Informs That Proprietary Matl Encl w/961028 Ltr Re AP600 Design Will Be Withheld from Public Disclosure as Requested
ML20134N590
Person / Time
Site: 05200003
Issue date: 02/19/1997
From: Diane Jackson
NRC (Affiliation Not Assigned)
To: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 9702240278
Download: ML20134N590 (5)


Text

_ _ _ . . _ _ _ _ - _ _ _ -. _ _ . . - . _ _ .. _ ___ _ _ . _ _ _ _ _ _

T>xts l' , L

! p uo

!?  %-

l

" UNITED STATES

$ E NUCLEAR REGULATORY COMMISSION E WASHINGTON, D.C. soseHoot i

\ *****,o# February 19, 1997 1

{ Mr. Brian A. McIntyre, Manager Advanced Plant Safety and Licensing (

3 ) ,_ ]  !

i Westinghouse Electric Corporation l Energy Systems Business Unit l P.O. Box 355 i l Pittsburgh, PA 15230-0355 t

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLO WESTINGHOUSE AP600 DESIGN LETTER OF OCTOBER 28, 1996 t

j

Dear Mr. McIntyre:

1 1 .

By Westinghouse letter NSD-NRC-96-4864, dated October 28, 1996, you submitted i- Westinghouse material, as identified in the enclosure, that had been sent to I the staff via facsimile for the time period of September 23, 1996 to Octo-  !

ber 24, 1996. The facsimiles were submitted in draft form to expedite the '

! staff's review. Your letter stated that proprietary and non-proprietary versions of the material were provided via an enclosure.

j In your letter, you identify that information in the submittal is considered I

{

proprietary and request that it be withheld from public disclosure in accor-dance with 10 CFR 2.790. The attached affidavit (AW-96-1027 ,

{ on the same date, states that the designated information, own)ed and held inexecuted ,

{ confidence b {

j disclosure. y Westinghouse, should be considered exempt from mandatory public  !

5 The following reasons have been provided for your request:

! (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse

> constitutes a competitive economic advantage over other companies.

d (b) It consists of supporting data, including test data, relative to a

! process (or component, structure, tool, method, etc.), the ap '

1 of which data secures a competitive economic advantage, e.g., by plication optimization or improved marketability. '

j (c)

Its use by a competitor would reduce his expenditure of resources or i

improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, of licensing a similar product.

! We have reviewed your submittal and the material in accordance with i

10 CFR 2.790, and on the basis of Westinghouse's statements, have determined f i

that the submitted information sought to be withheld contains trade secrets or f i I 4 proprietary commercial information. Therefore, we have determined that the proprietary material enclosed in NSD-NRC-96-4864, which is marked as propri- / i etary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) U,[/h 4

i and Section 103(b) of the Atomic Energy Act of 1954, as amended. However,  !

you did not submit a non-proprietary version of the proprietary material in j your non-proprietary submittal. You removed the pages that you consider j

21004i B Cfu CBHBtCOPY l I

9702240278 970219

] PDR ADOCK 0520 3 4

A

, , . 1 5

+ l

, s1 -

ya s. 'A' L ,'

1

  • t Mr. Brian A. McIntyre.

bruari 19, i997 ' ,

g -

+

proprietary without indicating in the non-proprietary version the pages were' missing. You are requested to submit a complete non-p'roprietary version of your October 28, 1996, enclosure within 30 days of the date of this41etter.

Further, the staff can not protect information that'was 'ent s by Westinghouse via facsimile from interception during transmittal. .

Withholding from'public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public disclosure should change in the future such that the information could then be made available-for public inspection, you should promptly notify the NRC. You should understand that the NRC may have cause to review this determination in the future, for' example, if the scope of a Freedom of Information Act request includes your withheld information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, original signed by:

Diane T. Jackson, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No.52-003

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTLON:

Dechet F1 er PDST R/F TMartin

  • PUBLIC DMatthews TRQuay DJackson TKenyon JSebrosky - -

JMoore, 0-15 B18 BHuffman . MPSiemien, 0-15 B18 'f WDean, 0-17 G21 ACRS (11) T DOCUMENT NAME: A:IC10 PRP (A AP600 DISK)

. - , 2896

- , / .*See previous concurrence u . w . e.c,- v.c. ,o v. .

OFFICE PM:PDST:DRPM _l OGC l D:PDST:DRPM l - l .l NAME DTJackson:sg L/)( MPSiemien* TRQuay M1A $- * -

DATE 02/M/97- U 01/08/97 02/ A/97 ' 4 0FFICIAL RECORD COPY

~

(

p , ,

t  ?

1 .a  ; -

W Y i.

._ . . _ . . = . . .. -- - .

l

.* )

1 E

Mr. Brian A. McIntyre Docket No.52-003 Westinghouse Electric Corporation AP600 )

Mr. Nicholas J. Liparulo Mr. Ronald Simard, Director Nuclear Safety and Regulatory Analysis Advanced Reactor Programs Nulcear and Advanced Technology Division Nuclear Energy Institute l Westinghouse Electric Corporation 1776 Eye Street, N.W.

P.O. Box 355 Suite 300 Pittsburgh, PA 15230 Washington, DC 20006-3706 Mr. John C. Butler Ms. Lynn Connor Advanced Plant Safety & Licensing Doc-Search Associates Westinghouse Electric Corporation Post Office Box 34 Energy Systems Business Unit Cabin John, MD 20818 Box 355 Pittsburgh, PA 15230 Mr. James E. Quinn, Projects Manager LMR and SBWR Programs Mr. M. D. Beaumont GE Nuclear Energy Nuclear and Advanced Technology Division 175 Curtner Avenue, M/C 165 Westinghouse Electric Corporation San Jose, CA 95125 One Montrose Metro 11921 Rockville Pike Mr. John E. Leatherman, Manager Suite 350 SBWR Design Certification Rockville, MD 20852 GE Nuclear Energy, M/C 781 San Jose, CA 95125 Mr. Sterling Franks U.S. Department of Energy Barton Z. Cowan, Esq.

NE-42 Eckert Seamans Cherin & Mellott Washington, DC 20585 600 Grant Street 42nd Floor Pittsburgh, PA 15219 Mr. S. M. Modro Nuclear Systems Analysis Technologies Mr. Ed Rodwell, Manager Lockheed Idaho Technologies Company PWR Design Certification Post Office Box 1625 Electric Power Research Institute Idaho Falls, ID 83415 3412 Hillview Avenue i

Palo Alto, CA 94303 Mr. Frank A. Ross U.S. Department of Energy, NE-42 Mr. Charles Thompson, Nuclear Engineer ;

Office of LWR Safety and Technology AP600 Certification i 19901 Germantown Road U.S. Department of Energy  !

Germantown, MD 20874 NE-451  :

Washington, DC 20585

Facsimiles sent to NRC between September 23, 1996 to October 24, 1996 No. West.

Date Pages Subject of facsimile Proprietary 10/24/96 11 Westinghouse open item workoff goals N 10/24/96 3 Description of pH Adjustment Analysis Cases N 10/21/96 29 WCobra Trac (WC/T) Long Term Cooling (LTC) Y - Removed calculation comparisons vs. Oregon State from non-University data for telephone conference proprietary version 10/21/96 12 Open Item Tracking System (0ITS) printout N for SSAR Section 9.4 10/17/96 1 Westinghouse statement of " doneness" for N SSAR Section 3.9 10/17/96 6 Draft TS 3.7.8 for secondary coolant system N leakage no date 2 Westinghouse summary of 10/15/96 telecon on N MAAP4 and T/H uncertainty RAI responses no date 2 Note dated October 10, 1996 regarding ther- N mal hydraulic (T/H) uncertainty RAI re- I sponses 10/17/96 7 Westinghouse open item workoff goals N 10/15/96 33 WC/T LTC plots for 10/16 telephone confer- Y - Removed ence from non-proprietary version 10/14/96 2 Description of RAI response to OITS# 638 N 10/9/96 3 Draft RAI 410.115 R1 response to OITS# 229 N 10/9/96 1 Westinghouse statement of " doneness" for N l SSAR Section 14 '

l 10/7/96 2 Draft RAI 410.255 R1 response to OITS# 366 N l 9/27/96 3 Standard safety analysis report (SSAR) N Narkup of Section 10.1.1 and Table 10.1-1 j 9/26/96 1 Westinghouse statement of " doneness" for N SSAR Section 16.2 9/26/96 1 Westinghouse statement of " doneness" for N SSAR Section 13 9/26/96 3 SSAR Markup of 9.2.1.5 and 9.2.1.3 N

)

9/23/96 1 Westinghouse statement of " doneness" for N l SSAR Section 7  !

Enclosure i

l

-- _. - - ~ - --- . . .

1 l

~ \

l No. West.

Date Pages Subject of facsimile Proprietary 9/23/96 1 Westinghouse statement of " doneness" for N i SSAR Section 3.11 9/23/96 1 Westinghouse statement of " doneness" for N SSAR Section 4 9/23/96 1 Westinghouse statement of " doneness" for N i SSAR Section 3.7 '

9/23/96 1 Westinghouse statement of " doneness" for N SSAR Section 2 9/23/96 1 Westinghouse statement of " doneness" for N I SSAR Section 3.2 I