ML20134M874

From kanterella
Jump to navigation Jump to search
Ltr Contract:Task Order 42, Technical Assistance in Initial Exam for St Lucie NPP, Under Contract NRC-03-94-035
ML20134M874
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/14/1997
From: Wiggins E
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sanders L
SONALYSTS, INC.
References
CON-FIN-J-2073, CON-NRC-03-94-035, CON-NRC-3-94-35 NUDOCS 9702210062
Download: ML20134M874 (4)


Text

- --

', $J; y ,, , ,..t UNITED STATES j .) jG ') y NUCLEAR REGULATORY COMMISSION

"; h 'i ! WASHINGTON D.C. 20%f>-0001 e

%,}

l f [$$

y,7 Sonalysts, Inc. '

ATTN: Ms. LaVeria Sanders Contracting Officer 215 Parkway North Post Office Box 280 Waterford, Connecticut 06385

SUBJECT:

TASK ORDER NO. 42, ENTITLED " TECHNICAL ASSISTANCE IN THE INITIAL EXAMINATION FOR ST. LUCIE NUCLEAR POWER PLANT" UNDER CONTRACT NO. NRC-03-94-035

Dear Ms. Sanders:

l In accordance with Section G.4 (c) of the subject contract, entitled

" Task Order Award," this letter definitizes the subject task order.

This effort shall be performed in accordance with the enclosed Statement of Work.

Task Order No. 42 shall be in ef fect from February 11, 1997 through July 30, 1997 with a cost ceiling of $41,567. The amount of M represents the total estimated reimbursable costs, the amount of M represents the fixed fee, and the amount of g represents the facility's capital cost of money.

The accounting data for the subject task order is as follows:

B&R No.: 720-15-11-20-00 Job Code No.: J-2073 Appropriation No.: 31X0200.720 BOC No.: 252A NRR Unique Identifier: NRR9403542 Obligated Amount: $41,567 The following individual is considered to be essential to the successful performance of the work hereunder: T. Guilfoil, I. Kingsley, D. Lane, W. McGonegal, and G. Weale.

The Contractor agrees that such personnel shall not be removed f rom the effort under the task order without compliance with Contract Clause H.1, Key Personnel.

Your contacts during the course of this task order are:

l l Technical Matters: Mr. Lawrence Vick j Project Officer 210002 001) 415 - n 81 g g/

Contractual Matters: Ms. Anita Hughes Contract Specialist (301) 415-6526 9702210062 970214 PDR CONTR i NRC-03-94-035 PDR

j

-2 -

Contract No. NRC- 03 03 5 Task Order No. 42 The issuance of this task order does not amend any terms or  ;

conditions of the subject contract. i Please indicate your acceptance of this task order by having an ,

official, authorized to bind your organization, execute three (3) l copies of this document in the space provided and return two (2) copi.es to the U.S. Nuclear Regulatory Commission, ATTN: Ms. Anita Hughes, Division of Contracts, T-7I2, ADM/DC/ TAB 2, Washington, D.C.

20555. You should retain the third copy for your records.

Sincerely,

/ ,

l lois J. Wiggins, Contracting Of ficer 1 Technical Acquisition Branch No. 2 1 Division of Contracts Office of Administration

Enclosure:

As stated ACCEPTED:

% 8 l. Nw ~

Name /

Cw r-cnsc oma~

Title dv/n Dath ' ~

4 TASK ORDER NO. 42 A. DESCRIPTION Reactor operator licensing examinations are scheduled at the nuclear power plant described below. Details of the examinations follow:

Facility: ST. Lucie Location: Hutchinson Island, FL Docket: 50-335/389 Date of Exam: 06/16/97 Type of Exam: Initial Number of Candidates: Total S_ (R0:J,SR0:__Q,SR00:J , SR01:_6)

Note: X denotes applicable item related to this task order The number value indicates the number of task per item 1 Contractor will assist in examination development.

CONTRACT EXAMINERS SHALL:

x 1 Prepare R0 written exam, per ES-401 x 1 Prepare SRO written exam, per ES-401 x 5 Prepare simulator scenario sets, per ES-301 x 3 Prepare walkthru exam outlines (JPM sets), per ES-301 Review walkthru exam outlines and prepare associated administrative questions, per ES-301 x 1 Submit written examinations, simulator scenarios, and/or walkthru exam outlines as appropriate to Regional office for review on a schedule consistent with the HOLB Examiner Standards, ES-401, ES-201 x 1 Incorporate changes to written exam, simulator scenarios, and/or walkthru exam outlines as appropriate, per ES-201, ES-301, ES-401 Participate in facility review of written exam, per ES-201 Administer written exams at plant site, per ES-402 Administer operating exams at plant site, per ES-302 Grade operating examinations, per ES-303 Update Examination Question Bank, per ES-501 Attend exit briefing with facility Assist in review of facility developed examination material and preparation of written examination Conduct on-site pre-exam familiarization week of 06/02/97 Conduct in-office preparation for exam, per ES-601, ES-602 Assist in administration of requalification exam, per ES-601, ES-602, ES-603 during week of N/A Grade written requalification exams, per ES-601

" e --w n k.a . >.n v

8. ESTIKATED LEVEL OF EFFORT Examination preparation, administration, grading and Project

' Management: 490 PSH Travel for 0 examiner (s) between contractor's main office and plant site: O PSH Clerical: 32 PSH C. PERIOD OF PERFORMANCE 02/11/97 thru 07/30/97 D. REPORTS The contractor shall submit Operator Examination Reports, summary sheets and other documentation as required by the Operator Licensing Examiner Standards, NUREG-1021, to the Region office..

E. NRC REGIONAL CONTACT: Charlie Payne(404) 331-4666 i

1 i