Forwards Insp Rept 50-341/96-13 on 961026-1216 & Notice of Violation
ML20134P498
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/06/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20134P501 List:
References
NUDOCS 9702260003
Download: ML20134P498 (4)


See also: IR 05000341/1996013

Text

- - _ . -

..

.

.-

-_--_.

.

-

. _ .

o

\\f

-

.

\\J

y

Y

l

February 6,1997

Mr. D. R. Gipson

Senior Vice President

Nuclear Generation

The Detroit Edison Company

6400 North Dixie Highway

Newport, MI 48166

SUBJECT:

NRC INSPECTION REPORT NO. 50-341/96013 AND NOTICE OF VIOLATION

Dear Mr. Gipson:

On December 16,1996, the NRC completed an inspection at your Fermi 2 reactor facility.

The enclosed report presents the results of that inspection. During the inspection, the plant

operated safely.

,

Based on the results of this inspection, the NRC has determined that several violations of

NRC requirements occurred. These violations are cited in the enclosed Notice of Violation

(Notice) and the circumstences surrounding them are described in detail in the subject

inspection report. The violations are of concern because: 1) An internal baffle failure on

the Emergency Diesel Generator Number 12 muffler was improperly assigned a low

'

significance and corrective actions to repair the muffler were then delayed considerably

without reassessment. 2) A 10 CFR 50.E 9 Sefaty Evaluation of the Cycle 6 Core

,

Operating Limits Report failed to properly idert .y that a technical specification change was

4

necessary to ensure that mechanical fuel limits would be maintained during a rod

withdrawal error event. 3) An important safety function was not properly ratested due to

inadequate surveillance procedures following removal of an electricallead.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

,

\\

D

e

'

9702260003 970206

-

PDR

ADOCK 05000341

G

PDR

4

_

_ __

_

_.

_ _ . . _ _

. _ _ _ _ _ _

_ . _ _ _ . . _ _ . _ _ _ _ . _ . _ _ _ _ _ _

.

,

,

i

,

"

>

.

,

D. R. Gipson

-2-

'

t

i

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

i

and its enclosure (s), and your response will be placed in the NRC Public Document Room

a

(PDR).

~

,

Sincerely,

,

!

/s/ James L. Caldwell

James L. Caldwell, Director

Division of Reactor Projects

.

!

Docket Nos: 50-341

i

License Nos: NPF-43

Enclosures:

1. Inspection Report 50-341/g6013

2. Notice of Violation

cc w/ encl:

N. Peterson,

Supervisor of Compliance

P. A. Marquardt, Corporate

Legal Department

James R. Padgett, Michigan Public

a

i

i

Service Commission

Michigan Department of

j

Public Health

j

Monroe County, Emergency

Management Division

l

Docket File w/ encl

Project Manager, NRR w/enci

i

PUBLIC IE-01 w/ encl

DRP w/enci

OC/LFDCB w/ encl

Rill PRR w/enci

SRI Fermi w/ encl

CAA1 w/enci (E-mail)

,

A. B. Beach, w/ encl

Rill Enf Coordinator w/enci

s

W. L. Axelson, w/enci

,

Document: R:\\insprpts\\ powers \\ form \\fer96013.drp

1. -.

.

., ==i.

.

. .. . . 6

-c - c

.

..

f.-i

c - c

.i sm .si

mi.-i

n-

_

,

OFFICE

RIII

RIII

RIIIO/4

NAME

DuPont f W

Jordan Y

Grohaldwell

DATE

01/9/97

01/9/97

01/M/97

j

0FFICIAL RECORIl COPY

.

. - -

.

-

. . . ~ .

- . . - . . . .

, . . . - .

. - . ~ . . . .

_ . - ~ - _ ~ - --

,

,

g # *' % c

UNITED STATES

f,

g_

NUCLEAR REGULATORY COMMISSION

,

l

E

S

REGION lil

%-

i!

801 WARRENVILLE ROAD

'

%,

USLE. ILUNOIS 60532-4351

.....

February 6,1997

l

!

I

Mr. D. R. Gipson

l

Senior Vice President

l

Nuclear Generation

The Detroit Edison Company

-

6400 North Dixie Highway

,

l

Newport, MI 48166

SUBJECT:

NRC INSPECTION REPORT NO. 50-341/96013 AND NOTICE OF VIOLATION

,

Dear Mr. Gipson:

On December 16,1996, the NRC completed an inspection at your Fermi 2 reactor facility.

l

The enclosed report presents the results of that inspection. During the inspection, the plant

j

operated safely.

Based on the results of this inspection, the NRC has determined that several violations of

NRC requirements occurred. These violations are cited in the enclosed Notice of Violation

l

(Notice) and the circumstances surrounding them are described in detail in the subject

!

inspection report. The violations are of concern because: 1) An internal baffle failure on

[

the Emergency Diesel Generator Number 12 muffler was improperly assigned a low

significance and corrective actions to repair the muffler were then delayed considerably

without reassessment. 2) A 10 CFR 50.59 Safety Evaluation of the Cycle 6 Core

Operating Limits Report failed to properly identify that a technical specification change was

necessary to ensure that mechanical fuel limits would be maintained during a rod

withdrawal error event. 3) An important safety function was not properly retested due to

l

inadequate surveillance procedures following removal of an electricallead.

'

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

l

\\

!

!

{

f

,

,

_

._,

.

_ _ . . . _ _ _ _ _ _ _ _ _ _ - -

. _ .

.

_ . _ _ _

. . _ _ _

_ . . . _ . . _ _ _ _ _

- . . _ - . . _ _ _

-

.

.

.

.

D. R. Gipson

-2

!

r

(

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure (s), and your response will be placed in the NRC Public Document Room

(PDR).

l

l

Sincerely,

i

-

..

ames L. Caldhell, Director

'

ivision of Reactor Projects

Docket Nos: 50-341

i

License Nos: NPF-43

'

Enclosures:

.

1. Inspection Report 50-341/96013

2. Notice of Violation

!

cc w/ encl:

N. Peterson,

Supervisor of Compliance

i

P. A. Marquardt, Corporate

Legal Department

James R. Padgett, Michigan Public

i

Service Commission

Michigan Department of

Public Health

Monroe County, Emergency

l

Management Division

i

i

f

I