0 Docket No. 50-346 EDISON
"'A License No. NPF-3 Serial No. 1-567 August 23, 1985 Mr. James G. Keppler Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. Keppler:
Toledo Edison has been submitting the Safety-Related Piping System Support and Hanger Discrepancies Summary Report for the Davis-Besse Nuclear Power Station Unit No. 1 on a weekly basis to your office. These discrepancies have been identified by Toledo Edison as a result of either walkdowns conducted on the AFW Pump Turbine Steam Supply (AFPTSS) piping system following system actuation, torquing conducted under the AFPTSS piping system concrete expansion anchor bolt torque testing program, the Quality Control Baseline Inspection of the AFFTSS piping system hangers and supports, or inspections of the AFW piping supports in the AFW rooms.
No new discrepancies were identified on safety-related piping system hangers or supports from August 13, 1985 to August 20, 1985. Accordingly, there are no revisions to the last summary report submitted to Region 11I in Toledo Edison letter Serial No. 1-564, dated August 16, 1985.
Very truly yours, W ss y
\\
4 J'd:DRW:lah cc: DB-1 NRC Resident Inspector D. Danielson, NRC Region III I. N. Jackiv, NRC Region III 8509090072 850823 PDR ADOCK 05000346 P
PDR THE TOLEDO EDISON COMPANY EOiSON PLAZA 300 MADi3ON AVENUE TOLEDO. OHIO 43652 0
\\
-L 2O/
,