ML20134P857
| ML20134P857 | |
| Person / Time | |
|---|---|
| Site: | Monticello, Dresden, Perry, Fermi, Duane Arnold, Clinton, Quad Cities, Big Rock Point, LaSalle File:Consumers Energy icon.png |
| Issue date: | 11/26/1996 |
| From: | Leach M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bogue M, Chernick A, Eberhardt R, Holbrook R, Palchak J, Rausch T, Sawatzke B, Wallace B, Keith Young CLEVELAND ELECTRIC ILLUMINATING CO., COMMONWEALTH EDISON CO., CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), DETROIT EDISON CO., IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT, ILLINOIS POWER CO., NORTHERN STATES POWER CO. |
| References | |
| NUDOCS 9611290339 | |
| Download: ML20134P857 (2) | |
Text
- -
0 J
Multiole Addrasses - Letter Dated:
Novembce 26. 1996 Region III BWR Facility Training Managers as Listed Below Identical letters sent to:
E. A. Bogue, Big Rock Point, Docket No. 50-155 J. F. Palchak, Clinton, Docket No. 50-461 R. S. Holbrook, Dresden, Docket Nos. 50-237; 50-249
-K. D. Young, Duane Arnold, Docket No. 50-331 R. R. Eberhardt, Fermi, Docket No. 50-341 l
sB. J. Wallace, LaSalle, Docket Nos. 50-373; 50-374 i
B. J. Sawatzke, Monticello, Docket No. 50-263 T. S. Rausch, Perry, Docket No. 50-440 A. J. Chernick, Quad Cities, Docket Nos. 50 254; 50-265 On November 5,1996, we sent you a copy of the BWR Generic Fundamentals Examination and answer key for the BWR GFE adreinistered on October 9, 1996.
There has been a revision to the final answer key.
Item 82 (form A) has been deleted because the capability for answering the question generally would require operator knowledge beyond that expected of a GFE applicant.
Therefore, enclosed is an updated answer key to replace the answer key we 1
submitted to you on November 5, 1996.
Sincerely, Original signed by:
Melvyn N. Leach, Chief Operator Licensing Branch
Enclosure:
Updated BWR Answer Key For the October 1996 BWR GFE bec w/ enclosure:
G. Usova, NRR/HOLB PUBLIC-IE42
\\
\\
DOCUMENT NAME:
P:\\GFE.00R To receive a copy of this document, indicate in the box "C" = Copy w/o attach / encl "E" = Copy with attach /enci "N" = No copy 0FFICE RIII:DRS l6 RIII:DRS lv NAME MABies:mab etV MNLeach Ad DATE 11/26/96 11/26/96 0FFICIAL RECORD COPY 961129b339 961126 PDR ADOCK 05000155 V
PDR a
~-..
- ,,NOy-25-OG 14s17 FROM SONALYSTS INC. WATERFORD ids PAGE~
.,2 1
- FINAL ANSWER KEY ***
OCTOBER 1996 GENERIC FUNDAMENTALS EXAM BOILING WATER REACTOR - ANSWER KEY FORM ANS FORM ANS FORM ANS FORM ANS I
A B
A B
A B
A B
1 29 B
26 54 D
51 79 C
76 4
D 2
30 B
27 55 C
52 80 B
77.5 C
i 4
3 31 C
28 56 A
53 81 C
78 6
B 4
32 A
29 57 C
54 82 A
79 7
0 t
5 33 D
30 58 C
55 83 A
80 8
A 6
34 C
31 59 D
56 84 C
81 9
8 7
35 B
32 60 B
57 85 8
82 10 DELETED 8
36 8
33 61 C
58 86 D
83 11 B
9 37 A
34 62 D
59 87 D
84 12 A
10 38 D
35 63 C
60 88 D
85 13 D
11 39 C
36 64 D
61 89 C
86 14 A
12 40 B
37 65 C
62 90 D
87 15 A
13 41 D
38 66 D
63 91 B
88 16 B
14 42 A
39 67 A
64 92 A
89 17 A
15 43 8
40 68 C
65 93 0
90 18 D
16 44 B
41 69 A
66 94 D
91 19 A
17 45 B
42 70 A
67 95 B
92 20 0
18 46 D
43 71 B
68 96 C
93 21 C
19 47 A
44 72 A
69 97 C
94 22 C
20 48 A
45 73 C
70 98 D
95 23 A
- 21 49 D
46 74 A
71 99 A
96 24 B
22 50 D
47 75 D
72 100 B
97 25 A
23 51 C
48 '/6 C
73 1
0 98 26 A
24 52 B
49 77 A
74 2
8 99 27 B
25 53 C
50 78 8
75 3
A 100 28 B
_