Forwards 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves
ML20134L691
Person / Time
Site: Calvert Cliffs  
Issue date: 11/15/1996
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-96-05, GL-96-5, NUDOCS 9611210145
Download: ML20134L691 (4)


Text

_

CHAMLES II. CRCsr.

Baltimore Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant Nuclear Energy 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4455 November 15,1996 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 60-Day Response to Generic Letter 96-05, " Periodic Verification of Design-Basis Capability of Safetv-Related Motor-Operated Valves"

REFERENCE:

(a)

Letter from Mr. T. T. Martin (NRC) to Mr. C. H. Cruse (BGE), dated September 18,1996,"NRC Generic Letter 96-05: " Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves" The purpose of this letter is to forward our 60-day response to Reference (a). The generic letter was issued to request a written summary description of our program which periodically verifies that safety-related, motor-operated valves are capable of performing their safety and current licensing basis functions.

Attachment (1) contains our detailed response to the information requested.

r t,

(?

\\

D')

n.1. 0 0 tj Q 9611210145 961115 PDR ADOCK 05000317 p

PDR

]

Documrnt Control Desk November 15,1996

, Page 2, Should you have questions regarding this matter, we will be pleased to discuss them with you.-

Very truly yours, 4+eA STATE OF MARYLAND

TO WIT:

COUNTY OF CALVERT I hereby certify that on the /6fA) day of M

,19h befo e, the subscriber, a Notary Public of the State of Maryland in and for (div/Af, (

, personally v

appeared Charles H. Cruse, being duly sworn, and states that he is Vice President ofthe Baltimore Gas and Electric Company, a corporation of the State of Maryland; that he provides the foregoing response -

for the purposes therein set forth; that the statements made are true and correct to the best of.his knowledge, information, and belief; and that he was authorized to provide the response on behalf of said Corporation.

WITNESS my Hand and Notarial Seal:

- MM Notary Public My Commission Expires:

b

  1. Date /

CHC/JMO/dtm

Attachment:

(1)

Baltimore Gas & Electric Company's 60-Day Response to Generic Letter 96-05:

" Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves" cc:

D. A. Brune, Esquire T. T. Martin, NRC J. E. Silberg, Esquire Resident Inspector, NRC Director, Project Directorate I-1, NRC R. I. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC I

_7 l

ATTACHMENT (1) i t

1 i

i 4

i 4

I i

d BALTIMORE GAS AND ELECTRIC COMPANY'S 60-DAY RESPONSE TO GL 96-05:

4 i

PERIODIC VERIFICATION OF DESIGN-BASIS CAPABILITY OF i

l SAFETY-RELATED MOTOR-OPERATED VALVES 1

1 i

4 l

i i

d i

)

i i

l i

i l

l 4

4 i

l Calvert Cliffs Nuclear Power Plant Units 1 & 2 November 15,1996

ATTACHMENT (1)

BALTIMORE GAS AND ELECTRIC COMPANY'S

^

60-DAY RESPONSE TO GL 96-05: " PERIODIC VERIFICATION OF DESIGN-BASIS CAPABILITY OF SAFETY-RELATED MOTOR-OPERATED VALVES" REOUIRED RESPONSE Within 60 daysfrom the date of this generic letter, Baltimore Gas and Electric Company is required to submit a scritten response indicating schether or not the requested actions svill be completed.

Response

The requested actions are to establish a program to verify, on a periodic basis, that safety-related MOVs continue to be capable of performing their safety functions within the current licensing basis of the facility. The program should ensure that changes in required performance resulting from degradation (such as those caused by age) can be properly identified and accounted for.

We are currently revising our program to verify, on a periodic basis, that safety-related MOVs continue to be capable of performing their safety functions within the current licensing basis of the facility. The revised program will meet the requested actions of Generic Letter 96-05, and will ensure that changes in required performance resulting from degradation (such as those caused by age) can be properly identified and accounted for. We currently expect to implement this program by March 17,1997.

i 1

--