Informs NRC of Changes That Util Incorporated Into Bases Section of Units 1 & 2 Tss.Encl Provides Revised Bases Pages Affected by Revs
ML20134L922
Person / Time
Site: Sequoyah  
Issue date: 11/08/1996
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134L925 List:
References
NUDOCS 9611220091
Download: ML20134L922 (2)


Text

2 Bl4 Tennessee Vaae,j Authordy Post Office Box 2000 So61y D3'sy Tennessee 37W9 November 8,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

in the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SON) - REVISION TO THE TECHNICAL SPECIFICATION (TS) BASES (REVISIONS BR-9 AND BR-10, UNIT 1 AND BR-10 AND BR-11, UNIT 2)

The purpose of this letter is to inform NRC of changes that TVA has incorporated into the Bases section of the Units 1 and 2 TSs. Specifically, the first Bases revision for each unit adds information that clarifies the placing of a channel in trip for the Reactor Trip and Engineered Safety Feature Instrumentation Systems solely to perform testing as not requiring the channel to be declared inoperable. This position is only valid if there are no other conditions known that would indicate that the channelis inoperable.

The second Bases change revises the reservoir level assumed for balancing Essential Raw Water Cooling (ERCW) loads. TVA has performed a more accurate analysis that shows the reservoir level to be higher after postulated lake transients than previously assumed. This change indicates that a higher suction head is available to the ERCW pumps that can be used to support balancing of the system. The enclosure provides the revised Bases pages affected by these revisions.

Please direct questions concerning this issue to Keith Weller at (423) 843-7527.

}

Sincerely, i

e R. H. Shell Manager SON Site Licensing and Industry Affairs Enclosure cc: See page 2 9611220091 961100 PDR ADOCK 05000327 P

PDR 41UU(9

U.S. Nuclear Regulatory Commission Page 2 November 8,1996 cc (Enclosure):

Mr. R. W. Hernan, Project Manage.

Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 2739 Mr. Michael H. Mobley, director (w/o Enclosures)

Division of Radiological Health i

Third Floor L & C Annex j

401 Church Street Nashville, Tennessee 37243 1532 l

Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region ll t

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 i