|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217G9791999-10-14014 October 1999 Forwards SE Accepting Relief Requests to Rev 5 of First 10-year Interval Inservice Insp Program for Plant,Units 1 & 2 ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20217A9311999-09-29029 September 1999 Informs That NRC 6-month Review of Braidwood Identified That Performance in Maint Area Warranted Increased NRC Attention. Addl Insps Beyond Core Insp Program Will Be Conducted Over Next 6 Months to Better Understand Causes of Problem ML20216H4301999-09-23023 September 1999 Informs That Arrangements Made for Administration of Licensing re-take Exams at Braidwood Generating Station for Week of 991108 ML20216F7441999-09-17017 September 1999 Forwards Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824.Three Violations Noted & Being Treated as Ncvs. Insp Focused on C/As & Activities Addressing Technical Concerns Identified During Design Insp Completed on 980424 ML20212A6991999-09-10010 September 1999 Forwards SE Accepting Licensee Second 10-year Interval ISI Program Request for Relief 12R-07 for Plant,Units 1 & 2 ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211Q6611999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Braidwood Operator License Applicants During Wk of 010115 & 22.Validation of Exam Will Occur at Station During Wk of 001218 ML20211P1901999-09-0303 September 1999 Forwards Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20211P1761999-09-0202 September 1999 Discusses Licensee Aug 1998 Rev 3K to Portions of Braidwood Nuclear Power Station Generating Stations Emergency Plan Site Annex Submitted Under Provisions of 10CFR50.54(q). NRC Approval Not Required ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210U8031999-08-0404 August 1999 Forwards SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval for Second 10-year Inservice Testing Program BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K9761999-07-30030 July 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs, for Plant ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210G6291999-07-29029 July 1999 Forwards Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20210C3961999-07-20020 July 1999 Forwards Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Weakness Identified on 990523,when Station Supervisors Identified Individual Sleeping in Cable Tray in RCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl IR 05000456/19993011999-07-15015 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301OL & 50-457/99-301OL for Test Administered from 990607-11 to Applicants for Operating Licenses.Three Out of Four Applicants Passed Exams BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted ML20209H5141999-07-14014 July 1999 Discusses 990701 Telcon Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Braidwood Nuclear Generating Station for Week of 990927,which Coincides with Licensee Regularly Scheduled Exam Cycle ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196H0631999-06-28028 June 1999 Provides Individual Exam Results for Licensee Applicants Who Took June 1999 Initial License Exam.Without Encls ML20212H8241999-06-24024 June 1999 Informs That Effective 990531 NRC Project Mgt Responsibility for Byron & Braidwood Stations Was Transferred to Gf Dick ML20196D4591999-06-18018 June 1999 Forwards Insp Repts 50-456/99-07 & 50-457/99-07 on 990414- 0524.No Violations Noted.Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20196A6671999-06-17017 June 1999 Refers to 990609 Meeting with Util in Braidwood,Il Re Licensee Initiatives in Risk Area & to Establish Dialog Between SRAs & Licensee PRA Staff 05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below1999-06-16016 June 1999 Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below 05000456/LER-1998-004, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations1999-06-16016 June 1999 Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed1999-06-15015 June 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed ML20195J3741999-06-14014 June 1999 Forwards Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted.Sg Insp Program Found to Be Thorough & Conservative BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.51999-06-10010 June 1999 Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 ML20195F3231999-06-0909 June 1999 Informs That in ,Arrangements Finalized for Exam to Be Administered at Plant During Wk of 990607.All Parts of Plant Initial Licensed Operator Exam Approved for Administration 1999-09-08
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20246L7321989-03-17017 March 1989 Advises That 880407 Samples Mistakenly Discarded Before Analyses for naturally-occurring Radionuclides in Ra-226 & Ra-228 Series Performed.Analyses Results of Radioactivity Levels in Well Waters Encl ML20205S3841988-10-13013 October 1988 Partial Response to FOIA Request for Documents.App D,E & F Records Encl & Available in Pdr.App F Records Partially Withheld (Ref FOIA Exemption 6) ML20245D6581988-08-0404 August 1988 Discusses to Congressman Hastert Re Concern That Maint & Operations Employees of Listed Nuclear Power Plants in Vicinity of Seneca,Il Working Excessive Hrs ML20207D1121988-07-0505 July 1988 Partial Response to FOIA Request for Documents.Forwards App M Documents.App L Documents Maintained in Pdr.Apps N & O Documents Partially & Totally Withheld,Respectively (Ref FOIA Exemption 5) ML20235F8141987-09-24024 September 1987 Partial Response to FOIA Request for Documents.Forwards App B,C & D Documents.App a & B Available in Pdr.App C Documents Partially Withheld (Ref FOIA Exemption 4).App D Documents Withheld in Entirety (Ref FOIA Exemptions 5 & 6) ML20235Y6091987-07-21021 July 1987 Forwards Photocopy of Fr Notice That Incorporates DOJ 740304 Advice Ltr in Entirety,Per Request for DOJ Advice Ltrs Rendered in Conjunction W/Cp Antitrust Review of Plants ML20215L9751987-06-22022 June 1987 Responds to Appeal of Denial of FOIA Request for Document 10 in App C of 870309 Response.Forwards Document 10.Document Partially Withheld (Ref FOIA Exemption 7) ML20212M9591987-03-0909 March 1987 Final Response to FOIA Request.Forwards Document Listed in App B.Documents Listed in App a & B Available in Pdr.App C Documents Withheld (Ref FOIA Exemptions 5 & 7) ML20215E6501986-10-0707 October 1986 Further Response to FOIA Request for Records Re Insp Repts 50-456/85-21 & 50-457/85-22.Portions of Documents in App C & All Documents in App D Withheld (Ref FOIA Exemptions 5,6 & 7).App C Documents Also in PDR ML20203L1821986-08-19019 August 1986 Forwards Wd Shafer 860722 & 30 Ltrs to C Reed Re Review of Emergency Preparedness.W/O Encls.Related Correspondence ML20205A1181986-08-0404 August 1986 Forwards Listed Documents Responsive to Intervenor Harassment Contention.Documents Considered Confidential,Per 851206 Protective Order.W/O Encls ML20199F2661986-03-0404 March 1986 Partial Response to FOIA Request for Documents Re Insp Repts 50-456/85-21 & 50-457/85-22.Documents on App a Already Available in PDR & Documents on App B Being Placed in PDR ML20137U1661985-12-0202 December 1985 Forwards Second Supplemental Response to Intervenor Second Set of Interrogatories.Executed Affidavits of Ws Little Also Encl.Related Correspondence ML20138D2691985-11-15015 November 1985 Forwards Supplemental Response to Intervenor Second Set of Interrogatories.Affidavit of Ws Little Also Encl.Related Correspondence ML20215E6701985-11-0808 November 1985 Partially Withheld Ltr Ack Receipt of 850320 Info Re Lk Comstock Engineering Co at Plant.Insp Into Concerns Complete & Documented in Paragraph 2c of Encl Insp Rept.W/O Encl ML20136F7241985-11-0808 November 1985 Responds to FOIA Request for All Records Re Insp Repts 50-456/80-04 & 50-457/80-04.App C Documents Available in PDR ML20137N0321985-09-0606 September 1985 Final Response to FOIA Request for All Documents Re Insp Repts 50-456/83-09 & 50-457/83-09.Forwards Listed Documents. Documents Also Available in PDR ML20134P4601985-09-0505 September 1985 Further Response to FOIA Request for All Records Re Insp Repts 50-456/83-09 & 50-457/83-09.App C Documents Withheld (Ref FOIA Exemption 5).Review of Remaining Documents Incomplete ML20134C7341985-08-13013 August 1985 Forwards Chart of Site Exclusion Zone & Sections of Fes Addressing Site Groundwater & Fog,In Response to Comments Re Possible Fogging Associated W/Cooling Pond & Variations in Groundwater Quantity.W/O Encl.Related Correspondence ML20134C7671985-08-0707 August 1985 Forwards Fes in Response to Concerns Discussed at Recent Public Meeting in Joliet,Il Re Environ Impact of Facilities. Addl Info May Be Obtained at Lpdr in Wilmington,Il.W/O Encl. Related Correspondence ML20136G5981985-07-19019 July 1985 Partial Response to FOIA Request for Records Re Facility Insp Rept 83-09.App a Documents Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Search Continuing for Addl Documents ML20128K0611985-07-0808 July 1985 Advises That NRC Declines to Make Witnesses Available for Depositions on Matters Encompassed in Proposed Rorem QA Contention Part 2C,in Response to 850702 Request.Related Correspondence ML20215E6541985-04-11011 April 1985 Partially Withheld Ltr Ack Receipt of 850329 Info Re Lk Comstock Engineering Co.Util Requested to Immediately Investigate Concerns.Completion of Insps Expected within 90 Days ML20215E6521985-04-0808 April 1985 Partially Withheld Ltr Ack Receipt of 850329 Info Re Lk Comstock Engineering Co.Util Requested to Immediately Investigate Concerns.Completion of Insps Expected within 90 Days ML20215E6781985-04-0404 April 1985 Partially Withheld Ltr Ack Receipt of 850320 Info Re Lk Comstock Engineering Co Production Emphasis Base Metal Reduction & Inspector Qualifications at Facility.Completion of Insps Expected within Next 90 Days IA-85-777, Partially Withheld Ltr Ack Receipt of 850320 Info Re Lk Comstock Engineering Co Production Emphasis Base Metal Reduction & Inspector Qualifications at Facility.Completion of Insps Expected within Next 90 Days1985-04-0404 April 1985 Partially Withheld Ltr Ack Receipt of 850320 Info Re Lk Comstock Engineering Co Production Emphasis Base Metal Reduction & Inspector Qualifications at Facility.Completion of Insps Expected within Next 90 Days 1989-03-17
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G9791999-10-14014 October 1999 Forwards SE Accepting Relief Requests to Rev 5 of First 10-year Interval Inservice Insp Program for Plant,Units 1 & 2 ML20217A9311999-09-29029 September 1999 Informs That NRC 6-month Review of Braidwood Identified That Performance in Maint Area Warranted Increased NRC Attention. Addl Insps Beyond Core Insp Program Will Be Conducted Over Next 6 Months to Better Understand Causes of Problem ML20216H4301999-09-23023 September 1999 Informs That Arrangements Made for Administration of Licensing re-take Exams at Braidwood Generating Station for Week of 991108 ML20216F7441999-09-17017 September 1999 Forwards Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824.Three Violations Noted & Being Treated as Ncvs. Insp Focused on C/As & Activities Addressing Technical Concerns Identified During Design Insp Completed on 980424 ML20212A6991999-09-10010 September 1999 Forwards SE Accepting Licensee Second 10-year Interval ISI Program Request for Relief 12R-07 for Plant,Units 1 & 2 ML20211Q6611999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Braidwood Operator License Applicants During Wk of 010115 & 22.Validation of Exam Will Occur at Station During Wk of 001218 ML20211P1901999-09-0303 September 1999 Forwards Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211P1761999-09-0202 September 1999 Discusses Licensee Aug 1998 Rev 3K to Portions of Braidwood Nuclear Power Station Generating Stations Emergency Plan Site Annex Submitted Under Provisions of 10CFR50.54(q). NRC Approval Not Required ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20210U8031999-08-0404 August 1999 Forwards SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval for Second 10-year Inservice Testing Program ML20210K9761999-07-30030 July 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs, for Plant ML20210G6291999-07-29029 July 1999 Forwards Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210C3961999-07-20020 July 1999 Forwards Insp Repts 50-456/99-09 & 50-457/99-09 on 990517-0623.No Violations Noted.Weakness Identified on 990523,when Station Supervisors Identified Individual Sleeping in Cable Tray in RCA ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) IR 05000456/19993011999-07-15015 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301OL & 50-457/99-301OL for Test Administered from 990607-11 to Applicants for Operating Licenses.Three Out of Four Applicants Passed Exams ML20209H5141999-07-14014 July 1999 Discusses 990701 Telcon Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Braidwood Nuclear Generating Station for Week of 990927,which Coincides with Licensee Regularly Scheduled Exam Cycle ML20196H0631999-06-28028 June 1999 Provides Individual Exam Results for Licensee Applicants Who Took June 1999 Initial License Exam.Without Encls ML20212H8241999-06-24024 June 1999 Informs That Effective 990531 NRC Project Mgt Responsibility for Byron & Braidwood Stations Was Transferred to Gf Dick ML20196D4591999-06-18018 June 1999 Forwards Insp Repts 50-456/99-07 & 50-457/99-07 on 990414- 0524.No Violations Noted.Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20196A6671999-06-17017 June 1999 Refers to 990609 Meeting with Util in Braidwood,Il Re Licensee Initiatives in Risk Area & to Establish Dialog Between SRAs & Licensee PRA Staff ML20195J3741999-06-14014 June 1999 Forwards Insp Rept 50-457/99-08 on 990415-0518.No Violations Noted.Sg Insp Program Found to Be Thorough & Conservative ML20195F3231999-06-0909 June 1999 Informs That in ,Arrangements Finalized for Exam to Be Administered at Plant During Wk of 990607.All Parts of Plant Initial Licensed Operator Exam Approved for Administration ML20207B6361999-05-25025 May 1999 Forwards SE Accepting Revised SG Tube Rupture (SGTR) Analysis for Bryon & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20207A5891999-05-20020 May 1999 Forwards Insp Repts 50-456/99-05 & 50-457/99-05 on 990405-23.Two non-cited Violations Identified ML20206U4641999-05-18018 May 1999 Responds to Util 990517 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3.0.3. Documents 990516 Telcon with Licensee Re NOED ML20206N4791999-05-13013 May 1999 Forwards RAI Re 980529 Amend Request for Byron & Braidwood to Credit Automatic PORV Operation for Mitigation of Inadvertent SI at Power Accident.Response Requested 60 Days After Receipt Date ML20206Q5321999-05-11011 May 1999 Forwards Insp Repts 50-456/99-06 & 50-457/99-06 on 990302-0413.Configuration Control Error Resulted in Isolation of Unit 1 Emergency Boration Flow Path Through Designated Boric Acid Pump for Period of 3 H Occurred ML20206H8161999-05-0505 May 1999 Confirms Discussion Re Meeting to Be Conducted on 990527 at Braidwood Station Training Building.Meeting Will Discuss Braidwood Station Performance as Described in Most Recent Plant Performance Review ML20206E7021999-05-0303 May 1999 Advises That Info Contained in Document Entitled, Licensing Rept for Sf Rack Installation at Byron & Braidwood Stations, HI-982083,will Be Withheld from Public Disclosure Per 10CFR2.790 ML20205G9631999-03-26026 March 1999 Advises of Planned Insp Effort Resulting from Braidwood Plant Performance Review for Period 870830-990131.Historical Listing of Plant Issues & Details of NRC Insp Plan for Next 6 Months Encl ML20204J4241999-03-23023 March 1999 Forwards Insp Repts 50-456/99-04 & 50-457/99-04 on 990222-24 & 0303 Onsite & 0309 & 11 Region 3 Ofc.No Violations Noted. Implementation of Physical Security Plan Was Examined ML20204J9001999-03-23023 March 1999 Forwards Insp Repts 50-456/99-02 & 50-457/99-02 on 990120- 0301.No Violations Noted ML20204G2031999-03-22022 March 1999 Forwards Year 2000 Readiness Audit Rept Which Documents Results of NRR Audit Conducted at Facility from 990124-28 ML20204C7201999-03-16016 March 1999 Ack Receipt of Expressing Concern Over Sale of Certain Properties by Commonwealth Edison Co ML20204E3341999-03-16016 March 1999 Expresses Appreciation for Re Concerns Over Sale of Certain Properties by Licensee.No Regulatory Basis for NRC to Require Util to Rely on strip-mine Ponds as Suppl Source of Cooling Water ML20204E2801999-03-16016 March 1999 Ack Receipt of Rev 3M to Portions of Braidwood Nuclear Power Generating Station Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Ceco Determinations That Changes in Rev 3M Do Not Decrease Effectiveness of Plan ML20207J9741999-03-11011 March 1999 Discusses Rev 3,to Portions of Braidwood Power Station EP Site Annex.Based on Licensee Determinations That Changes Do Not Decrease Effectiveness of EP & Plan Continues to Meet Standards of 10CFR50.47(b),NRC Approval Not Required ML20203E9521999-02-11011 February 1999 Forwards Insp Rept 50-456/98-16 on 980916-990121.No Violations Were Identified.Insp Was Exam of Activities Re Engineering & Maint Activities for Replacement of Steam Generators for Compliance with Commission Regulations ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20203C9761999-02-0808 February 1999 Ack Receipt of ,Which Transmitted Changes Identified as Rev 44 to Security Plan.No NRC Approval Required ML20203A4601999-02-0505 February 1999 Ack Receipt of 981109 Evaluation of Indication in Base Metal of Braidwood Station,Unit 1,main Steam Piping Sys Elbow ML20203A3641999-02-0303 February 1999 Forwards Copy of FEMA Evaluation Rept for 980520 Emergency Preparedness Exercise at Braidwood.One Deficiency & Three Areas Requiring Corrective Action Identified.Deficiency Corrected During Remedial Exercise Held on 980806 ML20199E6561999-01-15015 January 1999 Discusses Unresolved Security Item Re Adequacy of Compensatory Measures Implemented for Section of Vehicle Barrier Sys.Issue Briefly Described as Listed ML20199E1351999-01-0808 January 1999 Forwards Revised Dates for Engineering & Technical Support Insp,Emergency Planning Insp,Security Insp & Operational Assessment Insp for Braidwood IR 05000456/19980141999-01-0505 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts on 50-456/98-14 & 50-457/98-14 Issued on 981117 ML20198R0741998-12-30030 December 1998 Forwards Insp Repts 50-456/98-20 & 50-457/98-20 on 981020-1207.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20197J6831998-12-10010 December 1998 Forwards Insp Repts 50-456/98-21 & 50-457/98-21 on 981110- 24.No Violations Noted.Insp Reviewed Corrective Actions for Previously Identified Issues ML20197H4261998-12-0404 December 1998 Forwards Insp Rept 50-456/98-18 on 981015-23 & 1109-10.No Violations Noted.Some Weaknesses Identified in Operator Performance & Training ML20197K1311998-12-0202 December 1998 Forwards Planned Insp Effort for Next 6 Months at Plant.Info Provided to Minimize Resource Impact on Staff & Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite 1999-09-06
[Table view] |
See also: IR 05000456/1983009
Text
-_ _ _ _ _ _ _ _ _ _ _
e
f[ *
n
UNITED STATES
NUCLEAR REGULATORY COMMISSION L
-
$ E W ASHING TON, D. C. 205%
o !
%...../ g / Lo
ggp 0 5
Ms. Billie P. Garde, Director
Citizen's Clinic
Government Accountability Project
1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER
Washington, DC 20036 TO F01A-85-452
Dear Ms. Garde:
This is in further response to your letter dated June 19, 1985, in which you
requested, pursuant to the Freedom of Information Act (F0IA), all records
related to Inspection Report 83-09 on the Braidwood plant.
The documents listed on the enclosed Appendix C contain predecisional advice,
opinions, and recomendations of the staff regarding NRC Region III inspection
and enforcement actions and are being withheld from public disclosure pursuant
to Exemption (5) of the FOIA (5 U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5) of the
Comission's regulations. The withheld documents do not contain any reasonably
segregable factual portions, and their release would tend to inhibit the open
and frank exchange of ideas essential to the deliberative process.
Pursuant to 10 CFR 9.9 of the Comissions regulations, it has been determined
that the information withheld is exempt from production or disclosure, and
that its production or disclosure is contrary to the public interest. The
persons responsible for this denial are the undersigned and Mr. James G.
Keppler, Regional Administrator, NRC Region III.
This denial may be appealed to the Comission's Executive Director for
Operations within 30 days from the receipt of this letter. As provided in 10
CFR 9.11, any such appeal must be in writing, addressed to the Executive
Director for Operations, U.S. Nuclear Regulatory Comission, Washington, DC
20555, and should clearly state on the envelope and in the letter that it is
an " Appeal from an Initial F0IA Decision."
The NRC has not completed its review of the remaining document subject to your
request. We will respond as soon as that review is completed.
Si rely,
r
J. M. Felton, Director
Division of Rules and Records
Office of Administration I
1
Enclosure: As stated l
l
!
!
l
B509060321 850905
PDR FOIA '
'
GARDE 85-452 PDR
i
-- -
_ _ _ _ _ _ _ _ _ _ _ __- -
. .
..
_ _._
l i
.
l
Re: F01A-85-452
J
l APPENDIX C
!
DOCUMENTS TO BE WITHHELD
l
l
)'
1. 04/05/84 Memorandum for DeYoung from Keppler on Special Quality '
Assurance Program Inspection Findings (2 pages)
! 2. 05/23/84 Memorandum for Keppler from Spessard on Enforcement Actions
j with the special quality assurance program findings (5 pages)
l
3. 02/25/85 Draft Citations for future enforcement actions (4 pages)
! 4. Undated Draft #1 thru #6 on Braidwood (122) l
5. Undated Draft responses to Ceco responses to 83-09 (4 pages)
3
!
!
. _ . - - - _ _ _ _ _ . . . _ . . _ ,- _ _ . _ . . _ _ . . , . _ _ _ . _ _ . _ . ._ . - . _ _ . . _ _ _ _ . .
V
. .
.s . y(
C
~
i
GOVERNMENT ACCOUNTABILITY PROJECT
1555 Connecncut Awnue, N.W., Suite 202 I
Washington. D.C. 20036 (202)232-8550
June 19, 1985
FftEM OF lNfokmmeVii
M WI
FREEDOM OF INFORMATION REQUEST
FOI A- BS- 452
Director g (p/ M h
Office of Administration I
U.S. Nuclear Regulatory Commission
Washington, D.C. 20555 i
'
To Whom It May Concern:
Pursuant to the Freedom of Information Act ("FOIA"), 5
U.S.C. 552, the Government Accountability Project (" GAP")
requests copies of any and all agency records and information,
including but not limited to notes, letters, memoranda, drafts,
minutes, diaries, logs, calendars, tapes, transcripts, summaries,
interview reports, procedures, instructions, engineering '
analyses, drawings, files, graphs, charts, maps, photographs,
agreements, handwritten notes, studies, data sheets, notebooks,
books, telephone messages, computation, voice recordings, com- f
puter runoffs, any other data compilations, interim and/or final ,
reports, status reports, and any and all other records relevant i
to and/or generated in connection with Braidwood IE Report 83-09, ;
as well as any and all records relevant to and/or generated in !
connection with this FOIA request. l
This request includes all agency records as defined in 10 i
C.F.R. 9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and
A.3 (approved october 8, 1980) whether they currently exist in l
the NRC official, " working," investigative or other files, or at
any other location, including private residences.
If any records as defined in 10 C.F.R. 9.3a(b) and the NRC
Manual, supra, and coverd by this request have been destroyed
and/or removed after this request, please provide all surrounding
records, including but not limited to a list of all records which
have been or are destroyed and/or removed, a description of the
action (s) taken relevant to, generated in connection with, and/or
issued in order to implement the action (s).
GAP requests that fees be waived, because " finding the
information can be considered as primarily benefitting the gene-
ral public," 5 U.S.C. section 552 (a) (4) (a) . GAP is a non-profit,
non-partisan public interest organization cocnerned with honest
and open government. Through its Citizens Clinic, GAP offers
C_'l ;
-
_ -
o - .
,
.
'
.
,
FOIA REQUEST
Page Two
June 19, 1985
We are requesting the above information as part of an i
ongoing monitoring project on the adequacy of the NRC's efforts
to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a speci-
fic FOIA exemption, please provide an index itemizing and
describing the documents or portions of documents withheld. The
index should provide a detailed justification of your grounds for
claiming each exemption, explaining why each exemption is rele-
vant to the document or portion of the document withheld. This
index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C.
Cir. 1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten
days.
Sincerely,
h- i :
- -
-
s%-_u
Billie Pirner Garde
citizens clinic Director
BPG:res
!
l
l
l
1
l
. - - - .- -