES [NO ) [YEM NO YES NO YES NO OFFIGLAL REGORD GOFY DOCUMENT NAME: @\ HAT \120 DAY.MEE

List of Reference Materials l

1. Materials used by the facility licensee to ensure operator competency:
a. The following types of materials used to train applicants for initial RO and SRO _

licensing should be provided. The material should be complete, comprehensive, and of sufficient detail to support the development of accurate and valid examinations without being redundant.

leaming objectives, student handouts, and lesson plans  !

system descriptions of all operationally relevant flow paths, components, ,

controis, and instrumentation ,

material used to clarify and strengthen understanding of normal, abnormal,  !

and emergency operating procedures i complete, operationally useful descriptions of all safety system interactions and, where available, balance-of-plant system interactions under  ;

emergency and abnormal conditions, including consequences of anticipated operator errors, maintenance errors, and equipment failures I

b. Questions and answers specific to the facility training program that may be used l

in the written examinations or operating tests (voluntary by facility licensee). >

c. Copies of facility-generated simulator scenarios that expose the applicants to  !

abnormal and emergency conditions, including degraded pressure control, degraded heat removal capability, and containment challenges, during all modes  :

of operation, including low power conditions. A description of the scenarios used  ;

for the training class may also be provided (voluntary by facility licensee). -.

d. All job performance measures (JPMs) used to ascertain the competence of the operators in performing tasks within the control room complex and outside the l control room (i.e., local operations) as identified in the facility JTA. J15Ms should i evaluate operator responsibilities during normal, abnormal,' and emergency I conditions and events and during all modes of operation, including cold shutdown, low, and full power.
2. Complete index of procedures (including all categories sent).

3.- All administrative procedures applicable to reactor operation or safety.

4. Allintegrated plant procedures (normal or general operating procedures).
5. All emergency procedures (emergency instructions, abnormal or special procedures).
6. Standing orders (important orders that are safety-related and may modify the regular procedures).

Enclosure

- . . _ . . . . - . - . - . . . . _- -- - .- . ._ - -. - .. ~. - - .. - , - . - . ,

l 1 i i

. 4

, List of Reference Material 2 t i

'7. Surveillance procedures that are run frequently (i.e., weekly) or that can be run on the l simulator.

s'

8. Fuel handling and core loading procedures (if SRO applicants w... 3 examined). I 4

[i 9. All annunciator and alarm procedures.

1

10. Radiation protection manual (radiation control manual or procedures.  !
11. Emergency plan implementing procedures. l
12. Technical Specifications (and interpretations, if available) for all units for which licenses f are sought. (if merits Tech Specs, include all removed programs such as ODCM, etc.)

l 2 .

13. System operating procedures.  !

j 14. Technical data book, and plant curve information as used by operators, and facility  ;

precautions, limitations, and set points document.

1 4 1

, 15. The following information pertaining to the simulation facility: l y .

a. 1.ist of all initial conditions.

i i b.- List of all malfunctions with identification numbers.

c. Malfunction cause and effect information and a concise description of the
l expected result or range of results that will occur upon initiation, including an j

! indication of which annunciators will be actuated.

ll.

j d. A description of the simulator's failure capabilities for valves, breakers, indicators, j and alarms.

s e, The range of severity of each variable malfunction (e.g., the size of a reactor-i coolant or steam leak or the rate of a component failure such as a feed pump, j

turbine generator, or major valve).  !

I f. A list of modeling conditions (e.g., simplifications, assumptions, and limits) and '

l problems that may affect the examination.  ;

4 j- g. A list of any known performance test discrepancies not yet corrected. j i

h. A list of differences between the simulator and the reference plant's control room. i Simulator instructors' manual.

l.

16. - Any additional plant-specific material that has been requested by the examiners to  !

develop examinations that meet the guidelines of these Standards and the regulations. ]

Enclosure l

1