APPENDIX A NOTICE OF VIOLATION Arkansas Power and Light Docket No.:
50-313/85-19 Arkansas Nuclear One, Units 1 and 2 50-368/85-20 License No.: DPR-51 NPF-6 During an NRC inspection conducted on June 24-28, 1985, a violation of NRC requirements was identified.
The violation involved the inability to collect and analyze post-accident samples.
In accordance with the " General Statement of Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below:
Inability to Collect and Analyze Post-Accident Samples In an " Order Confirming Licensee Committments On Post-TMI Related Issues,"
dated March 14, 1983, and issued to-Arkansas Power and Light, Arkansas Nuclear One, Units 1 & 2, the NRC ordered the licensee,.to implement and maintain specific items described as complete in the Attachments to the Order. Attachment 1 to the respective Order indicated that the install-ation of the postaccident sampling capability was complete.
Contrary to the abnve, on June 24, 1985, and July 12, 1985, NRC inspectors determined that the postaccident sampling capability was not implemented and maintained so that required samples and analyses of reactor coolant and containment atmosphere could be obtained and analyzed as specified in NUREG-0737, II.B.3.
This is a Severity Level IV violation (Supplement I).
(313/8519-01; 368/8520-01)
Pursuant to the provisions of 10 CFR 2.201, Arkansas Power & Light Company is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation:
(1) the corrective steps which have been taken and the results achieved, (2) corrective steps which will be taken to avoid further violations, and (3) the date when full compliance will be achieved.
Consideration will be given to extending the response time for good cause shown.
Dated at. Arlington, Texas this 22nd day of Auoust,1985.