ML20134L212

From kanterella
Jump to navigation Jump to search
Notification of Contract Execution,Mod 3,to Selection of Earthquake Resistant Design Criteria for Nuclear Power Plants,Methodology & Technical Bases. Contractor:Structural & Earthquake Engineering Consultants,Inc
Date released: 05/27/2020 Download: ML20134L212


Mod 3,extending Period of Performance Through 860930 W/No Addl Cost,To Selection of Earthquake Resistant Design Criteria for Nuclear Power Plants,Methodology & Technical Bases.
ML20134L213
Person / Time
Issue date: 08/26/1985
From: Edgeworth P, Luco J
NRC OFFICE OF ADMINISTRATION (ADM), STRUCTURAL & EARTHQUAKE ENGINEERING CONSULTANTS
To:
References
CON-FIN-B-8298, CON-NRC-04-83-022, CON-NRC-4-83-22
Download: ML20134L213 (1)
Notification of Contract Execution,Mod 3,to Selection of Earthquake Resistant Design Criteria for Nuclear Power Plants,Methodology & Technical Bases. Contractor:Structural & Earthquake Engineering Consultants,Inc
ML20134L210
Person / Time
Issue date: 08/26/1985
From: Wollett S
NRC OFFICE OF ADMINISTRATION (ADM)
To: GUSTAVE R, MURPHY A
NRC, NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
References
CON-FIN-B-8298, CON-NRC-04-83-022, CON-NRC-4-83-22
Download: ML20134L210 (1)