ML20134P801

From kanterella
Jump to navigation Jump to search
Rev 1 to Advance Notification of Upcoming Shipment of Low Strategic Significance Matl from Countries Not Party to Convention on Physical Protection of Nuclear Matl
ML20134P801
Person / Time
Site: 07001426
Issue date: 01/23/1997
From: Mclaughlin J
TRANSNUCLEAR, INC.
To: Bennington G
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
96205-6, NUDOCS 9702260123
Download: ML20134P801 (2)


Text

.

01'-23.-97 03:43PM TRANSNUCLEAR I N C.

P01/**

O // W 7 4 TRANSNUCLEAR, INC.

-[

January 23,1997 Mrs. Gloria Bennington

/CRMI0 Division of Safeguards and Transportation O@wg4 U.S. Nuclear Regulatory Commission i

Washington, DC 20555 e:

Transnuclear reference %205 REVI rrival date at receiving facility)

~

Advance notification for an import shipment of nuclear material from countries that are not party to the Convention on the Physical Protection of Nuclear Material

Dear Mrs. Bennington:

This !ctter constitutes Transnuclear Inc.'s advance notification to the USNRC in compliance with the requirements as outlined in 10 CFR 73.74(a)(1)(2) for an import shipment of low strategic significance material from Countries that are not party to the Convention on the Physical Protection of Nuclear Material.

Details of inis shipment as required in 10 CFR 73.74(a)(1) are as follows:

73.74(a)(3)(i) Data:

Shinoinn Facility:

Receiving Facility:

COGEMA Pierrelatte Siemens Power Corporation 1

B.P.16 2101 IIorn Rapids Road 26700 Pierrelatte, France Richland, WA 99352-01320 33 7550 4000 509-375-8202 4

Transoort Coordinator:

CutinE Transnuclear, Inc.

Atlantic Container Lines 4 Skyline Drive 50 Cragwood Road Hawthorne, NY 10532 S. Plainfield, NJ 07080 914-347-2345 908-668-5556 Imnorter of Record:

AND COGEMA, Inc.

Advanced Distribution Systems 7401 Wisconsin Avenue S. 2329 Hayden Road Bethesda, MD 20814 Spokane, WA 99204 301-986-8585 1-800-756-0223 9702260123 970123 PDR ADOCK 07001426 1

C PDR I

FOUR SKYLINE DRIVE. HAWTHORNE, NEW YORK 10532 2176 TELEPHONE: 914 347 2345 FAX: 914 347 2346

l 01*-23-97 03:44PM TRANSNUCLEAR I N C.

P02/**

l O//9'7 7 a Page 2 of 2

,[

Revised letter TNY %2054 73.74(a)(3)(ii) Data: Physical description of shipment:

Three model 30B cylinders inside overpacks containing:

RQ, URANIUM HEXAFLUORIDE, FISSILE (containing more than 1% U235), 7, UN2977 Radioactive Material (U235,U238) solid, UF6. Approximate UF6 weight: 6,831 kgs. Approximate U weight: 4,620 kgs enriched to max. 5.0%.

Approximate weight U235: 228 kgs 73.74(a)(3)(iii)(iv)(v) Data:

MODE ORIGIN (0), TRANSFER (T),

ROUTE DATE/ TIME OF ARRIVAL COUNTRY /ENROUTE(C/E)&

(A) & DEPARTURE (D) AT DESTINATION (D) POINTS EACH POINT Rail Pierrelatte, FRANCE standard rail (D)

January 27,1997 0800 - 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> Ocean.

Antwerp, BEIAIUM standard ocean (A/D) January 28-29,1997 0800 - 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br /> Liverpool, ENGLAND (A/D) January 31,1997 0800 - 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br /> Halifax, CANADA (A/D) February 9,1997 0800 - 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br /> Port Elizabeth, NJ (A/D) February 11,1997 0800 - 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br /> Baltimore, MD (A/D) February 13, 1997 0800 - 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br /> Portsmouth, VA (A)

February 14, 1997 0800 - 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br /> Arrival at the receiving facility is estimated to be between uluu hours and 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> on February 24,1997.

This shipment will meet the levels of physical protection specified in Appendix E (Annex I).

Youn truly, Transnuclear, Inc.

d49(.s O

McLaughlin Traffic Coortlinator

-