Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20134P9801996-11-26026 November 1996 Summary of 961023 Meeting W/Util to Discuss Construction Permit Termination.List of Attendees & Agenda Encl ML20247C4281989-05-17017 May 1989 Summary of 890111 Meeting W/Util in Rockville,Md Re Geoscience Program for Facility.Attendance List & Slide Presentation Encl ML20235P6361989-02-14014 February 1989 Summary of 890112 Meeting W/Util,Ebasco Svcs,Inc & Impell Corp in Rockville.Md Re Safe Shutdown Impoundment Deconvolution Analysis Issue for Plant.Attendees List & Viewgraphs Encl ML20151Z8611988-04-27027 April 1988 Summary of 880405 Meeting W/Util in Rockville,Md Re Geoscience Issues for Plant.Viewgraphs & Attendance List Encl ML20149E0521988-01-20020 January 1988 Summary of 871215 Meeting W/Util in Bethesda,Md Re Soil Structure Interaction/Deconvolution Analysis.List of Attendees & Viewgraphs Encl ML20236N3741987-08-0303 August 1987 Summary of 870708 Meeting W/Util in Bethesda,Md to Hear & Discuss Util Response to NRC Questions Q231.1,Q231.2,Q231.3, Q231.4,Q231.5 & Q231.7.List of Attendees & Viewgraphs Encl ML20203L8551986-08-25025 August 1986 Trip Rept of Plant Readiness Review Meeting in Walnut Creek, CA on 860801.Attendance List Encl ML20154D1881986-02-26026 February 1986 Summary of 860213 Meeting W/Util in Bethesda,Md Re Status/ Progress Rept on Engineering Assurance Program (Design Review).Presentation Included Difficulties in Establishing Documentation Data Base for Plant.Viewgraphs Encl ML20209F9831985-07-17017 July 1985 Trip Rept of 850701-02 Visit to Facility to Familiarize NRC W/Plant,Status & Methods Being Used to Preserve Equipment.Meeting Agenda & Viewgraphs Encl ML20128M1931985-05-16016 May 1985 Summary of 850430 Meeting W/Util Re Design Readiness Review Program Proposed for Implementation Beginning Jul 1985 & Jul 1986 for Units 3 & 1,respectively.Meeting Attendees list,near-term Activities List & Schedule Encl ML20098D1991982-04-23023 April 1982 Summary of 820423 Special Meeting of WPPSS Executive Board in Richland,Wa Re Financial Problems W/Continued Const of Facilities.Notices of Adjournment Encl ML20098D1371982-04-23023 April 1982 Summary of 820423,28 & 29 Regular Meetings of WPPSS Board of Directors in Richland,Wa Re Units 4 & 5 Termination Program, Claim Vouchers & BPA Finance Proposal.Notice of Adjournment for 820423 Meeting Encl ML20098D1121982-04-0505 April 1982 Summary of 820405 Special Meeting of WPPSS Executive Board in Richland,Wa Re Status of Projects,Selection of Cost Effectiveness Study Consultant,Bpa Draft Power Load Forecast & Units 4 & 5 Termination Program ML20210S5771978-03-16016 March 1978 Trip Rept of 780309 Site Visit to Inspect Faults Uncovered in Unit 3 Excavation Site.Site Originally Inspected for Faults on 771026.Description of Inspected Areas Provided. Further Mapping of Trenches Forthcoming.W/O Stated Encls ML20214G8141977-11-22022 November 1977 Summary of 771116-17 Meetings W/Washington Energy Facility Site Evaluation Council in Richland,Wa Re Status of Plant & Impact of Aid to Mitigate Socioeconomic Impacts Resulting from Plant Const ML20210S5081977-11-16016 November 1977 Summary of 771108 Meeting W/Util & Legal Consultant to Review Status of Cps.Info Re 771103 Site Visit & Insp of Unit 3 Excavation Site Faults Provided.Lists of Key Milestone Dates & Meeting Attendees Encl ML20210S4901977-11-0303 November 1977 Trip Rept of 771026 Site Visit & Insp of Faults Discovered in Unit 3 Excavation Site.Faults 1-3 & 2 Considered Incapable.Decision on Capability Reserved Until Addl Info Received & Site Inspected Again ML20210S6241977-09-28028 September 1977 Summary of 770915 Meeting W/Wppss & Ebasco to Discuss Draft Responses to NRC 770629 Request for Addl Info Re Fire Protection Program ML20210S8531976-03-16016 March 1976 Summary of ACRS 760304 Meeting to Consider CP Application. Seismic Concerns & Exclusion Area Control Discussed.Agenda Encl ML20210S8631976-03-16016 March 1976 Summary of ACRS Subcommittee 760224 Meeting in Richland,Wa, to Discuss CP Application.Attendance List Encl ML20210T1491975-11-19019 November 1975 Summary of 751022-23 Meetings W/Util & Ebasco in Bethesda,Md to Discuss Util 751002 Proposed Design Changes.List of Attendees & Info Re Cost Reduction Program Encl ML20210T1571975-11-0707 November 1975 Summary of 751002 Meeting W/Util,Ebasco & C-E in Bethesda,Md Re Outstanding Items in NRC Review of CP Application.List of Attendees Encl ML20210T1641975-10-17017 October 1975 Summary of 751001 Meeting w/util,EBASCO,C-E,Conner & Knotts & Woodward-Clyde in Bethesda,Md Re Util Proposed Design Changes to Reduce Costs.Agenda & List of Attendees Encl ML20210T2351975-09-0202 September 1975 Summary of 750804 Site Visit & ACRS Subcommittee Meeting W/Util,Ebasco & Woodward-Clyde Assoc Re CP Application. Agenda & List of Attendees Encl ML20210S8831975-07-0303 July 1975 Summary of 750612 Meeting W/Util & Ebasco in Bethesda,Md Re Proposed Groundwater Drainage Sys Design & LOCA Dose Calculations.Staff Concern Re Failure of Tank Containing Radioactive Liquid Expressed.Attendee List Encl ML20210S9541975-06-0606 June 1975 Summary of 750506 Meeting W/Ebasco Re Tornado Missile Protection Approaches for Plants.Attendance List Encl ML20198G4481975-05-14014 May 1975 Summmary of 750225 Meeting W/Wppss,Ebasco & C-E in Bethesda, MD to Discuss Proposed Rev to Design of Ultimate Heat Sink ML20210T4171975-03-14014 March 1975 Summary of 750225 Meeting W/Util & C-E in Bethesda,Md Re Proposed Rev to Design of UHS for Facility.List of Attendees & Documentation Encl ML20198G4551975-03-13013 March 1975 Summary of 750225 Meeting W/Wppss & Ebasco in Bethesda,Md, to Discuss Groundwater Drainage Sys ML20210T3051975-01-24024 January 1975 Summary of 750109 Meeting W/Util & Ebasco in Bethesda,Md Re Response to NRC Request for Addl Info.List of Attendees & Agenda Encl ML20198G5621975-01-24024 January 1975 Summary of 750109 Meeting W/Wppss & Ebasco in Bethesda,Md to Discuss Responses to NRC Requests for Addl Info. Attendance List & Agenda Encl ML20198G5801975-01-21021 January 1975 Summmary of 741220 Meeting W/Wppss,Ebasco & Woodward-Clyde in Bethesda,Md to Discuss Landslides & Slope Stability ML20210T0581974-12-12012 December 1974 Summary of 741119 Meeting W/State of Wa Geological Survey & Dept of Highways in Olympia,Wa Re Slope Stability & Existing Landslides in Area Near Proposed Facility Site.List of Attendees Encl ML20198F0801974-11-24024 November 1974 Summary of 741114 Meeting W/Potential Intervenor DF Finn in San Francisco,Ca to Discuss Issues of Mutual Interest Re CP Applications ML20210T0121974-11-11011 November 1974 Summary of 741104 Meeting W/Util,Ebasco & C-E in Bethesda,Md Re NRC Position on Auxiliary Feedwater Sys Design.List of Attendees Encl ML20210T0081974-11-11011 November 1974 Summary of 741024 Meeting W/Util,Ebasco & Woodward-Lundgren in Bethesda,Md Re Slope Stability & Landslides in Site Area. List of Attendees & Diagrams Encl ML20198G6631974-11-11011 November 1974 Summary of 741029 Meeting W/Wpps,Ebasco & Woodward-Lundgren in Bethesda,Md,To Discuss Slope Stability & Landslides ML20198G7381974-10-17017 October 1974 Trip Rept of 740916 Visit to Plant Site to Inspect Meteorological Program ML20210S9751974-10-17017 October 1974 Trip Rept of 740916 Site Visit to Inspect Meteorological Program & to Discuss Items of Concern ML20198G7871974-10-0202 October 1974 Rept of 740946-17 Visit to Plant Site to Discuss Site Safety.Addl Documentation Encl ML20198G8331974-09-30030 September 1974 Summary of 740917 Meeting W/State of Wa in Olympia,Wa to Discuss Earthquakes & Faulting in Lower Puget Sound Region. Attendance List Encl ML20198G7231974-09-30030 September 1974 Trip Rept of 740916 Visit to Site to Discuss Questions Re Seismology,Hydrology,Meteorology,Radiological Assessment & Accident Analysis ML20198G8151974-09-30030 September 1974 Summary of 740920 Meeting w/WPPSS,C-E & Ebasco to Discuss first-round Questions Re QA Mechanical Engineering & Effluent Auxiliary Power & Conversion & Containment Sys ML20210T3431974-09-30030 September 1974 Summary of 740920 Meeting W/Util,Ebasco & C-E to Discuss Draft First Round Questions Re QA Mechanical Engineering & Effluent,Auxiliary & Power Conversion & Containment Sys. Attendance List & Agenda Encl ML20210T3381974-09-30030 September 1974 Summary of 740917 Meeting W/State of Wa Dept of Natural Resuouces,Earth Sciences Div in Olympia,Wa to Discuss Earthquakes & Faulting in Lower Puget Sound Region of State. Attendance List Encl ML20198G7601974-09-27027 September 1974 Rept of 740916 Visit to Plant Site to Discuss Hydrologic Concerns ML20210T1141974-09-24024 September 1974 Trip Rept of 740903-05 Site Visit to Examine Site & Discuss Questions Re Geology.Agenda & Attendance List Encl 1996-11-26
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20134P9801996-11-26026 November 1996 Summary of 961023 Meeting W/Util to Discuss Construction Permit Termination.List of Attendees & Agenda Encl ML20247C4281989-05-17017 May 1989 Summary of 890111 Meeting W/Util in Rockville,Md Re Geoscience Program for Facility.Attendance List & Slide Presentation Encl ML20235P6361989-02-14014 February 1989 Summary of 890112 Meeting W/Util,Ebasco Svcs,Inc & Impell Corp in Rockville.Md Re Safe Shutdown Impoundment Deconvolution Analysis Issue for Plant.Attendees List & Viewgraphs Encl ML20151Z8611988-04-27027 April 1988 Summary of 880405 Meeting W/Util in Rockville,Md Re Geoscience Issues for Plant.Viewgraphs & Attendance List Encl ML20149E0521988-01-20020 January 1988 Summary of 871215 Meeting W/Util in Bethesda,Md Re Soil Structure Interaction/Deconvolution Analysis.List of Attendees & Viewgraphs Encl ML20236N3741987-08-0303 August 1987 Summary of 870708 Meeting W/Util in Bethesda,Md to Hear & Discuss Util Response to NRC Questions Q231.1,Q231.2,Q231.3, Q231.4,Q231.5 & Q231.7.List of Attendees & Viewgraphs Encl ML20154D1881986-02-26026 February 1986 Summary of 860213 Meeting W/Util in Bethesda,Md Re Status/ Progress Rept on Engineering Assurance Program (Design Review).Presentation Included Difficulties in Establishing Documentation Data Base for Plant.Viewgraphs Encl ML20128M1931985-05-16016 May 1985 Summary of 850430 Meeting W/Util Re Design Readiness Review Program Proposed for Implementation Beginning Jul 1985 & Jul 1986 for Units 3 & 1,respectively.Meeting Attendees list,near-term Activities List & Schedule Encl ML20214G8141977-11-22022 November 1977 Summary of 771116-17 Meetings W/Washington Energy Facility Site Evaluation Council in Richland,Wa Re Status of Plant & Impact of Aid to Mitigate Socioeconomic Impacts Resulting from Plant Const ML20210S5081977-11-16016 November 1977 Summary of 771108 Meeting W/Util & Legal Consultant to Review Status of Cps.Info Re 771103 Site Visit & Insp of Unit 3 Excavation Site Faults Provided.Lists of Key Milestone Dates & Meeting Attendees Encl ML20210S6241977-09-28028 September 1977 Summary of 770915 Meeting W/Wppss & Ebasco to Discuss Draft Responses to NRC 770629 Request for Addl Info Re Fire Protection Program ML20210S8531976-03-16016 March 1976 Summary of ACRS 760304 Meeting to Consider CP Application. Seismic Concerns & Exclusion Area Control Discussed.Agenda Encl ML20210S8631976-03-16016 March 1976 Summary of ACRS Subcommittee 760224 Meeting in Richland,Wa, to Discuss CP Application.Attendance List Encl ML20210T1491975-11-19019 November 1975 Summary of 751022-23 Meetings W/Util & Ebasco in Bethesda,Md to Discuss Util 751002 Proposed Design Changes.List of Attendees & Info Re Cost Reduction Program Encl ML20210T1571975-11-0707 November 1975 Summary of 751002 Meeting W/Util,Ebasco & C-E in Bethesda,Md Re Outstanding Items in NRC Review of CP Application.List of Attendees Encl ML20210T1641975-10-17017 October 1975 Summary of 751001 Meeting w/util,EBASCO,C-E,Conner & Knotts & Woodward-Clyde in Bethesda,Md Re Util Proposed Design Changes to Reduce Costs.Agenda & List of Attendees Encl ML20210T2351975-09-0202 September 1975 Summary of 750804 Site Visit & ACRS Subcommittee Meeting W/Util,Ebasco & Woodward-Clyde Assoc Re CP Application. Agenda & List of Attendees Encl ML20210S8831975-07-0303 July 1975 Summary of 750612 Meeting W/Util & Ebasco in Bethesda,Md Re Proposed Groundwater Drainage Sys Design & LOCA Dose Calculations.Staff Concern Re Failure of Tank Containing Radioactive Liquid Expressed.Attendee List Encl ML20210S9541975-06-0606 June 1975 Summary of 750506 Meeting W/Ebasco Re Tornado Missile Protection Approaches for Plants.Attendance List Encl ML20198G4481975-05-14014 May 1975 Summmary of 750225 Meeting W/Wppss,Ebasco & C-E in Bethesda, MD to Discuss Proposed Rev to Design of Ultimate Heat Sink ML20210T4171975-03-14014 March 1975 Summary of 750225 Meeting W/Util & C-E in Bethesda,Md Re Proposed Rev to Design of UHS for Facility.List of Attendees & Documentation Encl ML20198G4551975-03-13013 March 1975 Summary of 750225 Meeting W/Wppss & Ebasco in Bethesda,Md, to Discuss Groundwater Drainage Sys ML20210T3051975-01-24024 January 1975 Summary of 750109 Meeting W/Util & Ebasco in Bethesda,Md Re Response to NRC Request for Addl Info.List of Attendees & Agenda Encl ML20198G5621975-01-24024 January 1975 Summary of 750109 Meeting W/Wppss & Ebasco in Bethesda,Md to Discuss Responses to NRC Requests for Addl Info. Attendance List & Agenda Encl ML20198G5801975-01-21021 January 1975 Summmary of 741220 Meeting W/Wppss,Ebasco & Woodward-Clyde in Bethesda,Md to Discuss Landslides & Slope Stability ML20210T0581974-12-12012 December 1974 Summary of 741119 Meeting W/State of Wa Geological Survey & Dept of Highways in Olympia,Wa Re Slope Stability & Existing Landslides in Area Near Proposed Facility Site.List of Attendees Encl ML20198F0801974-11-24024 November 1974 Summary of 741114 Meeting W/Potential Intervenor DF Finn in San Francisco,Ca to Discuss Issues of Mutual Interest Re CP Applications ML20210T0121974-11-11011 November 1974 Summary of 741104 Meeting W/Util,Ebasco & C-E in Bethesda,Md Re NRC Position on Auxiliary Feedwater Sys Design.List of Attendees Encl ML20210T0081974-11-11011 November 1974 Summary of 741024 Meeting W/Util,Ebasco & Woodward-Lundgren in Bethesda,Md Re Slope Stability & Landslides in Site Area. List of Attendees & Diagrams Encl ML20198G6631974-11-11011 November 1974 Summary of 741029 Meeting W/Wpps,Ebasco & Woodward-Lundgren in Bethesda,Md,To Discuss Slope Stability & Landslides ML20210T3381974-09-30030 September 1974 Summary of 740917 Meeting W/State of Wa Dept of Natural Resuouces,Earth Sciences Div in Olympia,Wa to Discuss Earthquakes & Faulting in Lower Puget Sound Region of State. Attendance List Encl ML20210T3431974-09-30030 September 1974 Summary of 740920 Meeting W/Util,Ebasco & C-E to Discuss Draft First Round Questions Re QA Mechanical Engineering & Effluent,Auxiliary & Power Conversion & Containment Sys. Attendance List & Agenda Encl ML20198G8151974-09-30030 September 1974 Summary of 740920 Meeting w/WPPSS,C-E & Ebasco to Discuss first-round Questions Re QA Mechanical Engineering & Effluent Auxiliary Power & Conversion & Containment Sys ML20198G8331974-09-30030 September 1974 Summary of 740917 Meeting W/State of Wa in Olympia,Wa to Discuss Earthquakes & Faulting in Lower Puget Sound Region. Attendance List Encl 1996-11-26
[Table view] |
Text
-. - . . . . . . _ . . __- -- __ _-- -. -
, Go-Go?
p pk UNITED STATES j
2 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666-0001
,o
+9***** November 26, 1996 LICENSEE: Washington Public Power Supply System FACILITY: Washington Nuclear Plant Unit 3
SUBJECT:
SUt#tARY OF OCTOBER 23, 1996, MEETING TO DISCUSS WASHINGTON NUCLEAR PLANT UNIT 3 CONSTRUCTION PERMIT TERMINATION On October 23, 1996, the NRC staff met with personnel from the Washington Public Power Supply System (the Supply System), the Energy Facility Site 4
Evaluation Council (EFSEC), Grays Harbor Regional Planning, Grays Harbor Public Utility District (PUD), Bonneville Power Administration, and the Washington State Fish and Wildlife agency to discuss the Supply System's proposed termination of the Construction Permit (CP) for the Washington Nuclear Plant Unit 3 (WNP-3). The meeting was open to the public. No members
- of the public attended. A list of attendees is provided as Attachment 1. A j copy of the meeting agenda is provided as Attachment 2.
The Supply System has decided to terminate the CP of the partially completed, ;
and previously deferred, WNP-3 project at Satsop, Washington. Recent changes j to Washington State law have made it possible to transfer ownership of the WNP-3 and WNP-5 site to an interlocal agency formed by Grays Harbor County, l
the Port of Grays Harbor, and Grays Harbor PUD. This new agency will not complete the project as a nuclear power plant; rather they plan to adapt the site and certain structures for economic development purposes. The revised law also reassigns the existing regulatory authority for site restoration from the state (EFSEC) to the local government. The Supply System is in the process of selling certain of its assets (steam ge7erators, transformers, etc.) to offset costs of site restoration and subsequent transfer to the local entities.
i The NRC staff toured the site and examined site improvements, buildings and !
structures including roads, runoff collection system, the settling basin and i equalization pond, parking lots and outside storage areas, warehouses, office i and administration buildings, utility and storage buildings, hyperbolic cooling towers, dry cooling towers, Ranney wells, the turbine building, the auxiliary building, and the reactor containment building. The NRC staff was not able to examine the discharge structure or the barge slip because of inclement weather, time constraints, and the relative inaccessibility of these structures. ;
! l t i 9:a o 29003a NRC FR.E CENTER COPY 9612020027 961126 PDR ADOCK 05000508 A PDR
l After the tour, personnel from the Supply System, EFSEC, and the Grays Harbor entities described the process for transfer of the site and summarized the activities that support it. At this time, the Grays Harbor entities are unsure of the ultimate uses of the site. Therefore, structures with a lengthy service life that pose no hazard to personnel on the site may be preserved in hopes of finding an ultimate use. In addition, the site has received a license from EFSEC to permit installation and operation of twin 250 Megawatt 4
combustion turbines. A number of existing site structures and systems will be used to support the operation of the combustion turbines. It will be about six months before decisions are. made as to which systems and structures will )
be left intact and which will be demolished prior to transfer. After these decisions are made, the Supply System will transmit to the NRC staff this 4 information so that the staff may continue its review of the proposed j termination of the Permit. j The NRC staff described its regulatory interest and the actions that it will take prior to authorizing the proposed licensing actions. As summarized in ;
i its September 5,1996, response to the Motion for Withdrawal of Application by the Supply System, the NRC staff will follow the precedures established for j Consumers Power Company's Midland plant. The NRC staff will conduct a site '
- inspection, including both the WNP-3 and WNP-5 units, and will prepare an environmental assessment as required by 10 CFR 51.21, " Criteria for the
~i identification of licensing and regulatory actions requiring environmental assessments." The NRC staff will assure compliance with all appropriate ,
safety and environmental requirements prior to authorization of Construction I Permit termination. ]
s
[e c ~
l Marvin M. Mendonca, Senior Project Manager Non-Power Reactors and Decommissioning ,
Project Directorate i Division of Reactor Program Management )
Office of Nuclear Reactor Regulation Docket No. 50-508 Attachments:
- 1. List of Attendees ,
- 2. Meeting Agenda cc w/ attachments: See next page
~ - - - . - . - - - - . . . .- - - - -- - - . . - . - - - . . . .
1 November 26, 1996 4 After the tour, personnel from the Supply System, EFSEC, and the Grays Harbor 1 entities described the process for transfer of the site and summarized the
! . activities that support it. At this time, the Grays Harbor entities are
- unsure of the ultimate uses of the site. Therefore, structures with a leagthy ,
- service life that pose no hazard to personnel on the site may be preservad in hopes of-finding an ultimate use. -In addition, the site has received 7.
- license from EFSEC to permit installation' and operation of twin 250 Megawatt combustion turbines. A number of existing site structures and systems.will be used to support the operation of the combustion turbines. It will be about
- six months before decisions are made as to which systems and structures will 4
be left intact and which will be demolished prior to transfer. After these 3 decisions are made, the Supply System will transmit.to the NRC staff this
- information so that the staff may continue its review of the proposed termination of the Permit.
i .The NRC' staff described its regulatory interest and the actions that it will j take prior to authorizing the proposed licensing actions. As summarized in i its September 5,1996, response to the Motion for Withdrawal of Application by
- the Supply System, the NRC staff will follow the precedures established for i Consumers Power Company's Midland plant. The NRC staff will conduct a site
- inspection, including both the WNP-3 and WNP-5 units, and will prepare an environmental assessment as required by 10 CFR 51.21, " Criteria for the
! identification of licensing and regulatory actions. requiring environmental i
' assestments." The NRC staff will. assure compliance with all appropriate safety and environmental requirements prior to authorization of Construction 1 Permit termination.
{ Original signed by:
1 Marvin M. Mendonca, Senior Project Manager
- Non-Power Reactors and Decommissioning i Project Directorate j Division.of Reactor Program Management j Office of Nuclear Reactor Regulation l Docket No.'50-508 Attachments
- 1. List of Attendees
- 2. Meeting Agenda t
cc w/ attachments: See next page j DISTRIBUTION: See next page 1
DOCUMENT NAME: G:\SECY\MENDONCA\MEETSUMB.MMM *SEE PREVIOUS CONCUR 4 WCE OFC PDND:PM M PDND:l/ , OGC* PDND:P!b b o PGEM
! NAME MMendonca EMn AHodgdon SWeiss W DMathews j DATE 11/f(/96 11/ /7/96 11/14/96 1141-/96 11/3(y96 0FFI;IAL RECORD COPY i
9
)
DISTRIBUTION:
Docket File 50-508 PUBLIC JHWilson TMartin 0GC PGEB r/f JMoore DKunihiro JCallan RIV DMatthews SWeiss MMendonca KPerkins FMiraglia/AThadani AHodgdon EJordan EHylton TMartin RZimmerman PDND r/f DOCUMENT NAME: G:\SECY\MENDONCA\MEETSUMB.MMM l
0
i
- DISTRIBUTION
- ,
- Docket File 50-508 PUBLIC JHWilson TMartin 0GC i e
PGEB r/f JMoore DKunihiro JCallan RIV I
DMatthews SWeiss Mendonca KPerkins FMiraglia/AThadani AHodgdon EJordan EHylton TMartin RZimmerman PDNO r/f ,
l DOCUMENT NAME: G:\SECY\MENDONCA\MEETSUMB.MMM i l i l l
)
4 i
i l i
t 1 l 3
i i
l I
4 i
i 1
4 4
i i
)
i 5
l i l
i 6
. . -. .- -- ~ - . -. .- - . . . -
d
- - l Attachment 1 LIST OF ATTENDEES AT MEETING WITH THE SUPPLY SYSTEM AND EFSEC ON OCTOBER 23, 1996 i
NAME AFFILIATION A. Hodgdon NRC
- D. Kunihiro NRC J. H. Wilson NRC D. Swank The Supply System i D. Coleman The Supply System D. Repka The Supply System 3
D. Fraley The Supply System W. Kiel The Supply System
! C. Butros The Supply System L. Schinnell The Supply System
! N. Kierulff Bonneville Power E. Brost Bonneville Power J. Zeller EFSEC M. Mills EFSEC T. Casey Grays Harbor PUD W. Banks Grays Harber Regional Planning C. Leigh Washington Tish ?nd Wildlife
. _ . _ . m ._ __ . _. . __ _ ._ _ _ _ . _
Attachment 2
' MEETING AGENDA Public Meeting Between NRC Staff, :
4 Washington Public Power Supply System and 1 State and Local Government Agencies l l
October 23, 1996 9:00 a.m. - 5:00 p.m.
WNP-3 Site Construction Office Building 471 Lambert Rd.
Elma, WA 98541 4
9:00 Introduction All l l
9:15 Plant and Site Tour All 4
11:30 Lunch All 12:30 Discussion of Construction Permit and Operating License NRC Application termination process and NRC role.
1:00 Discussion of proposed action The Supply System Changes to State law Transition to Grays Harbor entities 4 2:00 Site Restoration plans and responsibilities The 4 Supply System 3:00 Questions and comments by EFSEC/ State Agencies EFSEC 4:00 Open Discussion All 5:00 Adjourn All
1 Mr. W. G. Counsil WPPSS Nuclear Project No. 3 l Washington Public Power Supply System (WNP-3) Docket No. 50-508 l
\
i cc. j lir. Paul R. Bemis Director of Regulatory
& Industry Affairs Washington Public Power 1 Supply System l Mail Drop PE20 l P.O. Box 968 '
. Richland, Washington 99352 Mr. G. E. C. Doupe', Esq.
Washington Public Power Supply System j i Mail Drop 396 l
P. O. Box 968 Richland. Washington 99352-0968 i Mr. Frederick S. Adair, Chairman Energy Facility Site Evaluation !
Council State of Washington-1 P. O. Box 43172 !
Olympia, Washington 98504-3172 l Mr. Eugene Rosolie 4 Coalition for Safe Power -
Northwest Environmental Advocates 133 South West 2nd, Suite 302 Portland, Oregon 97204 Regional Administrator Region IV U.S. Nuclear Regulatory ;
Commission i
611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064
- " Mr. Douglas Coleman, Washington Public Power Supply
, System
' Mail Drop PE20 ,
, P. O. Box 968 Richland, Washington 99352 4