ML20134P219

From kanterella
Jump to navigation Jump to search
Forwards Advance Copy of NUREG-1021, Operator Licensing Exam Standards for Power Reactors, Interim Rev 8.W/o Encl
ML20134P219
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/20/1997
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Schnell D
UNION ELECTRIC CO.
References
RTR-NUREG-1021 NUDOCS 9702250210
Download: ML20134P219 (5)


Text

.

p* "% UNITE D STATES

.i #r t NUCLEAR REGULATORY COMMISSION 2

g. .g REGloN IV 3 8 611 RYAN PLAZA oRIVE. SulTE 400 b9 . . . . . ,8 AR LINcToN, T E xAS 76011 8064 Donald F. Schnell, Senior Vice President - Nuclear Union Electric Company P.O. Box 66149 St. Louis, Missouri 63166-6149

SUBJECT:

ISSUANCE OF INTERIM REVISION 8 OF NUREG-1021," OPERATOR

' LICENSING EXAMINATION STANDARDS FOR POWER REACTORS"

Dear Mr. Schnell:

0 The purpose of this letter is to provide your licensed operator training staff with an advance copy of NUREG-1021," Operator Licensing Examination Standards for Power Reactors," Interim Revision 8. Due to the length of this document, a copy is attached only to our contact on your training staff listed below. Formal publication and normal distribution is expected by the end of February 1997. Because this is an early copy, minor font and pagination changes may be expected when compared to the distribution copy.  :

Also enclosed, to the same contact, is a single electronic version on diskette of the  :

document in a compressed format. Additional _ electronic copies are available via the Internet at URL http://www.nrc. gov /NRC/NUREGS/SR1021/index.html. ,

As noted in the formal publication of the interim revision, it will be required for initial license examinations administered 6 months after its publication date and may be adopted sooner at your option, i

If you have questions or comments, please contact John L. Pellet,' Chief, Operations Branch, at (817) 860-8159.  :

Sincerely, j m e- -

[ Kenneth E. Brockman, Acting Director Division of Reactor Safety i

Docket No.: 50-483  ;

License No.: NPF-30 cc w/ enclosures:

J. Dampt, Shift Supervisor for Operator Training Union Electric Company )

P.O. Box 66149 St. Louis, Missouri 63166-6149 o I i

9702250210 970220 PDR ADOCK 05000483 V PDR

l Entergy Operations, Inc. cc w/o enclosures:

Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, Maryland 20855 Gerald Charnoff, Esq.

Thomas A. Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, D.C. 20037 H. D. Bono, Supervising Engineer Site Licensing Union Electric Company P.O. Box 620 Fulton, Missouri 65251 G. L. Randolph, Vice President Nuclear Operations Union Electric Company P.O. Box 620 Fulton, Missouri 65251 Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, Missouri 65102 Ronald A. Kucera, Deputy Director l Department of Natural Resources P.O. Box 176 )

Jefferson City, Missouri 65102 Neil S. Carns, President and 1 Chief Executive Officer Wolf Creek Nuclear Operating Corporation l P.O. Box 411 i Burlington, Kansas 66839 l l

I Entergy Operations, Inc. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, Missouri 63130 Lee Fritz, Presiding Commissioner Callaway County Court House i 10 East Fifth Street Fulton, Missouri 65151 Alan C. Passwater, Manager Licensing and Fuels Union Electric Company P.O. Box 66149 i St. Louis, Missouri 63166-6149 J. V. Laux, Manager Quality Assurance Union Electric Company P.O. Box 620 Fulton, Missouri 65251

. F 1(

l Entergy Operations, Inc. l E-Mail report to T Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK) bec to DMB (1E42) bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director MIS System Branch Chief (DRP/C) RIV File Project Engineer (DRP/C) DRS-PSB Branch Chief (DRP\TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

S. Richards, NRR i

I

( DOCUMENT NAME: G:\DRSLTRS\NURG1021\CW.JLP To receive copy of document. Indicate in box: "C" = Copy without enciosures "E" = Copy with enclosures "N" = No copy

C:OB:DRS ,l VC AD:DRS N, j JLPellet /) KEBrockmagg 02/p97 02Ati/97 l OFFICIAL RECORD COI)Y t

_ . . . _ . _ . , . _ . _ _ _ . _ . _ _ . . . . _ . . _ . _ . . . _ _ . - ~ . _ _ - . . _ . . _ . . . _ . _ _ . _ _ . . .

a f

f Entergy Operations, Inc. l E-Mail report to T. Boyce (THB) .

E-Mail report to NRR Event Tracking System (IPAS)  !

E-Mail report to Document Control Desk (DOCDESK) '

bec to DMB (1E42) bec distrib. by RIV:

Regional Administrator Resident inspector l DRP Director MIS System  !

Branch Chief (DRP/C) RIV File I Project Engineer (DRP/C) DRS-PSB I Branch Chief (DRP\TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

S. Richards, NRR 1

1 4

l

)

DOCUMENT NAME: G:\DRSLTRS\NURG1021\CW.JLP D To receive copy of document, indicate in box: "C" = Copy weout enclosures "E" = Copy we enclosures "N" = No copy k C:OB:DRS ,l VC AD:DRS N, JLPellet [] KEBrockmaM 02/p97 02 5/97 OFFICIAL RECORD col 8Y l 1

-250027