ML20134M667
| ML20134M667 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/14/1997 |
| From: | Jain S DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9702200348 | |
| Download: ML20134M667 (2) | |
Text
_.
l 4,
l g
Valley Power Stanon Shippingport, PA 15077-0004 SUSHIL C.JAIN (412) 393-5512 n ice President February 14, 1997 Fax (412) s43-soas Nuclear Power Division U. S. Nuclear Regulatory Commission i
Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Beaver Valley Power Station, Unit No. I and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Property Damage Inurance Coverages Pursuant to 10 CFR 50.54(w)(3), the following information is provided concerning property damage insurance coverages for the site of the Beaver Valley Power Station located in the Borough of Shippingport, County of Beaver and Commonwealth of Pennsylvania.
l The maximum amount of primary property damage insurance coverage available in the amount of $500 million is provided as follows:
Insurer Poliev Number ParticiDation l
l American Nuclear 96149
$500,000,000 Insurers ("ANI")
and l
Mutual Atomic Energy l
Liability Underwriters
("MAELU")
l 0
Decontamination liability, decommissioning liability, and excess property damage insurance coverage available from Nuclear Electric Insurance Limited ("NEIL") in the amount of $2,250,000,000 in excess of $500,000,000 is provided as follows:
At
- )
l i
20000 DEllVEll5G l
auntm 9702200348 970214 ENERGV PDR ADOCK 05000334 g
1 l
~s A Beaver Valley Power Station, Unit No. I and No. 2 j
Prdperty Damage Insurance Coverages j
Page 2 i
. insurer Policy Number ParticiDation 1
\\
NEIL X%-014
$2,250,000,000 i
l If there are any questions regarding the information provided, please contact Mr. Roy K. Brosi, Manager, Nuclear Safety at (412) 393-5210.
i Sincerely, l
N S. C. Jain i
c:
Mr. D. M. Kern, Sr. Resident Inspector j
l Mr. H. J. Miller, NRC Region I Administrator l
Mr. D. S. Brinkman, Sr. Project Manager i
l i
l i
1 l