ML20134M670

From kanterella
Jump to navigation Jump to search

Refers to Submitting Relief Request for Plant, Unit 2 Re Implementation of Containment Insp Rule.Rai Encl
ML20134M670
Person / Time
Site: Hatch 
Issue date: 02/18/1997
From: Jabbour K
NRC (Affiliation Not Assigned)
To: Woodard J
GEORGIA POWER CO.
References
TAC-M97385, NUDOCS 9702200349
Download: ML20134M670 (4)


Text

i.

February 18, 1997 Mr. Jack D. Woodard Senior Vice President -

Nuclear Operations Georgia Power Company P. O. Box 1295 Birmingham, Alabama 35201

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE RELIEF REQUEST ON IMPLEMENTATION OF CONTAINMENT INSPECTION RULE - EDWIN 1. HATCH NUCLEAR PLANT, UNIT 2 (TAC N0. M97385)

Dear Mr. Woodard:

By letter dated December 2, 1996, you submitted a relief request for Hatch Unit 2 regarding the implementation of the containment inspection rule. The staff has reviewed the submittal and determined that supplemental additional information, as outlined in the enclosure, is needed before we can complete our review.

We request that you provide the additiona: information within 30 days from the date of this letter.

Please contact me at !701) 415-1496 if you have any questions.

Sincerely, Original signed by:

Kahtan N. Jabbour, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-366 hh kh h bb

Enclosure:

As stated cc w/ encl:

See next page Distribution:

Docket File SVarga LBerry r.

ACRS y

PUBLIC JZwolinski KJabbour b"4Herschoff, RII

' PD II-2 Rdg.

HBerkow OGC PSkinner, RII O FO' i '

9702200349 970218 gDR ADOCK 0500036o PDR DOCUMENT NAME: G:\\ HATCH \\ HAT 97385.RAI p

T@ receive a copy of this document, irdicate in the box C=Co:ry w/o shach osure E= Copy with attachment / enclosure N = No copy 0FFICE PM:PDII-2 6

LA:PDII-2i\\ h (BChB D; MIN NAME XJabbour:cn,.-

LBerry Ih

/GBagchi Hber h /

DATE f // d/97 h h97 L/ h/N/97 2 Il N'll

~

OFFICIAL RECORD COPY

pn cnnaq

{

p UNITED STATES g

j NUCLEAR REGULATORY COMMISSION

%,*****/g WASHINGTON, D.C. 2066H001 February 18, 1997 Mr. Jack D. Woodard Senior Vice President -

Nuclear Operations Georgia Power Company P. O. Box 1295 1

Birmingham, Alabama 35201

SUBJECT:

REQU HT FOR ADDITIONAL INFORMATION REGARDING THE RELIEF REQUEST ON IMPLEHENTATION OF CONTAINMENT INSPECTI0ft RULE - EDWIN 1. HATCH NUCLEAR PLANT, UNIT 2 (TAC NO. M97385)

Dear Mr. Woodard:

Ry letter dated December 2, 1996, you submitted s relief request for Hatch i

Unit 2 regarding the implementation of the containment inspection rule. The staff has reviewed the submittal and determined that supplemental additional information, as outlined in the enclosure, is needed before we can complete our review.

W request that you provide the additional information within 30 days from the date of this letter.

Please contact me at (301) 415-1496 if you have any questions.

Sincerely, (t3 6 N Yr Kahtan N. Jabbour, Senior Project Manager 4

Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-366

Enclosure:

As stated cc w/ enc 1: See next page Mr. Jack D. Woodard

_____._._._.___m___

i l

Georgia Power Company Edwin I. Hatch Nuclear Plant i

cc:

Mr. Ernest L. Blake, Jr.

Mr. Thomas P. Mozingo Shaw, Pittman, Potts and Trowbridge Program Manager l

2300 N Street, NW.

Nuclear Operations Washington, DC 20037 Oglethorpe Power Corporation 2100 East Exchange Place Mr. D. M. Crowe P. O. Box 1349 i

Manager Licensing - Hatch Tucker, Georgia 30085-1349 Georgia Power Company P. O. Box 1295 Charles A. Patrizia, Esquire Birmingham, Alabama 35201 Paul, Hastings, Janofsky & Walker 10th Floor Mr. L. Sumner 1299 Pennsylvania Avenue 1

General Manager, Nuclear Plant Washington, DC 20004-9500 Georgia Power Company P. O. Box 439 Chairman Baxley, Georgia 31513 Appling County Commissioners County Courthouse Resident Inspector Baxley, Georgia 31513 U.S. Nuclear Regulatory Commission 11030 Hatch Parkway North Steven M. Jackson Baxley, Georgia 31513 Senior Engineer - Power Supply Municipal Electric Authority Regional Administrator, Region II of Georgia U.S. Nuclear Regulatory Commission 1470 Riveredge Parkway, NW 101 Marietta Street, NW. Suite 2900 Atlanta, Georgia 30328-4684 Atlanta, Georgia 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, SW.

Atlanta, Georgia 30334 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334

i REQUEST FOR ADDITIONAL INFORMATION EDWIN I. HATCH NUCLEAR PLANT. UNIT 2 RELIEF REQUEST ON IMPLEMENTATION OF CONTAINMENT INSPECTION RULE l

1.

Provision 10 CFR 50.55a(a)(3) requires the licensee to provide acceptable alternatives to the requirements of the rule.

Please provide a summary of alternative provisions Georgia Power Company (GPC) plans to implement relative to the containment repair and replacement activities i

during the requested one year relief from the requirements of the rule.

}

2.

In the third paragraph of the letter dated December 2,1996, regarding l

the repair and replacement of ASME Class 1, 2, and 3 components, GPC indicates that it is using a version of the ASME Code Section XI that is different from the 1992 Edition (with 1992 Addenda) of the ASME Code used for the repair and replacement activities of the containment.

Please provide information regarding the version of the ASME Code that is used for ASME Class 1, 2, and 3 components, and discuss the differences between this version and those of the 1992 Edition of the Code.