February 19, 1997 N0ED No. 97 2-001 Tennessee Valley Authority ATTN: Mr. Oliver D. Kingsley, Jr.
President TVA Nuclear and Chief Nuclear Officer 6A Lookout Place 1101 Market Street Chattanooga, TN 37402 2801
SUBJECT:
NOTICE OF ENFORCEMENT DISCRETION FOR TENNESSEE VALLEY AUTHORITY REGARDING SEQUOYAH NUCLEAR PLANT (UNITS 1 AND 2)
In the enclosed letter dated February 14, 1997, you requested the U.S. Nuclear Regulatory Commission (NRC) to exercise discretion not to enforce compliance with the actions required in Units 1 and 2 Technical Specification (TS) 3.8.1.1, Action b.
These TSs require that with one diesel generator set inoperable, all four diesel generator sets must be restored to the operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or both units must be in at least the hot standby condition within the next six hours and in the cold shutdown condition within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Your letter documented information discussed with the NRC in telephone conversations on February 14, 1997, at 11:30 a.m., and 3:00 p.m.
You stated that on February 14, 1997, at 5:25 p.m., the Sequoyah Nuclear Plant would not be in compliance with the Unit 1 and 2 TS Action statement and therefore shutdown of Units 1 and 2 would be required. This TS Action statement was entered on February 11, 1997, at 5:25 p.m.
You requested that a Notice of Enforcement Discretion (N0ED) be issued pursuant to the NRC's policy regarding exercise of discretion for an operating facility, set out in Section VII.c, of the " General Statement of Policy and Procedures for NRC Enforcement Actions" (Enforcement Policy). NUREG 1600, and be effective from 5:25 p.m., on February 14, 1997, to 5:25 p.m., on February 16, 1997.
This condition was a result of problems encountered during planned testing and maintenance on the 2A A emergency diesel generator (EDG).
Specifically, these aroblems initially involved an inadequate polarization index level on the 2A A EDG 'C' phase winding. This problem was resolved; however, during subsequent testing an unrelated problem with degraded performance of the 2A2 engine governor was identified. You stated that your root cause evaluations identified that replacement of the governor actuator would resolve the degraded performance of the 2A2 engine.
You requested an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after the expiration of TS 3.8.1.1, Action b, to complete the testing of the 2A A EDG after the governor replacement to ensure EDG operability.
You provided as your safety rationale for issuing the N0ED several improvements to the plant / electrical grid interfaces at Sequoyah that have been made since the original 72-hour allowed outage time of TS was established. The results of your probabilistic safety assessment indicated that only a small change in the core damage frequency would occur as a result 9702250320 970219 1
PDR ADOCK 05000327
(
G PDR bI
\\
TVA 2
of the increased outage time for EDG 2A A.
You provided information on the high reliability of Sequoyah EDGs and noted that an allowed outage time of 7 days had been justified for a planned EDG maintenance outage once 3er l
18 months per EDG in your TS Change Request 96 08 (submitted to the iRC August 22, 1996).
You stated that compensatory measures would include the performance of TS surveillance requirements (SR) 4.8.1.1.1.a every four hours. You stated that B train components would be protected while the 2A A EDG is out of service, 1
and the switchyard would be protected to ensure offsite power supply
)
reliability.
You also stated that your request for enforcement discretion had been approved by your Plant Onsite Review Committee.
In addition, you successfully tested EDGs 1A A, IB B, and 2B B prior to the time at which TS 3.8.1.1, Action b, would require a plant shutdown.
At the request of the NRC, yo's stated that operators would be provided refresher training for contingency plans to cross connect electrical loads during a loss of offsite power emergency. Also, Engineered Safety Features equipment, other than that needed to support any EDG 2A A testing during the 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> extension, would be protected.
The staff has reviewed the above rationale regarding improvements in plant electrical grid interfaces, the results of your probabilistic safety assessment, and your EDG reliability information.
In addition, your compensatory measures, along with additional measures requested by the NRC, provide the appropriate justification to sup) ort a conclusion that enforcement discretion should be given to avoid undesiraale transients as a result of forcing compliance with the TS, and would thus minimize potential safety consequences and operational risks.
On the basis of the staff's evaluation of your request, including the compensatory measures described above, the staff has concluded that an N0ED is warranted because we are clearly satisfied that this action involves minimal or no safety impact and has no adverse radiological impact on public health and safety. Therefore, it is our intention to exercise discretion not to enforce compliance with TS 3.8.1.1 Action b, for the period from 5:25 p.m.,
EST on February 14, 1997, to 5:25 p.m., EST on February 16, 1997.
- However, this enforcement discretion is contingent upon the continued belief that the root cause of the EDG 2A A problem is associated with the engine governor.
If, during the additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of enforcement discretion, you find that the root cause is other than the engine governor, or a new aroblem is identified during EDG 2A A testing that would require the EE to be declared inoperable, this enforcement discretion is terminated, after which you must immediately comply with Action b of TS 3.8.1.1.
This letter documents our telephone conversation on February 14, 1997, at 4:20 p.m., when we orally granted this notice of enforcement discretion. We understand that the condition causing the need for this N0ED was corrected by you causing you to exit from TS 3.8.1.1, Action b, and this N0ED on February 15, 1997, at 1:30 p.m.
TVA 3
However, as stated in the Enforcement Policy, action will normally be taken, to the extent that violations were involved, for the root cause that. led to the noncompliance for which this N0ED was necessary.
Sincerely, (Original signed by L.
A.
Reyes)
Luis A. Reyes Regional Administrator Docket Nos, 50 327, 50 328 License Nos. DPR 77, DPR 79
Enclosure:
TVA letter dated February 14, 1997 w/ encl cc w/ enc 1:
(See page 4) i i
i TVA 4
cc w/ encl:
Mr. O. J. Zeringue Mr. J. T. Herron Senior Vice President Plant Manager Nuclear Operations Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P. O. Box 2000 1101 Market Street Soddy Daisy TN 37379 Chattanooga, TN 37402 2801 Mr. Michael H. Mobley, Director Dr. Mark O. Medford Division of Radiological Health Vice President 3rd Floor. L and C Annex
~
Engineering and Technical Services 401 Church Street 6A Lookout Place Nashville, TN 37243-1532 1101 Market Street Chattanooga, TN 37402 2801 County Executive Hamilton County Courthouse Mr. R. J. Adney Chattanooga, TN 37402 2801 Site Vice President Sequoyah Nuclear Plant Distribution w/ encl:
(See page 5)
Tennessee Valley Authority P. O. Box 2000 Soddy Daisy TN 37379 General Counsel Tennessee Valley Authority ET 10H 400 West Summit Hill Drive Knoxville, TN 37902 Mr. R. R. Baron General Manager Nuclear Assurance & Licensing 4J Blue Ridge 1101 Market Street Chattanooga, TN 37402 2801 Mr. P. Salas, Manager Licensing and Industry Affairs Tennessee Valley Authority 4J Blue Ridge 1101 Market Street Chattanooga, TN 37402 2801 Mr. R. H. Shell, Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P. O. Box 2000 Soddy Daisy, TN 37379
1 TVA 5
Distribution w/ encl:
L. A. Reyes, RII E. W. Herschoff, RII H. L. Thompson, NRR I
S.-J. Collins, NRR J. R. Johnson, RII M. S. Lesser, RII i
S. E. Sparks, RII F. J. Hebdon, NRR R. W. Hernan, NRR H. L. Whitener, RII C. F. Smith, RII D. H. Thompson, RII J. H. Moorman, RII E. D. Testa, RII PUBLIC NRC Resident Inspector U. S. Nuclear Regulatory Commission 2600 Igou Ferry Soddy-Daisy TN 37379 NRC Resident Inspector U. S. Nuclear Regulatory Commission 1260 Nuclear Plant Road Spring City, TN 37381 l
r o E Mail i
James Lieberman, OE Electronic copy to E-mail address: N0ED t
t Of'f f CE DPD/PIf a
DDP/PII DPP/Dff OPA/pf f f ODA/Dif NPR S 5A le g
SIGNATURE hAME SSperl 5:vy9 Ma ymlock J jpson Bur EMerschoff Glainas hhb DATE 02/lb/97 02 / ik / 97
/ 97 02 /
/ 97 02 /
/ 97 02 /
/ 97 COPY?
YES NO YES NO YES NO
/[YES)
NO YES NO YES NO v
OrFfer DP9/D!f OD9 /DYi.
SIGNATURE
[
NAME CChristensen JJaudon 02/ k M7 02 / f3 / 97 02 /
/ 97 02 /
/ 97 02 /
/ 97 02 /
/ 97 DATE COPY?
YES (NO)
YES ' [NU YES NO YES NO YES NO YES NO u m c a secosu con ouce m w e u mse.3m uto.tou e
i i
i 4
6 TVA 1
IHatri k inn tr/ancl:
E. A. Reyes, RII E. W. Norschoff, RII H. L. Thompson, NRR
- 8. J. Collins, IRR l
J. R. Johnson, RII i
M. S. Lesser, RI!
S. E. Sparks, RII i~
F. J. Hebdon, NRR R. W. Hernan, MR i
H. L. Whitener. RII i
C. F. Smith, RII D. H. Thompson, RII j
J. H. Moorman RII E.D. Testa,III PUBLIC lac Resident Inspector U. 8. Nuclear Regulatory Commission 2000 Igou Ferry 50Gdy-Daisy,TN 37379 BC Resident Inspector U. 8. Nuclear Regulatory Commission 1250 Nuclear Plant Road Spring City. TN 37341 L-Bail James Lieberman, OE Electronic copy to I-mail address: N0ED na a mu m
nerer r-t_ r nasam c= i ma OdONAYURS NAME SGperke:vys Mehymisek JJohnson 80 rye EMemehoff ines Ot i ft t)
DATE 089 191 Oti 191 089 991 Ott 197 DEI 191 corY7 YES NO Yes NO YES NO YOS NO YES NO YB5 k_
E,0NATURL NAMs ccusween JJeween DAYE oti ici oss tel 02/ /s7 oss r et or/ se7 ost /s7 COPY?
YW
,e0 YES hO YES NO YEt NO YSS NO YtB ND Es\\pR6.pgi
-,5De m T I NaKJ orr: CIA now - wr,
_