Text
.
- --
-
-
-
. .
- -
. - - .
'
60- 3N/
p are%g
.
&
UNITED STATES
g
s
[
NUCLEAR REGULATORY COMMISSION
..
WASHINGTON, D.C. 20555-0001
November 12, 1996
Mr. D.R. Gipson
Senior Vice President
Nuclear Generation
The Detroit Edison Company
6400 North Dixie Highway
'
Newport, MI 48166
SUBJECT:
ENRICO FERMI, UNIT 2 OPERATIONAL SAFETY INSPECTION (NRC INSPECTION
REPORT 50-341/96-201)
Dear Mr. Gipson:
An Operational Safety Inspection at the Fermi 2 Nuclear Plant was concluded on
September 13, 1996. The inspection team assessed the Fermi organization's
ability to identify and resolve performance problems.
In this context the
corrective action and quality assurance programs were evaluated.
Additionally, the team performed a Safety System Functional Inspection in
order to assess the performance capability of the high pressure coolant
injection (HPCI) system and the non-interruptible control air system (NIAS),
and applicable support systems.
j
The results of the inspection are presented in the attached report. Overall,
the team identified that corrective actions repeatedly failed to prevent
recurrent problems. The team identified weaknesses in the corrective action
and quality assurance programs which contributed to weak performance in the
area of operations.
Significant weaknesses in the corrective action program
include root cause analyses that are not probing enough to determine the
appropriate causal factors, and the lack of an escalation process to bring
management attention to longstanding issues.
The NRC recognizes that considerable resources had been and continue to be
invested in initiatives to improve the corrective actions and quality
assurance programs.
Recent changes in personnel and programs appear to be
designed to address concerns in these areas. However, the effectiveness of
these initiatives was not evident at the time of the inspection.
The team also determined that the HPCI system and the NIAS are capable of
performing their intended safety functions. However, numerous inconsistencies
in the UFSAR and design basis documents w::ra also identified.
d
DVo \\ ,
\\
1' 80 HLE CENTER COPY
9611210001 961112
,-
'
ADOCK 05000341
G
-
. - -
.
_
-
-
. _ _ . . _ .
.
- - _
, .
'
.
D.R. Gipson
-2-
No response to this letter is required. Any enforcement action resulting from
this assessment will be issued by Region III via a separate correspondence.
.,
'
Should you have any questions concerning this assessment, please contact the
assessment team leader, Mr. Peter Koltay, at (301) 415-2957.
Sincerely,
,
,
Robe
allo, Chief
,
'
/
Special Inspection Branch
Division of Inspection and Support Programs
Office of Nuclear Reactor Regulation
Docket No.:
50-341
.
Enclosure:
Inspection Report No. 50-341/96-201
cc:
See next page.
.
l
l
,
4
i
--
..- - - ..-----
. - . - . - _ . -
. . . . - . . . - . - - . . - - . .
. _ . _ .
_ . - . - . . _ . - . .
t
)
i
D.R. Gipson
-2-
!.
!
j
No response to this letter is required.- Any enforcement action resulting from
this assessment-will be issued by Region'III via a separate correspondence.
i-
Should you have any questions concerning~this assessment, please contact the
assessment team leader, Mr. Peter Koltay, at-(301) 415-2957.
l-
4
Sincerely,
l
Original signed by GCCwalina for:
i
j
Robert M. Gallo, Chief
Special Inspection Branch.
Division of Inspection and Support Programs
j.
Office of Nuclear Reactor Regulation
j
Docket No.:
50-341
,
l
Enclosure:
Inspection Report No. 50-341/96-201
i
l
~cc: See next page.
DOCUMENT NAME: G:\\ FERMI.RP1
'
i
j
To receive e copy of thle document, Indicate in the box: "C" = Copy without enclosuree "E" = Copy with enclosures *N" = No copy
i
0FFICE
PSIB: DISP
l
PSIB: DISP A -
PSIB: DISP _ _ 4,
PSIB: DISP b )
PSIB: DISP , ,,
NAME
PSKoltay:soins
SSanders fic
PMRay
jur 7e,
EAKleeh, #
SKMalur WM
11/ S' 96 %#
11
/96'
g
g#
'
!
0FFICE
PSIB:DI
NRR:DRPRV
.
PSIB:e7,o WC
NAME
DPNorkin O
JNHannon KV
RMGal V
l
DATE
11/N /96
11/ 12 /96
11/ R /96
0FFICIAL RECORD COPY
i
!
!
!
i
!
1
l'
l
i
I
a
F
,
i
l
l
!
. . . .
.
-
-
,
.
.-.
-.
1
1
-
Mr. Douglas R. Gipson
Detroit Edison Company
cc:
John Flynn, Esquire
Senior Attorney
Detroit Edison Company
2000 Second Avenue
Detroit, Michigan 48226
Drinking Water and Radiological
-
Protection Division
Michigan Department of
Environmental Quality
'
3423 N. Martin Luther King Jr Blvd
P. O. Box 30630 CPH Mailroom
Lansing, Michigan 48909-8130
4
U.S. Nuclear Regulatory Commission
Resident Inspector's Office
6450 W. Dixie Highway
,
l
Newport, Michigan 48166
Monroe County Emergency Management
Division
963 South Raisinville
Monroe, Michigan 48161
Regional Administrator, Region III
U.S. Nuclear Regulatory Commission
801 Warrenville Road
Lisle, Illinois 60532-4351
Peter W. Smith
Director, Nuclear Licensing
Detroit Edison Company
Fermi-2 - 270 TAC
6400 North Dixie Highway
Newport, Michigan 48166
,
C
. _ .
__ .
.. _ _ .
_ _ _ _ - . .
..
. _ _
_
. _ . _ _ . - .
.
. _ _ _ _
. . _ -
. _ . _ .
_
1
s
Distribution:
Docket Files 50-341
,
"
PSIB R/F
FPGillespie, NRR
RMGallo, NRR
DPNorkin, NRR
l
CERossi, AE00
JRoe, NRR
!
AVegel, RIII
'
JNHannon, NRR
AJKugler, NRR
'
CAJamerson, NRR
MEPoteat
"
Regional Administrators
.
Regional Division Directors
.
'
Inspection Team
PUBLIC
.
'
ACRS (3)
OGC (3)
IS Distribution
-
4
l
!
,
,
4
i
!
i
I
i
e
d
i
200074