February 6,1997
Mr. D. R. Gipson
Senior Vice President
Nuclear Generation
The Detroit Edison Company
6400 North Dixie Highway
Newport, MI 48166
SUBJECT:
NRC INSPECTION REPORT NO. 50-341/96013 AND NOTICE OF VIOLATION
Dear Mr. Gipson:
On December 16,1996, the NRC completed an inspection at your Fermi 2 reactor facility.
The enclosed report presents the results of that inspection. During the inspection, the plant
operated safely.
,
Based on the results of this inspection, the NRC has determined that several violations of
NRC requirements occurred. These violations are cited in the enclosed Notice of Violation
(Notice) and the circumstences surrounding them are described in detail in the subject
inspection report. The violations are of concern because: 1) An internal baffle failure on
the Emergency Diesel Generator Number 12 muffler was improperly assigned a low
'
significance and corrective actions to repair the muffler were then delayed considerably
without reassessment. 2) A 10 CFR 50.E 9 Sefaty Evaluation of the Cycle 6 Core
,
Operating Limits Report failed to properly idert .y that a technical specification change was
4
necessary to ensure that mechanical fuel limits would be maintained during a rod
withdrawal error event. 3) An important safety function was not properly ratested due to
inadequate surveillance procedures following removal of an electricallead.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
,
\\
D
e
'
9702260003 970206
-
ADOCK 05000341
G
4
_
_ __
_
_.
_ _ . . _ _
. _ _ _ _ _ _
_ . _ _ _ . . _ _ . _ _ _ _ . _ . _ _ _ _ _ _
.
,
,
i
,
"
>
.
,
D. R. Gipson
-2-
'
t
i
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
i
and its enclosure (s), and your response will be placed in the NRC Public Document Room
a
(PDR).
~
,
Sincerely,
,
!
/s/ James L. Caldwell
James L. Caldwell, Director
Division of Reactor Projects
.
!
Docket Nos: 50-341
i
License Nos: NPF-43
Enclosures:
1. Inspection Report 50-341/g6013
cc w/ encl:
N. Peterson,
Supervisor of Compliance
P. A. Marquardt, Corporate
Legal Department
James R. Padgett, Michigan Public
a
i
i
Service Commission
Michigan Department of
j
Public Health
j
Monroe County, Emergency
Management Division
l
Docket File w/ encl
Project Manager, NRR w/enci
i
PUBLIC IE-01 w/ encl
DRP w/enci
OC/LFDCB w/ encl
Rill PRR w/enci
SRI Fermi w/ encl
CAA1 w/enci (E-mail)
,
A. B. Beach, w/ encl
Rill Enf Coordinator w/enci
s
W. L. Axelson, w/enci
,
Document: R:\\insprpts\\ powers \\ form \\fer96013.drp
1. -.
.
., ==i.
.
. .. . . 6
-c - c
.
..
f.-i
c - c
.i sm .si
mi.-i
n-
_
,
OFFICE
RIII
RIII
RIIIO/4
NAME
DuPont f W
Jordan Y
Grohaldwell
DATE
01/9/97
01/9/97
01/M/97
j
0FFICIAL RECORIl COPY
.
. - -
.
-
. . . ~ .
- . . - . . . .
, . . . - .
. - . ~ . . . .
_ . - ~ - _ ~ - --
,
,
g # *' % c
UNITED STATES
f,
g_
NUCLEAR REGULATORY COMMISSION
,
l
E
S
REGION lil
%-
i!
801 WARRENVILLE ROAD
'
%,
USLE. ILUNOIS 60532-4351
.....
February 6,1997
l
!
I
Mr. D. R. Gipson
l
Senior Vice President
l
Nuclear Generation
The Detroit Edison Company
-
6400 North Dixie Highway
,
l
Newport, MI 48166
SUBJECT:
NRC INSPECTION REPORT NO. 50-341/96013 AND NOTICE OF VIOLATION
,
Dear Mr. Gipson:
On December 16,1996, the NRC completed an inspection at your Fermi 2 reactor facility.
l
The enclosed report presents the results of that inspection. During the inspection, the plant
j
operated safely.
Based on the results of this inspection, the NRC has determined that several violations of
NRC requirements occurred. These violations are cited in the enclosed Notice of Violation
l
(Notice) and the circumstances surrounding them are described in detail in the subject
!
inspection report. The violations are of concern because: 1) An internal baffle failure on
[
the Emergency Diesel Generator Number 12 muffler was improperly assigned a low
significance and corrective actions to repair the muffler were then delayed considerably
without reassessment. 2) A 10 CFR 50.59 Safety Evaluation of the Cycle 6 Core
Operating Limits Report failed to properly identify that a technical specification change was
necessary to ensure that mechanical fuel limits would be maintained during a rod
withdrawal error event. 3) An important safety function was not properly retested due to
l
inadequate surveillance procedures following removal of an electricallead.
'
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
l
\\
!
!
{
f
,
,
_
._,
.
_ _ . . . _ _ _ _ _ _ _ _ _ _ - -
. _ .
.
_ . _ _ _
. . _ _ _
_ . . . _ . . _ _ _ _ _
- . . _ - . . _ _ _
-
.
.
.
.
D. R. Gipson
-2
!
r
(
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR).
l
l
Sincerely,
i
-
..
ames L. Caldhell, Director
'
ivision of Reactor Projects
Docket Nos: 50-341
i
License Nos: NPF-43
'
Enclosures:
.
1. Inspection Report 50-341/96013
!
cc w/ encl:
N. Peterson,
Supervisor of Compliance
i
P. A. Marquardt, Corporate
Legal Department
James R. Padgett, Michigan Public
i
Service Commission
Michigan Department of
Public Health
Monroe County, Emergency
l
Management Division
i
i
f
I