ML20134P795
| ML20134P795 | |
| Person / Time | |
|---|---|
| Site: | 07001252 |
| Issue date: | 02/14/1997 |
| From: | Condrey D EDLOW INTERNATIONAL CO. |
| To: | Bennington G NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 9702260120 | |
| Download: ML20134P795 (1) | |
Text
mammh
'N 090 - o / 26R Edlow Intemational Company IMI) Connecticut Ave., N.W.. Suite 201 Washington, D.C. 20009 U.S. A.
s Tel (202) 48L4959 Fax (202) 48L4840 c-ntail edlowco@aol. corn February 14.1997 Division of Safeguards and Transportation U.S. Nuclear Regulatory Commission Mail Step: 0-6 F-18 Washington, D.C.
20555 Attn: Ms. Gloria M Bennington Dear Ms. Bennington-The following list of deliveries made between December 30 1996 and February 14,1997. This list provided in accordance with the requirement s of the Convention on the Physical Protection of Nuclear Materials.
OUR REF#
SHIPMENT DESCRIPTION CONSIGNEE DATE RECEIVED USEC-E-26A 39,780 Kgs UF6 (e)
U.S. Enrichment Corp.
1/17/97 ABB-E-15 1,445 Kgs UO2 (e)
ABB Combustion Eng.
1/24/97 GNSS-E-36 19,800 Kgs UF6 (e)
Lockhead Martin 1/28/97 ENU-E-28 8,700 Kgs UF6 (e)
BNFL Inter-1 Group 1/30/97 USEC-E-26H 26,750 Kgs UF6 (e)
U.S. Enrichment Corp.
2/06/97 GNSS-E-37 30,800 Kgs UF6 (e)
Westinghouse Electric 2/06/97 BN-OB-8 220,480.Lbs UF6 (n)
Urenco Nederland 2/07/97 NCS-E-18 19,691 Kgs UO2 (e)
General Electric 2/11/97 NUK-E-2 5,022 Kgs UF6 (e)
General Electric 2/13/97 We trust that the above information is satisfactory.
Sincerely, EDLOW INTERN I
AL COMPANY
/
Daren Condrey Operations Ma ager (e) = enriched (n) = natural 1
9 7 t. W 6 0 1 2 0 9 7 0 2 1 4 PDR ADOCK 07001252
}
0 C
PDR g
0 e