Mr. C. Randy Hutchinson
_ November 25, 1996 Vice President, Operations ANO d
Entergy Operations, Inc.
1448 S._R. 333 Russellville, AR 72801
SUBJECT:
INSERVICE INSPECTION PROGRAM - REQUEST FOR ALTERNATE EXAMINATION ARKANSAS NUCLEAR ONE, UNIT 1 (ANO-1) STEAM GENERATOR N0ZZLE (TAC NO.
M95708) a Dear Mr. Hutchinsor -
.By letter dated June 12, 1996, Energy Operations, Inc. (E01) proposed an alternative examination for ANO-1 steam generators.
Specifically, E01 i
proposed to examine all of the Code _ category B-D nozzles on one of the steam generators rather than both steam generators.
l The NRC staff evaluated the Request for Relief No.96-001 to use a sampling i
philosophy and perform volumetric examination on the Class 1 nozzles and inner radius (IR) sections of only one steam generator in lieu of the Code l
requirement of volumetric examination of all Class 1 steam generator nozzles E
and nozzle IR sections.
The staff concluded that:
- 1) r,ursuant to 10 CFR.50.55a(a)(3)(1), the proposed alternative does r.ot provide an acceptable level of quality and safety; 2) pursuant to 10 CFR
}
50.55a(a)(3)(ii), the licensee has not provided a basis for undue hardship, based on the limited number and safety significance of the nozzles; and 3) 1-pursuant to 10 CFR 50.55a(g)(6)(1), the licensee has.not provided basis for impracticality.
Therefore, the licensee's Request for Relief No.96-001 is denied.
Enclosure contains the staff's evaluation and conclusions. is the Idaho National Engineering Laboratory Technical Letter Reort.
Sincerely, ORIGINAL SIGNED BY:
William D. Beckner, Director Project Directorate IV-1 Division of Reactor Projects III/IV 9611290320 961125 PDR ADOCK 05000313 0
PDR Docket No. 50-313
Enclosure:
Safety Evaluation cc w/ encl:
See next page
[
CHawes WBeckner J PUBLIC KSalehi -
JDyer, RIV fPD4-1r/f JMitchell ACRS JRoe OGC GBagchi EAdensam (EGA1)
- TMcLellan Document Name: AR195708195708LTR
- See previous concurrence 0FC (A)PM/PD4-1
~ (A)LA/PD4-1 DE/ECG*
BC/ECGB*
OGC*
D/PD4-1 N
NAME KSalehi:sp CHawes6rN TMcLellan GBagchi MYoung WBeckN DATE 11/0//96 11Qlc/96 11/05/96 11/05/96 11/19/96 y/gf/96 COPY YES/NO YES/N0 YES/N0 YES/N0 YES/NO YES/N0 2 fl00 <10 0FFICIAL RECORD COPY NRC RLE CEn\\TER
_m,_
m i
5 9 keg k
UNITED STATES p
g j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30086 4 001
\\,,g,,*/
November 25, 1996 Mr. C. Randy Hutchinson Vice President, Operations ANO Entergy Operations, Inc.
1448 S. R. 333 Russellville, AR 72801
SUBJECT:
INSERVICE INSPECTION PROGRAM - REQUEST FOR ALTERNATE EXAMINATION FOR ARKANSAS NUCLEAR ONE, UNIT 1 (ANO-1) STEAM GENERATOR N0ZZLE (TAC NO.
M95708)
Dear Mr. Hutchinson:
J By letter dated June 12, 1996, Energy Operations, Inc. (E01) proposed an alternative examination for ANO-1 steam generators.
Specifically, E01 proposed to examine. all of the Code category B-D nozzles on one of the steam generators rather than both steam generators.
The NRC staff evaluated the Request for Relief No.96-001 to use a sampling philosophy and perform volumetric examination on the Class 1 nozzles and inner radius (IR) sections of only one steam generator in lieu of the Code requirement of volumetric examination of all Class 1 steam generator nozzles and nozzle IR sections. The staff concluded that:
- 1) pursuant to 10 CFR 50.55a(a)(3)(i),.the proposed alternative does not provide an acceptable level of quality and safety; 2) pursuant to '10 CFR 50.55a(a)(3)(ii), the licensee has not provided a basis for undue hardship, based on the limited number and safety significance of the nozzles; and 3) pursuant to 10 CFR 50.55a(g)(6)(1), the licensee has not provided basis for 4
impracticality. Therefore, the licensee's Request for Relief No.96-001 is denied. Enclosure contains the-staff's evaluation and conclusions. is the Idaho National Engineering Laboratory Technical Letter Report.
Sincerely, Q
Ohh
^
William D. Beckner, Director Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-313
Enclosure:
Safety Evaluation cc.w/ encl: See next page
Mr. C. Randy Hutchinson Entergy Operations, Inc.
Arkansas Nuclear One, Unit I cc:
Executive Vice President Vice President, Operations Support j
& Chief Operating Officer Entergy Operations, Inc.
Entergy Operations, Inc.
P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-199 Wise, Carter, Child & Caraway Director, Division of Radiation P. O. Box 651 Control and Emergency Management Jackson, MS 39205 Arkansas Department of Health 4815 West Markham Street, Slot 30 i
Little Rock, AR 72205-3867 1
Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Manager, Rockville Nuclear Licensing Framatone Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Senior Resident Inspector U.S. Nuclear Regulatory Commission 4
P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801