ML20134K880
| ML20134K880 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 11/15/1996 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Cottle W HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20134K883 | List: |
| References | |
| NUDOCS 9611200077 | |
| Download: ML20134K880 (5) | |
See also: IR 05000498/1996023
Text
c
[g8 "'%,I
UMIT ED STATES
,
I
,,
t
NUCLEAR REGULATORY COMMISSION
.,
REGloN Iv
- " .
C
6
611 RYAN PLAZA DRIVE. SulTE 400
-
'% . . + [
. ' .
,
NOV i 51996
.
I
i
i
[
William T. Cottle, Group Vice
President, Nuclear
Houston Lighting & Power Company
P.O. Box 289
i
Wadsworth, Texas -77483
SUBJECT: NRC INSPECTION REPORT 50-498/96-23:50-499/96-23
.
i
l
Dear Mr. Cottle:
1
An NRC inspection was conducted October 29 through November 1,1996, at your South
Texas Project Electric Generating Station, Units 1 and 2, reactor facilities. The enclosed
!
report presents the scope and results of that inspection.
l
r
l
The inspection included implementation of your emergency plan and procedures during
l
-your biennial emergency preparedness exercise. The results indicated that you
l
successfully demonstrated the capability to implement your approved emergency plan.
Overall performance was very good; however, one exercise weakness was identified for
failure to communicate timely protective measures to offsite field teams. The failure could
,
l~
have affected personnel safety and the ability to obtain timely field measurements and
(
samples. Your staff questioned the characterization of the exercise weakness during a
followup discussion on November 12,1996.
l
Exercise weaknesses, according to 10 CFR Part 50, Appendix E.IV.F.2.g, are inspection
l
findings that need to be corrected by the licensee. You are requested to provide this office
!
with a description of your corrective measures, and your schedule for completing these
actions, within 30 days after receipt of this letter.
l
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
i
Sincerely,
4
/.3-
p Thomas P. Gwynn, Director
Division of Reactor Safety
j
,
l
i
"
'
9611200077 961115
ADOCK 05000498
-
G
l.
.
i
!
Houston Lighting & Power Company .
{
-2-
!
!
l
Docket Nos.: 50-498;50-499
'!
' License Nos.: NPF-76; NPF-80
l
!
Enclosure'
!
- NRC inspection Report
l
50-498/96-23;50-499/96-23
i
-cc w/ enclosure:
i
Lawrence E. Martin, General Manager
Nuclear Assurance & Licensing
j
Houston Lighting & Power Company
P.O. Box 289
i
Wadsworth, Texas 77483
i
l
Mr. J. C. Lanier/Mr. M. B. Lee
!
City of Austin
.l
Electric Utility Department
'!
721 Barton Springs Road
~
~
Mr. K. J. Fiedler/Mr. M. T. Hardt
City Public Service Board -
i
P.O. Box 1771
i
San Antonio, Texas 78296
-l
!
Jack R. Newman, Esq.
)
1800 M. Street, N.W.
l
Washington, D.C. 20036-5869
Mr. G. E. Vaughn/Mr. C. A. Johnson
Central Power & Light Company
P.O. Box 289
Mail Code: N5012
Wadsworth, Texas . 77483
' Records Center
700 Galleria Parkway
Atlanta, Georgia 30339 5957
Dr. Bertram Wolfe
15453 Via Vaquero
Monte Sereno, California 95030
l
J
.-
i
1
.
Houston Lighting & Power Company
-3-
!
Bureau of Radiation Control
l
State of Texas .
l
1100 West 49th Street
{
Andy Barrett, Director
Environmental Policy
Office of the Governor
j
P.O. Box 12428
. )
i
.
Judge, Matagorda County
-
.
Matagorda County Courthouse
!
Bay City, Texas 77414
. j
1700 Seventh Street
'
!
Licensing Representative
{
~
Houston Lighting & Power Company
,
Suite 610
!
Three Metro Center
.
Bethesda, Maryland 20814
-
Rufus S. Scott, Associate
)
General Counsel
~
Houston Lighting & Power Company
P.O. Box 61867
Houston,' Texas 77208
Joseph R. Egan, Esq.
Egan &' Asso'ciates, P.C.
2300 N Street, N.W.
Washington, D.C. 20037
Mr. J. W. Beck
Little Harbor Consultants, Inc
4
44 Nichols Road
Cohasset, MA 02025-1166
.
_ _ _
d
b
'
\\
'
Houston Lighting & Power Company
-4-
)
!
l
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
"
,bc_c_to_ DMB (IE35)
bec distrib. by RIV:
L. J. Callan
Resident inspector
,
DRP Director
DRS-PSB
Branch Chief (DRP/A)
MIS System
Project Engineer (DRP/A)
RIV File
Branch Chief (DRP/TSS)
R. Bachmann, OGC (MS: 15-B-18)
.
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
T. Essig (NRR/DRPM/PERB)
DRS Al 96-G-08%
!
i
DOCUMENT NAME: R:\\_STP\\ST623RP.GMG
To receive copy of document. Indicate in box: "C" = Copy wthout enclosures "E" = Copy with enclosures "N" = No copy
]
RIV:SEPA:PSB l f
RE: OPS
C
EPS:NRR l N
RI:DRP
N
C:PSB
l,
GMGood/imb (M(g HEBund @
EFFox Jr. pgs\\ WCSifre 9q.# BMurray
f)
1143/96
11 A>/96
11/12/96
11/08/96
11/d/96
j
D:DRP
A
D:DRS J
l
JEDyer LN
TPGwynrfL
l
11 $ 6
(]
)
11/W96 F
OFFICIAL RECORD COPY
4
l
200010
-
..
..
-
-
-
-
.
.,
.
Houston Lighting & Power Company
-4-
,
i
E-Mail report to D. Nelson (DJN)
'
E-Mail report to NRR Event Tracking System (IPAS)
bec to DMB (IE35)
bec distrib. by RIV:
'
L. J. Callan
Resident inspector
DRP Director
DRS-PSB
,
Branch Chief (DRP/A)
MIS System
Project Engineer (DRP/A)
RIV File
i
Branch Chief (DRP/TSS)
R. Bachmann, OGC (MS: 15-B-18)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
T. Essig (NRR/DRPM/PERB)
DRS Al 96-G-08%
{
.
i
'
I
l
1
DOCUMENT NAME: R:\\_STP\\ST623RP.GMG
To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:SEPA:PSB
E
RE: OPS
E
EPS:NRR l hl
RI:DRP
tJ
C:PSB
l,
GMGood/Imb (M(c.f HEBund @
EFFox Jr. [yM WCSifre wy.# BMurray
f)
1143/96
11 4/96
11/12/96
11/08/96
1143/96
D:DRP
A
D:DRS J
JEDyer bA
TPGwynr@
11 $ 6 (j
)
11/W96 V
~
OFFICIAL RECORD COPY